This non-conformance report documents an issue found during inspection of a drawing or part. It identifies the originator, contractor, drawing details, when and how the issue was discovered, and a description of the non-conformance. The report proposes a disposition of the part, such as use-as-is, repair, or reject. It also categorizes the issue as critical or non-critical and documents any corrective or preventive actions taken to address the issue and prevent future occurrences.

Uploaded by

William Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
4K views

Non Conformance Report Word Template

This non-conformance report documents an issue found during inspection of a drawing or part. It identifies the originator, contractor, drawing details, when and how the issue was discovered, and a description of the non-conformance. The report proposes a disposition of the part, such as use-as-is, repair, or reject. It also categorizes the issue as critical or non-critical and documents any corrective or preventive actions taken to address the issue and prevent future occurrences.

Uploaded by

William Jones
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Non-conformance Report

IDENTIFICATION
Originator Name: Date:
Contractor: NC No.:
Drawing No(s):
Dwg. Item No(s):

Found during what activity:


 Incoming inspection  Other
 In-process inspection
Final inspection

Description of non-conformance

Action taken to prevent misuse

DISPOSITION
 Use-as-is  Return to supplier Contractor Manager:
 Repair  Reject Name:
 Rework Date:

Categorization of NC Inspection Engineer


 Non-critical NC Name:
 Critical NC Date:

CORRECTIVE/PREVENTIVE ACTION
Description of proposed action (use continuation page if necessary)

Change / Approval of corrective/preventive action


Maintenance Name: Date:
Engineer

CLOSING THE NON-CONFORMANCE


Planned disposition has been completed and corrective/preventive action has been initiated
Responsible Name: Date: