1.1 Introduction of Variation Oder / Changes Order

This document discusses variation orders and change orders in construction projects. It introduces variation orders and distinguishes them from contemplated changes. It describes how variation orders can impact both the cost and time of a construction project. Finally, it outlines different types of variation orders including changes in scope, materials, methods or equipment, changing conditions, and omissions in the original contract.

Uploaded by

Muhd Aqib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

1.1 Introduction of Variation Oder / Changes Order

This document discusses variation orders and change orders in construction projects. It introduces variation orders and distinguishes them from contemplated changes. It describes how variation orders can impact both the cost and time of a construction project. Finally, it outlines different types of variation orders including changes in scope, materials, methods or equipment, changing conditions, and omissions in the original contract.

Uploaded by

Muhd Aqib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

0 INTRODUCTION

1.1 INTRODUCTION OF VARIATION ODER / CHANGES ORDER

It is common to use the terms changes and changes order interchangeably on many project.
This is unfortunated in that a comtempled changes is quiet differents from a changes that has
been specifically ordered by the owner.

1.2 CONSTRUCTION INDUSTRY AND CONSTRUCTION CONTRACTS.

Construction volume consists primarily of new construction with the remaining portions
beings devoted either to maintenance and repair or renovation and remodeling.

1.3 VARIATION ORDER OF COST PROJECT.

changes increase the cost construction others may actually results reductions. This will
depend on nature of the changes being proposed. The owner may very well decide to reduce
the scope of a project order to realized some saving, especially if the other changes have
resulted in significant.

1.4 VARIATION ORDER OF TIME PROJECT

The variation order of time project usually impact to cost and effects to time or during to
complete construction project. If the critical activity are impacted by the changes, the project
during might very well be increased.
1.5 TYPES OF CHANGE ORDERS/ VARIATION ORDERS

1.5.1 Change in scope.

The owner ,either because of special conditions or change in his requirements, elects to
change the scope of the contract.

1.5.2 Change in materials, method, or equipment.

the change order process covers changes in materials such as paint quality, roofing materials,
or even major items such as structural material. Usually, these changes are for the
convenience of the contractor, and may result in a credit to the owner.

1.5.3 Changing conditions.

The contractor may encounter a change in conditions due strikes, weather, or subsurfaces
conditions not previously determined.

1.5.4 Changes due to omissions in the contract.

Particularly in contracts where several contractors are working on the same site, each with a
prime contract to the owner and therefore no cross-contractual commitments the individual
contractors may through their interpretation of the limitation of their contract, and certain
work may go uncovered.