0% found this document useful (0 votes)
138 views

Work Completion

The work completion report summarizes hull repair work on the vessel JAEGER 2. Before and after photos document plate replacement and welding repairs across multiple areas of the hull, including the bottom plate, tank compartments, and starboard side. Over 80 photos show the repairs in detail. The hull engineer and another staff member certified that the work was completed according to specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views

Work Completion

The work completion report summarizes hull repair work on the vessel JAEGER 2. Before and after photos document plate replacement and welding repairs across multiple areas of the hull, including the bottom plate, tank compartments, and starboard side. Over 80 photos show the repairs in detail. The hull engineer and another staff member certified that the work was completed according to specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Work Completion Report Reference No: SY2/JAEGER2/Hull-001

Vessel Name JAEGER 2


Work Scope No HULL REPAIR
Sub Code
Job Description : Cut ,Replate & Welding
Location : Gantry Crane 100T Area

* PLEASE REFER TO NEXT PAGE FOR PICTURE, DETAILS MATERIAL AND REPAIR PROCESS INCUDING TOTAL AREA AND
WEIGHT OF MATERIALS USED.

The undersigned hereby certify and confirm the above mentioned had been carried out in accordance
with job requirement , specifications to our satisfaction in all aspect.

----------------------------------------- -----------------------------------------
Name : CHERRY MAY Name :
Designation : Hull Engineer Designation :
Date : Date :
Before After

stbd

stbd

stbd
Before After

Aft

Aft
Aft

Before After

Stbd side

Aft Stbd side


main deck

Before After

bottom plate

bottom plate
tank compartment

Before After

tank compartment

tank compartment
tank compartment

1
2
3
Before After 4
5
6
7
8
9
10
11
12
13
14
tank compartment 15
16
17
18
19
20
21
22
23
24
25
tank compartment 26
27
28
29
30
31
32
33
34
35
36
tank compartment 37
38
39
40
41
1
2
3
Before After 4
1
2
3
4
5
6
7
8
9
10
11
12
bottom plate 16
1
2
3
4
5
6
7
8
9
10

11
tank compartment 28
1
2
3
4
5
6
7
8
9
10

11
tank compartment 40
41
42
3
Before After
1
2
3
4
5
6
7
8
9
10
11
12
Fwd
1
2
3
4
5
6
7
8
9
10
11
12
Fwd
1
2
3
4
5
6
7
8
9
10
11
12
Stbd side

Before After
1
2
3
4
5
6
7
8
9
10
11
12
sample
1
2
3
4
5
6
7
8
9
10
11
12
Sample
1
2
3
4
5
6
7
8
9
10
11
12
sample

45
46
47
Before After 48
49
50
51
52
53
54
55
56
57
58
59
60
sample 61
62
63
64
65
66
67
68
69
70
71
72
73
Sample 74
75
76
77
78
79
80
81
82
83
84
85
86
sample 87
88

You might also like