Material Submittal (MAR) - "M" MECHANICAL 10/7/2018

This document provides project details and status updates for material submittals and shop drawings for the SPEARS 88 project. It includes information on mechanical, electrical, and plumbing submittals for various systems and components. The status of each submittal is tracked, including dates submitted to and received from the consultant, duration of review, and current approval or rejection status.

Uploaded by

Fady Abdel Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views10 pages

Material Submittal (MAR) - "M" MECHANICAL 10/7/2018

This document provides project details and status updates for material submittals and shop drawings for the SPEARS 88 project. It includes information on mechanical, electrical, and plumbing submittals for various systems and components. The status of each submittal is tracked, including dates submitted to and received from the consultant, duration of review, and current approval or rejection status.

Uploaded by

Fady Abdel Aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Project: SPEARS 88

Project Manager: TRUSTHOLD DEVELOPMENT GROUP


Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document
Material Submittal [MAR]-"M" MECHANICAL
Updated 10/7/2018
DOC Description Date to Date from Duration Status
Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected

MAR M001 UPVC PIPES 0 10/28/2017 11/9/2017 12 X

M002 Pressure PVC pipes PN 10 0 10/28/2017 11/9/2017 12 X

M003 Drainage fittings and accessories 0 10/28/2017 11/9/2017 12 X

M004 Galvanized steel and black steel accessories 0 10/28/2017 11/9/2017 12 X

M005 Supports and anchors 0 10/28/2017 11/9/2017 12 X


M005 Supports and anchors 1 11/15/2017 12/5/2017 20 X

M006 Black Steel Pipe 0 10/28/2017 11/9/2017 12 X

M007 Galvanized Steel Pipe 0 10/28/2017 11/9/2017 12 X

M008 PPR Pipes 0 10/28/2017 11/9/2017 12 X


M008 PPR Pipes 1 11/15/2017 12/5/2017 20 X

M009 Hot Water Tank 0 10/28/2017 11/9/2017 12 X


M009 Hot Water Tank 1 11/15/2017 12/5/2017 20 X

M010 PVC pressure Fittings 0 11/15/2017 12/5/2017 20 X

M011 Two Hour Fire Rated Insulation Section (15890) 0 11/15/2017 12/5/2017 20 X

M012 Roof Vent Cap 0 11/15/2017 12/5/2017 20 X

M013 Solvent, Adhesive and Cleaner 0 11/15/2017 12/5/2017 20 X

M014 Galvanized Seamless Pipe 0 11/29/2017 12/12/2017 13 X

M015 VALVES 0 11/29/2017 12/12/2017 13 X

M016 GROOVED FITTINGS 0 11/29/2017 12/12/2017 13 X

M017 DOUBLE SEAL MANHOLE COVER 0 12/9/2017 12/22/2017 13 X

M018 GUTTER 0 12/9/2017 12/22/2017 13 X


Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document
Material Submittal [MAR]-"E" ELECTRICAL
Updated 10/7/2018
DOC Description Date to Date from Duration Status
Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected

MAR E001 Wires and Cables - Liban Cable 0 10/28/2017 11/9/2017 12 X

E002 Disconnect Switch - Katco 0 10/28/2017 11/9/2017 12 X

E003 PVC Conduits - Decoduct 0 10/28/2017 11/9/2017 12 X

E004 Polyethylene Conduits - Machco 0 10/28/2017 11/9/2017 12 X

E005 Fire Alarm Cable-Ramcro 0 10/28/2017 11/9/2017 12 X

E006 Earthing & Lightning - Wallis/France Paratonnerres 0 10/28/2017 11/9/2017 12 X

E007 Wall Boxes - Beticino 0 10/28/2017 11/9/2017 12 X

E008 Cable Tray - Fimi 0 10/28/2017 11/9/2017 12 X

E009 Data Cable - Le Grand 0 10/28/2017 11/9/2017 12 X


E009 Data Cable - Le Grand 1 11/29/2017 12/5/2017 6 X

E010 Wiring Devices - Arteor (White) 0 11/29/2017 12/5/2017 6 X

E011 Panel Boards & Breakers - Eaton 0 11/29/2017 12/5/2017 6 X


Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document
Documents Transmittal [DT] - "E" Electrical
Updated 10/7/2018
Description Date to Date from Duration Status
DOC Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected

DT
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document Documents Transmittal [DT] - "M"


Mechanical
Updated 10/7/2018
Description Date to Date from Duration Status
DOC Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected

DT
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document
Shop Drawings Submittals [SDS] - "M" Mehcanical
Updated 10/7/2018
Description Date to Date from Duration Status
Rev
DOC Trade Dwg # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
#

SDS M01 Underground Drainage Layout 0


M001 Underground Drainage Layout 0 10/19/2017 10/28/2017 9 X

M01 Underground Drainage Layout 1


M-401 6TH BASEMENT RAFT DRAINAGE LAYOUT 1 11/6/2017 11/9/2017 3 X
M-B01 BUILDER'S WORK 1 11/6/2017 11/9/2017 3 X

M02 Basement 6 Mechanical Layout 0


WS-01 SPEARS 1788-B6- WATER SUPPLY LAYOUT 0 12/6/2017 12/20/2017 14 X
VAC-01 SPEARS 1788-B6-HVAC LAYOUT 0 12/6/2017 12/20/2017 14 X
FF-01 SPEARS 1788-B6- FIRE FIGHTING LAYOUT 0 12/6/2017 12/20/2017 14 X
CO-01 SPEARS 1788-B6- COMPOSITE LAYOUT 0 12/6/2017 12/20/2017 14 X
DT-01 SPEARS 1788-B6- DETAIL LAYOUT 0 12/6/2017 12/20/2017 14 X

M02 Basement 6 Mechanical Layout 1


WS-01 SPEARS 1788-B6- WATER SUPPLY LAYOUT 1 1/5/2018 1/18/2018 13 X
VAC-01 SPEARS 1788-B6-HVAC LAYOUT 1 1/5/2018 1/18/2018 13 X
FF-01 SPEARS 1788-B6- FIRE FIGHTING LAYOUT 1 1/5/2018 1/18/2018 13 X
C0-01 SPEARS 1788-B6- COMPOSITE LAYOUT 1 1/5/2018 1/18/2018 13 X
EMC SPEARS 1788-B6- EM COMPOSITE 1 1/5/2018 1/18/2018 13 X
DR-02 SPEARS 1788-B6- HIGH LEVEL DRAINAGE 0 1/5/2018 1/18/2018 13 X
BW-02 SPEARS 1788-B6- BUILDER'S WORK 0 1/5/2018 1/18/2018 13 X

M03 Water Tank 0


WS-01 SPEARS 1788-B6- WATER TANK DETAIL 0 12/22/2017 12/29/2017 7 X

M03 Water Tank 1


WS-01 SPEARS 1788-B6- WATER TANK DETAIL 1 1/3/2018 1/9/2018 6 X

M03 Water Tank 2


WS-01 SPEARS 1788-B6- WATER TANK DETAIL 2 1/9/2018 1/11/2018 2 X

M04 Basement 5 Mechanical Layout 1


WS-02 SPEARS 1788-B5- WATER SUPPLY LAYOUT 1 1/17/2018 10/7/2018 263
VAC-02 SPEARS 1788-B5-HVAC LAYOUT 1 1/17/2018 10/7/2018 263
FF-02 SPEARS 1788-B5- FIRE FIGHTING LAYOUT 1 1/17/2018 10/7/2018 263
C0-02 SPEARS 1788-B5- COMPOSITE LAYOUT 1 1/17/2018 10/7/2018 263
EMC-02 SPEARS 1788-B5- EM COMPOSITE 1 1/17/2018 10/7/2018 263
DR-02 SPEARS 1788-B5- HIGH LEVEL DRAINAGE 0 1/17/2018 10/7/2018 263
BW-02 SPEARS 1788-B5- BUILDER'S WORK 0 1/17/2018 10/7/2018 263
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING

Document
Shop Drawings Submittals [SDS] - "E" Electrical
Updated 10/7/2018
Description Date to Date from Duration Status
Rev
DOC Trade Dwg # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
#

SDS E01 Basement 6 Electrical drawings 0


EAC-01 Basement 6 Outlet Boxes for AC Layout 0 10/28/2017 11/9/2017 12 X
EL-01 Basement 6 Lighting Layout 0 10/28/2017 11/9/2017 12 X
EP-01 Basement 6 Power Layout 0 10/28/2017 11/9/2017 12 X
EX-01 Basement 6 Extra Low Voltage Layout 0 10/28/2017 11/9/2017 12 X
ECC-01 Basement 6 Ceiling Composite Layout 0 10/28/2017 11/9/2017 12 X
EWC-01 Basement 6 Wall Composite Layout 0 10/28/2017 11/9/2017 12 X
EEMC-01 Basement 6 Electro-Mechanical Composite Layout 0 10/28/2017 11/9/2017 12 X

E01 Basement 6 Electrical drawings 1


EP-01 Basement 6 Power Layout 1 12/8/2017 12/20/2017 12 X
EEMC-01 Basement 6 Electro-Mechanical Composite Layout 1 12/8/2017 12/20/2017 12 X

E02 Basement 5 Electro-Mechanical Composite Layout 0


EEMC-02 Basement 5 Electro-Mechanical Composite Layout 0 12/12/2017 12/20/2017 8 X

E02 Basement 5 Electrical drawings 0


EAC-02 Basement 5 Outlet Boxes for AC Layout 0 1/17/2018 10/7/2018 263
EL-02 Basement 5 Lighting Layout 0 1/17/2018 10/7/2018 263
EP-02 Basement 5 Power Layout 0 1/17/2018 10/7/2018 263
EX-02 Basement 5 Extra Low Voltage Layout 0 1/17/2018 10/7/2018 263
ECC-02 Basement 5 Ceiling Composite Layout 0 1/17/2018 10/7/2018 263
EWC-02 Basement 5 Wall Composite Layout 0 1/17/2018 10/7/2018 263
EEMC-02 Basement 5 Electro-Mechanical Composite Layout 0 1/17/2018 10/7/2018 263
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
Document
REQUEST FOR INFORMATION [RFI] - "E"
ELECTRICAL
Updated
10/7/2018
DOC Description Rev. # Date to Date from Duration
Trade
Consult. Consult. D1 D2
RFI
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
Document
REQUEST FOR INFORMATION [RFI] - "M"
MECHANICAL
Updated
10/7/2018
DOC Description Rev. # Date to Date from Duration
Trade
Consult. Consult. D1 D2
RFI
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
Document
REQUEST FOR INSPECTION [FIR] - "E"
ELECTRICAL
Updated
10/7/2018
DOC Description Rev. # Date to Date from Duration
Trade
Consult. Consult. D1 D2
FIR
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
Document
REQUEST FOR INSPECTION [FIR] - "M"
MECHANICAL
Updated
10/7/2018
DOC Description Rev. # Date to Date from Duration
Trade
Consult. Consult. D1 D2

M01 Drainage & rain water pipes laid in raft at level 40.44 0 12/11/2017 12/11/2017 0
FIR

M02 Drainage & rain water pipes laid in raft at level 41.3 0 12/15/2017 12/15/2017 0

M03 Water Tank reservations and sleeves 0 1/22/2018 1/22/2018 0