Daily Report Coating

This document is an inspector's daily report for bridge painting that contains: 1) Information about the job such as location, date, weather, and workforce. 2) A description of the work performed including surface preparation details and coating application details. 3) Instrumentation used to inspect the work and record measurements.

Uploaded by

jhdmss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

Daily Report Coating

This document is an inspector's daily report for bridge painting that contains: 1) Information about the job such as location, date, weather, and workforce. 2) A description of the work performed including surface preparation details and coating application details. 3) Instrumentation used to inspect the work and record measurements.

Uploaded by

jhdmss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TA-W44110-9 (12/2006) New York State Thruway Authority • New York State Canal Corporation Clear Form

Page 1 of 2 P.O. Box 189


Albany, New York 12201-0189
Department of Engineering
INSPECTOR'S DAILY REPORT
BRIDGE PAINTING

Date:
Job Stamp
Day of the Week:
S M T W T F S
(circle one)

I.R. No. :

Sheet No. of Sheets

If Pertinent to the Construction Operation


AM PM

Weather
DB WB RH ST DP
Location Time ºF ºF % ºF º F
+/-

Description of Work Performed and Inspected


Specify for each operation: Item No., Sub-Contractor (if any),
location and work performed.

Quantities
Placed Check Check "F" if Fiscal
Item No. Location & Description Today In Out Final Share

The above described work was incorporated into this Page 2 is used for additional remarks, number of workers,
project and was inspected by: equipment used and computations.

Reviewed by:
Inspector's Signature Project Engineer Date
TA-W44110-9 (12/2006) INSPECTOR'S DAILY REPORT
Page 2 of 2 BRIDGE PAINTING
WORKFORCE Prime Sub A Sub B SURFACE PREPARATION S/U
Foremen Location:
Painters/Blasters Delaminator/Burrs
Groundsmen Bird Droppings
Laborers Chloride Test
Iron Workers Abrasive Type/Size
Mechanic Abrasive Cleanliness
Boatman Recycled Abrasive Test
Union Steward Recycled Equipmemt
Health/Safety Officer Compressed Air Check
QC Supervisor Dust/Abrasive Removal
Apprentices Degree of Cleanliness
Profile (3)
Magnetic Base Reading
Protective Covers
Blast Cleaning Start
Blast Cleaning End
EQUIPMENT Prime Sub A Sub B Blown Down
Dust Collector Inspection (time)
Compressor Inspection (time)
Blast Pots COATING APPLICATION S/U
Generator Location:
Airless Spray Pump Time from Surface Prep
Blast Platform Intercoat Cleanliness
Equipment Barge DFT's - Prev. Coat Average
No. of Readings:
Life Boat
Heaters Protective Covers
Pick-up Trucks Re-coat time observed
Utility Trucks Application Method
No./Type Guns/tips/pots
Pot Pressure (if applicable)
Coat applied
INSTRUMENT SERIAL NO.
Mixing Began
Sling Psychrometer
Thinner & %
Surface Temp. Thermometer
Pot Agitation
Wet Film Gage
Induction
DFT Gage
Paint Temperature
Spring Gage
Application Began
Gallons Used
Wet Film Thickness
Batch Numbers