R057-Ac-It-003 (C) - Inspection and Test Plan For Skid Structure

This document outlines the inspection and test plan for the skid structure and instrument air compressor package for a condensate fractionation plant project in Bangladesh. It lists the parties involved, including the fabricator, contractor, and client. It provides acceptance criteria and documents required for approving items like construction drawings, welding procedures, non-destructive examination plans, and personnel qualifications to ensure quality control. The plan specifies which parties are responsible for certifying and verifying each inspection item.

Uploaded by

dharwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
202 views

R057-Ac-It-003 (C) - Inspection and Test Plan For Skid Structure

This document outlines the inspection and test plan for the skid structure and instrument air compressor package for a condensate fractionation plant project in Bangladesh. It lists the parties involved, including the fabricator, contractor, and client. It provides acceptance criteria and documents required for approving items like construction drawings, welding procedures, non-destructive examination plans, and personnel qualifications to ensure quality control. The plan specifies which parties are responsible for certifying and verifying each inspection item.

Uploaded by

dharwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 14

PROJECT TITLE :

CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES


CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH
EMPLOYER :

SYLHET GAS FIELDS LIMITED


DOCUMENT TITLE :

INSPECTION AND TEST PLAN


FOR SKID STRUCTURE
INSTRUMENT AIR COMPRESSOR PACKAGE
DOCUMENT STATUS
Approved
:

Approved
: as Noted

Not Approved

C DEC 30, 2016 ISSUED FOR CONSTRUCTION EK RDH DA


B DEC 22, 2016 ISSUED FOR APPROVAL EK RDH DA
A DEC 15, 2016 ISSUED FOR REVIEW EK RDH DA
ENG EM
REV. DATE DESCRIPTION PREPARED
CHECKED

TOTAL OR PARTIAL REPRODUCTION AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN


WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER

VENDOR : Contractor Job No. : C - 222 / 2015 CONTRACTOR :


Contractor Document No. : 222-Q-PL-3000-03 CONSORTIUM
Employer Document No. :
Vendor Document No. : R057-AC-IT-003
PT. ROTEQ Page No. : 1 OF 7
ACILITIES

SH

HH
HH
HH
PM
APPROVED

ORBIDDEN

NSORTIUM
VENDOR : CONTRACTOR :
CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES CONSORTIUM
CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH PT. ISTANA KARANG LAUT

PT. ROTEQ ENERGYPAC POWER GENERATION LTD


INSPECTION AND TEST PLAN

TABULATION OF REVISED SHEETS


Revision Revision
Sheet Sheet
A B C

1 X X 41
2 X X 42
3 X X 43
4 X 44
5 X X 45
6 X X 46
7 X 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80 Sheet Number :
Employer Document Number : Contractor Document Number: Fabricator Document Number: 2 Sheet
OF Number
2 :
222-Q-PL-3000-03 R057-AC-IT-003 2 of 7
NSORTIUM
RANG LAUT

OWER GENERATION LTD

eet Number :
2 Sheet
OF Number
2 :
2 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

1.0 PROJECT QUALITY & CONSTRUCTION PROCEDURE

1.1 Pre-Inspection Meeting Confirmed PO - - H H

Drawings & As Built Drawings


1.2 Approval of Construction Drawings & Welding Maps AWS D1.1 H R
Welding Maps & Welding Maps

Approved WPS &


1.3 Approval of WPS & PQR AWS D1.1 WPS & PQR H R
PQR

1.4 Approval of Welders/Welding Operators AWS D1.1 Welder Certs. Welder Certs. H R

Approved
1.5 Approval of NDE Procedures AWS D1.1 NDE Procedures H R
NDE Procedures
NDE Personnel's NDE Personnel's
1.6 Approval of NDE Personnel SNT-TC-1A H R
Certificates Certificates

Blasting & Blasting &


1.7 Approval of Blasting & Painting Procedure 222-L-SP-004 Rev. B H R
Painting Procedure Painting Procedure

2.0 MATERIAL INSPECTION AND TRACEABILITY

Page 3 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

2.1 Review of Mill Certificates AWS D1.1 & ASTM Mill Certificates Mill Certificates H R

2.2 Visual Inspection of Materials AWS D1.1 & ASTM Mill Certificates Mill Certificates H M

2.3 Dimensional Check of Material AWS D1.1 & ASTM Mill Certificates Mill Certificates H M

3.0 FABRICATION, WELDING AND INSTALLATION

Approved
3.1 Marking and Lay Out of Skid - - H M
Construction Drawing

Approved
3.2 Fit Up of Skid - - H M
Construction Drawing

Approved
3.3 Welding of Skid Joints - - H M
Construction Drawing

Approved
3.4 Welding of Weld Repair Joints - - H M
Construction Drawing

4.0 INSPECTION & TESTING

Page 4 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

4.1 100% Visual Inspection of All Joints AWS D1.1 Inspection Report Inspection Report H R

4.2 NDT as per Approved Weld Map AWS D1.1 NDT Report NDT Report H R

4.3 Re-NDT After Weld Repair AWS D1.1 NDT Report NDT Report H R

5.0 DIMENSIONAL CONTROL

5.1 Pre-Weld Dimensional Check AWS D1.1 - - H R

5.2 Post-Weld Dimensional Check AWS D1.1 Inspection Report Inspection Report H M

5.3 Check of Completeness Approved GA & Detail Drawings - - H W

6.0 SURFACE PREPARATION AND PAINTING


Approved Blasting & Paint Material Paint Material
6.1 Check Paint Material (Batch Cert.) H R
Painting Procedure Certificates Certificates
Approved Blasting &
6.2 Check Surface Preparation Inspection Report Inspection Report H M
Painting Procedure

Page 5 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign
Approved Blasting &
6.3 Painting Application Inspection Report Inspection Report H M
Painting Procedure
Approved Blasting &
6.4 Check DFT of Primer Coat Inspection Report Inspection Report H M
Painting Procedure
Approved Blasting &
6.5 Check DFT of Intermediate Coat Inspection Report Inspection Report H M
Painting Procedure
Approved Blasting &
6.6 Check DFT of Top/Final Coat Inspection Report Inspection Report H M
Painting Procedure
Approved Blasting &
6.7 Records Inspection Report Inspection Report H R
Painting Procedure
Approved Blasting &
6.8 Pre Shipment Inspection Inspection Report Inspection Report H H
Painting Procedure

7.0 MANUFACTURING DATA RECORD (MDR)

7.1 Final Review and Certification of MDR Approved MDR Table of Contents MDR MDR H R

Legend:
Hold Point ( H ) : An inspection, test, non-destructive examination or fabrication operation that must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the requ
point shall not be continued prior to having been examined and released by a specified party

Page 6 of 7
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-003
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : SKID STRUCTURE - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign
Witness Point ( W ) : An inspection, test, non destructive examination or fabrication operation that is designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to p
the activity. The specified party must be notified sufficiently in advance prior to performing the designated operation

Monitor Point ( M ) : Monitor the Inspection which on random/sampling nature. Notification may not be required

Review Point ( R ) : An inspection which is conducted by reviewing as system or document related to i.e. reviewing RT films, reviewing ITP or reviewing of quality system

Page 7 of 7
: R057-AC-IT-003

: 30-Dec-16

N AND TEST PLAN


INSPECTION PARTIES

Page 8 of 7
: R057-AC-IT-003

: 30-Dec-16

N AND TEST PLAN


INSPECTION PARTIES

Page 9 of 7
: R057-AC-IT-003

: 30-Dec-16

N AND TEST PLAN


INSPECTION PARTIES

Page 10 of 7
: R057-AC-IT-003

: 30-Dec-16

N AND TEST PLAN


INSPECTION PARTIES

must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the required hold
a specified party

Page 11 of 7
: R057-AC-IT-003

: 30-Dec-16

N AND TEST PLAN


INSPECTION PARTIES

s designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to proceed
performing the designated operation

y not be required

elated to i.e. reviewing RT films, reviewing ITP or reviewing of quality system

Page 12 of 7