0% found this document useful (0 votes)
214 views5 pages

General Data and Information

This document summarizes the testing of an energy metering system. It includes: 1) General information about the meter such as manufacturer, ratings, and test equipment used. 2) Mechanical and visual inspections of the meter. 3) Verification of the programmed display sequence. 4) Secondary injection calibration, accuracy, and pulse count checks at various power factors and voltages. 5) Details of the test equipment used.

Uploaded by

Sunil Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views5 pages

General Data and Information

This document summarizes the testing of an energy metering system. It includes: 1) General information about the meter such as manufacturer, ratings, and test equipment used. 2) Mechanical and visual inspections of the meter. 3) Verification of the programmed display sequence. 4) Secondary injection calibration, accuracy, and pulse count checks at various power factors and voltages. 5) Details of the test equipment used.

Uploaded by

Sunil Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Commissioning Service Department

Commissioning Standard Test Formats


Description: ENERGY METERING TEST Record No. :
Equip. No.: Drawing ref.: Sheet : 1 of 5
Contractor : Contract no.: Substation No :

1. GENERAL DATA AND INFORMATION

Designation Type of Meter : A1800

Manufacturer : Serial No.:

CT Ratio : 1200/1A Meter Constant: Kh = 0.2

132𝑘𝑉 115𝑉
VT Ratio : ⁄ Wh/Imp = 275520
√3 √3

Meter Class 0.2, 0.5 Standard Meter CALPORT 100

2. MECHANICAL CHECKS AND VISUAL INSPECTION

ITEM DESCRIPTION CHECKED

1 Inspect for any physical damage or defects.

2 Check tightness of all bolted connections.

3 Verify connections as per approved drawing

4 Check apparatus lists

5 Test switch / plug checked for correct function

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: ENERGY METERING TEST Record No. :
Equip. No.: Drawing ref.: Sheet : 2 of 5
Contractor : Contract no.: Substation No :

3. PROGRAMMED DISPLAY SEQUENCE

1. Normal Mode :
1. VT Ratio
2. CT Ratio
3. Phase A Voltage
4. Phase A Current
5. Phase A KW
6. Phase A KVAR
7. Phase A KVA
8. Phase A Power Factor
9. Phase B Voltage
10. Phase B Current
11. Phase B KW
12. Phase B KVAR
13. Phase B KVA
14. Phase B Power Factor
15. Phase C Voltage
16. Phase C Current
17. Phase C KW
18. Phase C KVAR
19. Phase C KVA
20. Phase C Power Factor
21. Line Frequency
22. Current Billing Total KWh-Delivered
23. Current Billing Maximum KW-Delivered

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: ENERGY METERING TEST Record No. :
Equip. No.: Drawing ref.: Sheet : 3 of 5
Contractor : Contract no.: Substation No :

24. Current Billing Total KWh-Received


25. Current Billing Maximum KW- Received
26. Current Billing Total KVARh- Delivered
27. Current Billing Maximum KVAR- Delivered
28. Current Billing Total KVARh- Received
29. Current Billing Maximum KVAR- Received
2. Alternative Mode :
1. Program ID
2. Current Billing Total KWh-Delivered
3. Current Billing Rate A KWh-Delivered
4. Demand Resets (All)
5. Complete LCD Test
3. Test Mode :

4. SECONDARY INJECTION:

4.1. CALIBRATION TEST

Meter Display R Y B Remarks

Voltage (kV)

Current (kA)

KW (MW)

KVAR (MVAR)

KVA (MVA)

Power Factor

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: ENERGY METERING TEST Record No. :
Equip. No.: Drawing ref.: Sheet : 4 of 5
Contractor : Contract no.: Substation No :

4.2. ACCURACY TEST

% Error shown by
Injected Current Applied Voltage (V) Power Factor Remarks
Standard Meter
0.25 66.4 0.86

0.25 66.4 - 0.5

0.25 66.4 - 0.86

0.25 66.4 0.5

4.3. PULSE COUNT CHECK FOR 1 MINUTE

% Error shown by
Injected Current Applied Voltage (V) Power Factor Remarks
Standard Meter
1.2 66.4 1

1.2 66.4 0.86

1.2 66.4 0.5

1.00 66.4 1

1.00 66.4 0.86

1.00 66.4 0.5

0.8 66.4 1

0.8 66.4 0.86

0.8 66.4 0.5

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: ENERGY METERING TEST Record No. :
Equip. No.: Drawing ref.: Sheet : 5 of 5
Contractor : Contract no.: Substation No :

5. TEST EQUIPMENTS :
1. Megger FREJA 300 Serial No.:
Calibration Date: Due Date:
2. CALPORT 100 Serial No.:
Calibration Date: Due Date:

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:

You might also like