Version. ENG: Cycle Time Chart

The document is a cycle time chart that outlines the processes and time needed to complete a stud and nut bolt robot process for a dash panel project. The total cycle time is 130 seconds. The process involves 10 steps including transferring parts, setting parts, performing stud bolt processes on the interior and engine sides, and rotating the part. The longest individual processes are the stud bolt processes which take 42 and 48 seconds respectively.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Version. ENG: Cycle Time Chart

The document is a cycle time chart that outlines the processes and time needed to complete a stud and nut bolt robot process for a dash panel project. The total cycle time is 130 seconds. The process involves 10 steps including transferring parts, setting parts, performing stud bolt processes on the interior and engine sides, and rotating the part. The longest individual processes are the stud bolt processes which take 42 and 48 seconds respectively.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CYCLE TIME CHART Version.

ENG

PROJECT Dash Panel Robot


809A/810A/230_1B APPROVED. YY / MM / DD

PLAN NO. UAC R/L CHECKED YY / MM / DD

PROCESS NAME Stud & Nut Bolt Robot Process DRAWN YY / MM / DD

CYCLE TIME 130 SEC TACT 192 SEC


WELD NO STD TOTAL 130sec
130sec
WORK PROCESS TIME
FREQ TIME TIME 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230
Part
1 JIG Transfer
SHIFT, From
ADVANCE, UDA-2
AUTO
UA13
UA52a
4 4 4 〓

〓〓
LifterSET
2 PARTS Down 53717 3 3 7 〓〓

Matehan
3 JIG Sel ModelMANUAL
SHIFT, ADVANCE, & P/Up Part UA52b,c 4 4 11 〓〓
〓〓
SSW Process
4 PARTS SET Interior Side 53710 2 3 6 17 〓
〓〓
〓〓

Robot
5 JIG Rotate
SHIFT, PartMANUAL
ADVANCE, UA41 3 3 20 〓〓

SSW Process
6 PARTS SET Engine Side 53707 1 3 3 23 〓


Robot
7 JIG SHIFT,Move to NSW
ADVANCE, MANUAL UA31 3 3 26 〓
〓〓
Stud START
8 PUSH Bolt Process Interior
BUTTON (KEEP) ALL 7 6 42 68 〓
〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓


Robot
9 JIG Rotate
CLAMP, AUTO ALL 3 3 71 〓
〓〓
10 P/G PREPARATION
Stud Bolt Process Engine Side 8 6 48 119 〓
〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
〓〓

〓〓
Robot
11 SPOT Move to
WELDING, P/GT/O Stand
TACK X GUN 3 3 122 〓〓

12 P/G CHANGE
Robot Set Part To Hanger 4 4 126 〓〓
〓〓
DashWELDING,
13 SPOT TransferP/GT/O
TACK C GUN 4 4 130 〓
〓〓

14 P/G RETURN

15

16

17 JIG SHIFT, RETURN, AUTO


PARTS LOADING, TO S/A
18
RACK/SHOOTER
19 RETURN WALK

20

21

22

23

24

25