The document is a cycle time chart that outlines the processes and time needed to complete a stud and nut bolt robot process for a dash panel project. The total cycle time is 130 seconds. The process involves 10 steps including transferring parts, setting parts, performing stud bolt processes on the interior and engine sides, and rotating the part. The longest individual processes are the stud bolt processes which take 42 and 48 seconds respectively.
The document is a cycle time chart that outlines the processes and time needed to complete a stud and nut bolt robot process for a dash panel project. The total cycle time is 130 seconds. The process involves 10 steps including transferring parts, setting parts, performing stud bolt processes on the interior and engine sides, and rotating the part. The longest individual processes are the stud bolt processes which take 42 and 48 seconds respectively.