Daily Report Coating
Daily Report Coating
Date:
Job Stamp
Day of the Week:
S M T W T F S
(circle one)
I.R. No. :
Weather
DB WB RH ST DP
Location Time ºF ºF % ºF º F
+/-
Quantities
Placed Check Check "F" if Fiscal
Item No. Location & Description Today In Out Final Share
The above described work was incorporated into this Page 2 is used for additional remarks, number of workers,
project and was inspected by: equipment used and computations.
Reviewed by:
Inspector's Signature Project Engineer Date
TA-W44110-9 (12/2006) INSPECTOR'S DAILY REPORT
Page 2 of 2 BRIDGE PAINTING
WORKFORCE Prime Sub A Sub B SURFACE PREPARATION S/U
Foremen Location:
Painters/Blasters Delaminator/Burrs
Groundsmen Bird Droppings
Laborers Chloride Test
Iron Workers Abrasive Type/Size
Mechanic Abrasive Cleanliness
Boatman Recycled Abrasive Test
Union Steward Recycled Equipmemt
Health/Safety Officer Compressed Air Check
QC Supervisor Dust/Abrasive Removal
Apprentices Degree of Cleanliness
Profile (3)
Magnetic Base Reading
Protective Covers
Blast Cleaning Start
Blast Cleaning End
EQUIPMENT Prime Sub A Sub B Blown Down
Dust Collector Inspection (time)
Compressor Inspection (time)
Blast Pots COATING APPLICATION S/U
Generator Location:
Airless Spray Pump Time from Surface Prep
Blast Platform Intercoat Cleanliness
Equipment Barge DFT's - Prev. Coat Average
No. of Readings:
Life Boat
Heaters Protective Covers
Pick-up Trucks Re-coat time observed
Utility Trucks Application Method
No./Type Guns/tips/pots
Pot Pressure (if applicable)
Coat applied
INSTRUMENT SERIAL NO.
Mixing Began
Sling Psychrometer
Thinner & %
Surface Temp. Thermometer
Pot Agitation
Wet Film Gage
Induction
DFT Gage
Paint Temperature
Spring Gage
Application Began
Gallons Used
Wet Film Thickness
Batch Numbers
Comments: