ASAP Overview
ASAP Introduction
Content/Tools of the
Legend: ASAP Phases
Unit
Unit
Topic
Topic
SAP AG
SAP AG
R
R
SAP AG
People: Processes:
Solutions Expertise AcceleratedSAP
Products:
The Business Framework
R/3 Product Family
Complementary Software Products R
The TeamSAP program is SAP's contribution to ensuring total lifecycle success in using the R/3
product with:
Reinforced involvement of SAP employees in projects
Coaching across the whole lifecycle; for example, feeding customer concerns into the SAP network,
supporting projects actively, and helping reduce costs
Quality assurance (reviews) for all projects.
TeamSAP works by providing a coordinated network of people, processes and products from SAP and
partners.
ASAP is the TeamSAP solution for the implementation process, with a simple, consistent project plan
linked with the tools, services and support for implementing the R/3 System.
Tools
ASAP Implementation Assistant:
Navigation tool for the Roadmap, questionnaires,
templates, and check lists
Q&A database for documenting requirements
R/3 Business Engineer tools for creating Business
Blueprint (conceptual design) and for configuration
The TeamSAP program is SAP's contribution to ensuring total lifecycle success in using the R/3
product with:
Reinforced involvement of SAP employees in projects
Coaching across the whole lifecycle; for example, feeding customer concerns into the SAP network,
supporting projects actively, and helping reduce costs
Quality assurance (reviews) for all projects.
TeamSAP works by providing a coordinated network of people, processes and products from SAP and
partners.
ASAP is the TeamSAP solution for the implementation process, with a simple, consistent project plan
linked with the tools, services and support for implementing the R/3 System.
Methodology
Methodology
Implementation Assistant R/3 Business Engineer
SAP AG
SAP AG
SAP AG
Contents Search
Home
Home Page
Page Welcome to AcceleratedSAP
What`s New
Roadmap
Implementation Accelerators
Version
SAP AG
SAP AG
Home Page: Branches back to the Roadmap graphic in the right pane.
What's New: Delineates version and release changes.
Roadmap: A set of processes that identifies the steps needed to implement R/3. The five phases of the
AcceleratedSAP Roadmap (represented by a road graphic) are Project Preparation, Business Blueprint,
Realization, Final Preparation and Go Live and Support.
Implementation Accelerators: Alphabetical listing of accelerators found within the Roadmap.
Project Plan: Six or nine month project plans.
Question and Answer Database (Q&A DB): A repository of all questions and corresponding company
responses that are required to define business requirements and to develop the business solutions in
terms of the R/3 Reference Model and the R/3 System. This includes business process, technical,
organizational, and configuration questions and answers that are the source for creating the Business
Blueprint. After answering questions and filling out customer input templates within the Q&A DB, the
Business Blueprint is generated and printed.
Issues Database: Tool used to process and track project issues.
Business Process Procedures: Lists default business processes from the R/3 System.
Knowledge Corner: Task-oriented collection of efficient procedure documentation for use in the R/3
implementation project (examples: authorization concept, data transfer).
Help: Source for ASAP support and updates.
Phase
Continuous
Change
Work Packages Project
Preparation Final
Business Realization Preparation Go Live &
Support
Blueprint
Activities
Tools
SAP AG
The Roadmap, regardless of the method of access, is divided into four types of organizational folders:
Phase - The major milestones of the ASAP Roadmap.
Work package - A group of activities designed to accomplish a major portion of a Roadmap phase.
A work package is assigned to a project team for completion.
Activity - A group of tasks. The results of an activity can produce certain deliverables and can be
accomplished by one or more project team members. Several activities comprise a workpackage.
Task - A specific event to be performed by a project team member.
Tasks contain the important How To instructions needed to complete a task and provide access to the
accelerators:.
How-To - Explanation of how to perform a process, activity, or task.
Accelerator – Documentation, templates, tips and tricks used to accelerate task completion.
SAP AG
The Knowledge Corner contains many publications from SAP's Simplification Group.
Continuous
Change
Project
Preparation Final
Preparation Go-Live &
Business Realization
Support
Blueprint
SAP AG
Continuous
Change
Project
Preparation Final
Preparation Go-Live &
Business Realization
Support
Blueprint
Phase 2 focuses on understanding the business goals of the company and determining the business
requirements needed to support those goals.
During Phase 2, consultants will use the AcceleratedSAP Implementation Assistant, The Question &
Answer Database, and VISIO's Business Modeler to gather requirements.
Organizational
questions
Define business
Customer
organization structure Answers input templates
Business
process
Conduct business questions
process workshops
SAP AG
Specific tasks within the work packages provide direct access to the Q&A db for task completion.
Within the Q&A DB, questionnaires and templates provide the means for task completion as well as
data storage of results and report generation (documentation).
SAP
Reference Create Enterprise
IMG Enterprise IMG Project
Create Project
IMG IMGs Create IMG
Customizing
Project IMG Views
Projects
Views
SAP AG
The Implementation Assistant gives you both guidance and specific directions on the execution of this
process.
The Enterprise IMG is the complete IMG for your company. It includes all components to be
implemented now and in the future. If a certain module, or function within a module, is still under
consideration, include it in the Enterprise IMG so that regeneration is not needed later. Although
regeneration is possible, it can be time consuming because it requires system resources. Be careful if
you regenerate the Enterprise IMG, because all Project IMGs will be affected.
The purpose of the Project IMG is to provide a specific set of configuration activities for each project
phase, so that all SAP application components that go live at the same time are included in one Project
IMG for the customer, even when there are several locations, or multiple project teams. The Project
IMG substantially reduces the number of IMG activities.
All available IMG activities are assigned to one or more components. For instance, if you select
Production Planning (PP), there is a branch Controlling, even if you are not using this component,
because PP needs cost centers for its work centers. Use Project IMGs to do your project planning and
control work.
When you set up your Project IMGs or Release projects, be sure to keep to the standards you defined
in the Project Procedures work package under the Define project documentation task for using status
indicators, for scheduling, and for documentation.
Continuous
Change
Project
Preparation Final
Preparation Go Live &
Business Realization
Support
Blueprint
Baseline Configuration
Final Configuration/Integration Test
Configuration management with IMG
Design, develop and test interfaces, reports, and conversions
Develop integrated and documented solutions
through cycles
Authorization and system administration R
SAP AG
The purpose of Phase 3 is to develop and evolve a future-state model into an integrated and
documented solution that fulfills the customer's business process requirements.
Configuration is done in two work packages:
Baseline configuration (planning, execution, testing, and acceptance)
Final configuration (planning, execution, testing, and acceptance)
Baseline configuration provides the basis for the configuration cycles. The system is refined in the
Final configuration work package.
Customizing
Customizing
project
project
Customizing
Customizing
project
project
SAP AG
Continuous
Change
Project
Preparation Final
Preparation Go Live &
Business Realization
Support
Blueprint
SAP AG
Phase 4 focuses on completing final system testing, training users and cutting over both the data and
the system to a production environment.
Final system testing consists of:
Testing conversion procedures and programs, and interface programs
Conducting volume and stress testing, and final user acceptance testing.
In this phase, you also develop a Go Live plan, which specifically identifies the data conversion
strategy, initial audit procedures and a project team support structure.
Continuous
Change
Project
Preparation Final
Preparation Go Live &
Business Realization
Support
Blueprint
Production support
Verify accuracy of production system
Evaluate business benefits
SAP AG
After Go Live, the customer team focuses on supporting the users. The consultants should be
secondary to this effort.
Each day the business results and system performance should be measured and reviewed.
SAP AG
After Go Live, the customer team focuses on supporting the users. The consultants should be
secondary to this effort.
Each day the business results and system performance should be measured and reviewed.