Stats On Project Data 1

Over 31% of projects had increasing negative slippage, with bridge projects also increasing negatively. Around 17% of projects and 5% of bridge projects showed decreasing negative slippage. Nearly 15% of projects had no updates while under 5% had positive slippage or were completed. The majority of projects had overall negative slippage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Stats On Project Data 1

Over 31% of projects had increasing negative slippage, with bridge projects also increasing negatively. Around 17% of projects and 5% of bridge projects showed decreasing negative slippage. Nearly 15% of projects had no updates while under 5% had positive slippage or were completed. The majority of projects had overall negative slippage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Category Number %

Projects with increasing negative slippage 26 31.71% 4.88%


Projects with increasing negative slippage
Bridge Projects with increasing negative slippage 2 2.44%
Bridge Projects with increasing negative
Projects with decreasing negative slippage 14 17.07%
slippage
Bridge Projects with decreasing negative slippage 4 4.88% 19.51%
Projects with decreasing negative slippage
31.71%
Projects with no updates 12 14.63%
Projects with Positive Slippage 4 4.88% Bridge Projects with decreasing negative
New Projects 16 19.51% slippage
Completed Projects as per Report 4 4.88% Projects with no updates
4.88%
Total 82 100.00%
Projects with Positive Slippage
2.44%
New Projects
14.63%
Completed Projects as per Report
17.07%
4.88%

Notes:
1. 26 projects and 2 bridge projects (34.15% of the total projects) increase their negative slippages with an average of (-3.19%). 100% of 26 projects consistently increase its negative slippage.
2. 14 projects and 4 bridge projects (21.87% of the projects) decrease their negative slippages with an average of (2.45%).
3. Only 12 projects have no updates (WER)
4. Only 4 projects or 4.88% of the total projects have positive slippage with an average of 12.93%. However, the positive slippage decreases with an average -0.62%
5. Only one (1) in house project (The Grid) is included in this report.
6. 16 new projects are yet to commence with 4 completed projects reported.
7. 62 projects (75.61% of the total projects) have negative slippage.