CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES CONSORTIUM
CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH PT. ISTANA KARANG LAUT
1 X X 41
2 X X 42
3 X X 43
4 X 44
5 X X 45
6 X X 46
7 X 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80 Sheet Number :
Employer Document Number : Contractor Document Number: Fabricator Document Number: 2 Sheet
OF Number
2 :
222-Q-PL-3000-03 R057-AC-IT-003 2 of 7
NSORTIUM
RANG LAUT
eet Number :
2 Sheet
OF Number
2 :
2 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
1.4 Approval of Welders/Welding Operators AWS D1.1 Welder Certs. Welder Certs. H R
Approved
1.5 Approval of NDE Procedures AWS D1.1 NDE Procedures H R
NDE Procedures
NDE Personnel's NDE Personnel's
1.6 Approval of NDE Personnel SNT-TC-1A H R
Certificates Certificates
Page 3 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
2.1 Review of Mill Certificates AWS D1.1 & ASTM Mill Certificates Mill Certificates H R
2.2 Visual Inspection of Materials AWS D1.1 & ASTM Mill Certificates Mill Certificates H M
2.3 Dimensional Check of Material AWS D1.1 & ASTM Mill Certificates Mill Certificates H M
Approved
3.1 Marking and Lay Out of Skid - - H M
Construction Drawing
Approved
3.2 Fit Up of Skid - - H M
Construction Drawing
Approved
3.3 Welding of Skid Joints - - H M
Construction Drawing
Approved
3.4 Welding of Weld Repair Joints - - H M
Construction Drawing
Page 4 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
4.1 100% Visual Inspection of All Joints AWS D1.1 Inspection Report Inspection Report H R
4.2 NDT as per Approved Weld Map AWS D1.1 NDT Report NDT Report H R
4.3 Re-NDT After Weld Repair AWS D1.1 NDT Report NDT Report H R
5.2 Post-Weld Dimensional Check AWS D1.1 Inspection Report Inspection Report H M
Page 5 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
7.1 Final Review and Certification of MDR Approved MDR Table of Contents MDR MDR H R
Legend:
Hold Point ( H ) : An inspection, test, non-destructive examination or fabrication operation that must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the requ
point shall not be continued prior to having been examined and released by a specified party
Page 6 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -
Monitor Point ( M ) : Monitor the Inspection which on random/sampling nature. Notification may not be required
Review Point ( R ) : An inspection which is conducted by reviewing as system or document related to i.e. reviewing RT films, reviewing ITP or reviewing of quality system
Page 7 of 7
: R057-AC-IT-003
: 30-Dec-16
Page 8 of 7
: R057-AC-IT-003
: 30-Dec-16
Page 9 of 7
: R057-AC-IT-003
: 30-Dec-16
Page 10 of 7
: R057-AC-IT-003
: 30-Dec-16
must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the required hold
a specified party
Page 11 of 7
: R057-AC-IT-003
: 30-Dec-16
s designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to proceed
performing the designated operation
y not be required
Page 12 of 7