This document provides a quantity estimate and costing for the ground floor of a construction project. It includes details of 7 items with various sub-items describing the construction components, their quantities in numbers, lengths, breadths, heights and totals. The components include earthwork, concrete work, and reinforced cement concrete work for elements like columns, beams, slabs, lintels and staircases.

Uploaded by

Sudipto Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views

Archana Nayak Estimate

This document provides a quantity estimate and costing for the ground floor of a construction project. It includes details of 7 items with various sub-items describing the construction components, their quantities in numbers, lengths, breadths, heights and totals. The components include earthwork, concrete work, and reinforced cement concrete work for elements like columns, beams, slabs, lintels and staircases.

Uploaded by

Sudipto Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Name : Archana Nayak

At Mauja: Gouripur GL No. : 6 RS Khatian No. : 205 LR Khatian No. : 220


Dag No. : 76 Holding No. :186/6
Gouripur Road, (Jangalpur); Word No - 15
North DumDum Municipality ; P.S : Airport ; District : North 24 Parganas, Kolkata : 700081

Quantity Estimate & Costing Of Ground Floor

Item no Description Of Item Nos. Length(m) Breadth(m) Height(m) Quantity Unit Rate Unit Of Rate Amount
Sub-Head I: Earthwork

1 Surface dressing to an av. Depth of 12 cm. 1 15.88 6.55 _ 104.01 Sqm 200 Sqm 20802.8

2 Earthwork in excavation
a) For column footings - 13 1.5 1.5 1.2 35.10 Cum Cum
b)For Tie Beam ( Consider first as if there is no col.) 1 61 0.35 0.35 7.47 Cum Cum

Deduct the length covered by col. 13 0.3 0.3 0.35 0.41 Cum Cum
Total (b) = 7.06 Cum Cum

Tota (a+b) = 42.16 Cum 2000 Cum 84326

3 Earthwork in filling by fdn trench by loose earth 1/5 th of excavation (approx) 8.43 Cum 3600 Cum 30355.2

4 Sand filling for plinth 1 15.88 6.55 0.48 49.93 Cum Cum
Deduction
For staircase portion 1 2 2.9 0.48 2.78 Cum Cum
For volume of column inside the area 2 0.3 0.3 0.48 0.09 Cum Cum

Total = 47.06 Cum 420 Cum 19763.65

SUB-HEAD II : CONCRETE WORK

5 Cement Concrete M-20


a)For mat concrete of column footing 13 1.5 1.5 0.1 2.93 Cum Cum
b)For Tie beam considering no column 1 61 0.35 0.35 7.47 Cum Cum

Deduct the length covered by col. 13 0.3 0.3 0.35 0.41 Cum Cum
Total (b) = 7.06 Cum Cum

c)For Toe wall 1 2.3 0.6 0.1 0.14 Cum Cum


d)Dwarf wall below staircase wall at innerside 1 2.1 0.6 0.1 0.13 Cum Cum
e)Steps in staricase portion 2 1.08 0.25 0.15 0.08 Cum Cum

Total = 10.33 Cum 3750 Cum 38748.75

6 Cement concrete M-25 for RCC work including


shuttering but excluding reinforcement -

a) Column Footings--
i) Lower portion of col 13 1.5 1.5 0.23 6.73 Cum Cum
ii)Trapezoidal portion 13 0.10/6[(1.5*1.5)+(0.35*0.35)+4*(1.5*1.5+0.35*0.35)] 2.58 Cum Cum
Total 9.31 Cum Cum

b) Columns--
i)Pedestal 13 0.35 0.35 0.23 0.37 Cum Cum
ii)Columns upto Floor level 13 0.3 0.3 3 3.51 Cum Cum
Total 3.88 Cum Cum

c) Beams-- 1 61 0.3 0.3 5.49 Cum Cum


d)Roof
i)Slab (including stair case aread first) 1 15.88 6.55 0.15 15.60 Cum Cum
Deduct the area of staircase portion 1 2.9 2 0.15 0.87 Cum Cum
Total = 14.73 Cum Cum
ii)Extended slab of staircase landing 2 2 1 0.15 0.60 Cum Cum

Total (d) = 15.33 Cum Cum


e) R.C lintel over door and windows
i)For windows ,
Verandah 1 4.3 3.5 0.15 2.26 Cum Cum
W1 4 1.5 0.25 0.15 0.23 Cum Cum
W2 3 1.2 0.25 0.15 0.14 Cum Cum
W3 2 0.9 0.25 0.15 0.07 Cum Cum
Total = 2.69 Cum Cum
ii) For Doors,
D1 2 1.3 0.25 0.15 0.10 Cum Cum
D2 2 1.2 0.25 0.15 0.09 Cum Cum
D3 2 1.1 0.25 0.15 0.08 Cum Cum
Total = 0.27 Cum Cum

Total (e) = 2.96 Cum Cum

f)Sunshades --
i)For windows ,
Verandah 1 4.3 (0.075*0.45)+(0.075*0.45)/2 0.22 Cum Cum
W1 4 1.5 (0.075*0.45)+(0.075*0.45)/2 0.30 Cum Cum
W2 3 1.2 (0.075*0.45)+(0.075*0.45)/2 0.18 Cum Cum
W3 2 0.9 (0.075*0.45)+(0.075*0.45)/2 0.09 Cum Cum

ii) For Doors,


D1 2 1.3 (0.075*0.45)+(0.075*0.45)/2 0.13 Cum Cum

Page 1
D2 2 1.2 (0.075*0.45)+(0.075*0.45)/2 0.12 Cum Cum
D3 2 1.1 (0.075*0.45)+(0.075*0.45)/2 0.11 Cum Cum
Total (f) = 1.15 Cum Cum
g)Staircase --
i) Base of Toe wall 1 2.3 0.25 0.25 0.14 Cum Cum
ii)Waist slab of flights 2 2.7 1.08 0.15 0.87 Cum Cum
iii)Landing 2 2 1 0.1 0.40 Cum Cum
iv)Steps 18 1.08 0.25 0.15 0.73 Cum Cum

Total (g) = 2.15 Cum Cum


Grand Total= 40.26 4200 169085.39
7 2.5 cm thick D.P.C (1:2:4)
For outside and inside wall 1 61 0.2 _ 12.20 Cum Cum
Deduct the door openings
D1 2 1.3 0.25 _ 0.65 Cum Cum
D2 2 1.2 0.25 _ 0.60 Cum Cum
D3 2 1.1 0.25 _ 0.55 Cum Cum

Total = 10.40 Cum 230 Cum 2392

Sub-Head III : BRICKWORK

8 Brick flat soling


i) For Walls 1 61 0.9 _ 54.90 Sqm Sqm
ii)Toe wall 1 2.3 0.6 _ 1.38 Sqm Sqm
iii)Steps 4 1.2 0.7 _ 3.36 Sqm Sqm
Total = 59.64 Sqm 175 Sqm 10437

9 First Class brickwork in cement mortar (1:4) in


foundation and plinth
i)Below the tie beam 1 61 0.35 1.2 25.62 Cum Cum
ii)Toe wall 1 2.3 0.5 0.6 0.69 Cum Cum
iii)Steps under Dining 3 1.08 0.15 0.25 0.12 Cum Cum
iv) Outside Steps 4 1.35 0.15 0.25 0.20 Cum Cum

Total = 26.63 Cum 2800 Cum 74575.2

10 1ST class brickwork in cement mortar (1:6) in


superstructurewalls

i)for 10" thick wall 1 34.25 0.25 3 25.69 Cum Cum


ii)for 5" thick wall 1 20.15 0.125 3 7.56 Cum Cum
iii)for 3" thick wall 1 6.6 0.75 3 14.85 Cum Cum
iv)for 5" stair case wall 1 7.8 0.125 3 2.93 Cum Cum
Total = 51.02 Cum Cum
Deduction for Door & Windows
Door
D1 2 1.3 0.25 2.1 1.37 Cum Cum
D2 2 1.2 0.25 2.1 1.26 Cum Cum
D3 2 1.1 0.25 2.1 1.16 Cum Cum

For windows ,
Verandah 1 4.3 0.25 1.5 1.61 Cum Cum
W1 4 1.5 0.25 1.5 2.25 Cum Cum
W2 3 1.2 0.25 1.5 1.35 Cum Cum
W3 2 0.9 0.25 0.45 0.20 Cum Cum
Total = 9.20 Cum Cum

Grand Total 41.82 Cum 2500 Cum 104559.38

Sub-Head IV : WOODWORK

11 Salwood work for frames


Door
D1 2 5.3 0.1 0.075 0.08 Cum Cum
D2 2 5.3 0.1 0.075 0.08 Cum Cum
D3 2 5.3 0.1 0.075 0.08 Cum Cum

For windows ,
Verandah 1 3.6 0.1 0.075 0.03 Cum Cum
W1 4 3.6 0.1 0.075 0.11 Cum Cum
W2 3 3.6 0.1 0.075 0.08 Cum Cum
W3 2 2 0.1 0.075 0.03 Cum Cum
Total = 0.48 Cum 42552 Cum 20616.44

12 35 mm thick solid flush type single leaf door


Shutters
D1 2 _ 0.88 2.04 3.59 Sqm Sqm
D2 2 _ 0.88 2.04 3.59 Sqm Sqm
D3 2 _ 0.88 2.04 3.59 Sqm Sqm
Total = 10.77 Sqm 1500 Sqm 16156.8
13 35 mm thick glazed window shutters
Verandah 1 _ 1.08 1.08 1.17 Sqm Sqm
W1 4 _ 1.08 1.08 4.67 Sqm Sqm
W2 3 _ 1.08 1.08 3.50 Sqm Sqm
W3 2 _ 0.48 0.58 0.56 Sqm Sqm
Total = 9.89 3500 34608.00

14 Providing anodised aluminium butt hinges

a) 125 X 75 X 4.0 mm size for Main Door, D & D1 6x3 _ _ _ 18.00 Nos 100 Nos 1800
b) 100 X 63 X 3.2 mm size for
D2 4X3 _ _ _ 12.00 Nos Nos

Page 2
Windows 14X2X3 _ _ _ 84.00 Nos Nos
Total 96.00 Nos 75 Nos 7200

15 Providing and fixing tower bolt

300 mm long X 12 mm dia for


Doors 10 X 1 _ _ _ 10.00 Nos Nos
Windows 14 X 1 _ _ _ 14.00 Nos Nos
Total 24.00 125 3000
16 Providing and fixing aldrop (sliding bolt)
250 mm X 18 mm dia bolt for doors 10 X 1 _ _ _ 10.00 Nos 250 Nos 2500

17 Providing anodised grip handle


450 mm X 25 mm dia rod
Doors 10 X 1 _ _ _ 10.00 Nos Nos
Windows 14X1 _ _ _ 14.00 Nos Nos
Total 24.00 500 12000
18 Providing Godrej mortice lock
Bedrooms and drawing room 4X1 _ _ 4.00 Nos 1250 Nos 5000

19 Providing anodised floor door stopper 10 X 1 _ _ _ 10.00 Nos 85 Nos 850

20 Providind 150 mm long catch lock with eyes


For windows 14 X 1 _ _ _ 14.00 Nos 65 Nos 910

Sub-Head V : STEEL AND IRON WORK

21 a) Footing @ 0.6% of conc 16.37 X (0.6/100) X 78.5 7.88 qtl qtl


b) columns @ 1.2% of conc 3.88 X (1.2/100) X 78.5 3.65 qtl qtl
c) Beams @ 1% of conc 13.31 X (1/100) X 78.5 10.45 qtl qtl
d) Roof Slab @ 0.8% of conc 14.73 X (0.8/100) X 78.5 9.25 qtl qtl
e) Lintel @ 0.6% of conc 2.96 X (0.6/100) X 78.5 1.39 qtl qtl
f) Sunshades @ 0.4% of conc 1.15 X (0.4/100) X 78.5 0.36 qtl qtl
g)staircase @ 0.8% of conc 2.75 X (0.8/100) X 78.5 1.73 qtl qtl
Total 34.71 qtl 3500 qtl 121485

22 Collabsible gate 1 1.35 _ 2.1 2.84 2750 7796.25


23 M.S ornamental grill

Verandah 1 4.3 _ 1.05 4.52 Sqm Sqm


W1 4 1.2 _ 1.05 5.04 Sqm Sqm
W2 3 0.9 _ 1.05 2.84 Sqm Sqm
W3 2 0.6 _ 0.55 0.66 Sqm Sqm
Total 15.89 Sqm 120 Sqm 1906.2

Sub-Head VI : PLASTERING

24 12 mm thick cement plaster (1:6) to wall


a) Inside plastering
Bedroom I 1 12.56 _ 3.1 38.94 Sqm Sqm
Bedroom II 1 11.96 _ 3.1 37.08 Sqm Sqm
Kitchen 1 13.94 _ 3.1 43.21 Sqm Sqm
Toilet 1 9.45 _ 3.1 29.30 Sqm Sqm
900 mm wide verandah 1 10.3 _ 3.1 31.93 Sqm Sqm
1100 mm wide verandah 1 8.65 _ 3.1 26.82 Sqm Sqm
Stair 1 12.1 _ 3.1 37.51 Sqm Sqm
Total = 244.78 Sqm Sqm
Deduct the area of openings
Doors,
D1 2 1.3 _ 2.1 5.46 Sqm Sqm
D2 2X2 1.2 _ 2.1 10.08 Sqm Sqm
D3 2 X2 1.1 _ 2.1 9.24 Sqm Sqm
Windows,
Verandah 1 4.3 _ 1.2 5.16 Sqm Sqm
W1 4 1.2 _ 1.2 5.76 Sqm Sqm
W2 3 0.9 _ 1.2 3.24 Sqm Sqm
W3 2 0.6 _ 0.75 0.90 Sqm Sqm

Total inside plastering 204.94 Sqm 85 Sqm 17419.56

b) Outside plastering
From plinth level to first floor level 1 38 _ 3.1 117.80 Sqm Sqm
Deduct the area of openings
Doors,
Main gate 1 1.35 _ 2.1 2.84 Sqm Sqm
Windows,
Verandah 1 4.3 _ 1.2 5.16 Sqm Sqm
W1 4 1.2 _ 1.2 5.76 Sqm Sqm
W2 3 0.9 _ 1.2 3.24 Sqm Sqm
W3 2 0.6 _ 0.75 0.90 Sqm Sqm

Total outside plasterings 99.91 Sqm 120 Sqm 11988.60

25 6 mm thick cement plaster (1:4)


a)Celling
Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm
Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm

Page 3
Stair 1 4.05 2 _ 8.10 Sqm Sqm
Total (a) 50.20 Sqm 80 Sqm 4015.81

b) Staircase --
Under waist slab 2 2.7 1.25 _ 6.75 Sqm Sqm
Undersude of 1st landing 1 2.15 1.075 _ 2.31 Sqm Sqm
Sides of staircase slab 2 2.7 0.15 _ 0.81 Sqm Sqm
Total (b) 9.87 Sqm 80 Sqm 789.70

c) Sunshades
Top and bottom windows
Verandah 1X2 4.3 0.45 _ 3.87 Sqm Sqm
W1 4X2 1.2 0.45 _ 4.32 Sqm Sqm
W2 3X2 0.9 0.45 _ 2.43 Sqm Sqm
W3 2X2 0.6 0.45 _ 1.08 Sqm Sqm
All front edges 1 14 0.075 _ 1.05 Sqm Sqm
All side edges 2*14 0.45 0.15 _ 1.89 Sqm Sqm
Total (c) 14.64 Sqm 80 Sqm 1171.20

26 Neat cement punning about plinth wall 1 38 _ 0.6 22.80 Sqm Sqm
Steps and dining and under stair 6 1.08 0.25 _ 1.62 Sqm Sqm
Total 24.42 Sqm 35 Sqm 854.70

Sub-Head VII : FLOORING

27 20 mm thick terrazzo work for skirting 20 cm


high
Bedroom I 1 12.56 _ _ 12.50 Sqm Sqm
Bedroom II 1 11.96 _ _ 12.35 Sqm Sqm
Kitchen 1 13.94 _ _ 13.65 Sqm Sqm
Toilet 1 9.45 _ _ 14.05 Sqm Sqm
900 mm wide verandah 1 10.3 _ _ 6.71 Sqm Sqm
1100 mm wide verandah 1 8.65 _ _ 7.26 Sqm Sqm
Stair 1 12.1 _ _ 0.90 Sqm Sqm
Deduct door openings
D1 2 1.3 _ _ 1.35 Sqm Sqm
D2 2X2 1.2 _ _ 1.00 Sqm Sqm
D3 2 X2 1.1 _ _ 0.90 Sqm Sqm
Total 66.87 Sqm 415 Sqm 27751.05

28 Supplying, fillting and fixing porcelain coloured


tiles
i)Toilet 1 6.62 _ 2.1 13.90 Sqm Sqm
ii)WC 1 5.26 _ 2.1 11.05 Sqm Sqm
Deduct door openings 2 0.9 _ 2.1 3.78 Sqm Sqm
Total 21.17 Sqm 725 Sqm 15346.80

29 7.5 cm thick terrazo flooring in lime concrete


(1.5:2:7)
Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm
Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm
Stair 1 4.05 2 _ 8.10 Sqm Sqm
Total = 50.20 Sqm 263 Sqm 13201.97

30 25 cm thick terrazo work cast in situ in floor

Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm


Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm
Stair 1 3.325 2.15 _ 7.15 Sqm Sqm
Total = 49.25 Sqm 435 Sqm 21422.16

Sub-Head VIII: PAINTING

31 Painting on timber surface


i)Solid flush doors
D1 2 x 2.40 _ 1.35 2.1 13.61 Sqm Sqm
D2 2 X 2.40 _ 1 2.1 10.08 Sqm Sqm
D3 2 X 2.40 _ 0.9 2.1 9.07 Sqm Sqm
ii) Windows Sqm Sqm
Verandah 1 X 1.60 _ 1.2 1.2 2.31 Sqm Sqm
W1 4 X1.60 _ 1 1.2 7.68 Sqm Sqm
W2 3 X 1.60 _ 0.8 1.2 4.61 Sqm Sqm
W3 2 X 1.60 _ 0.6 0.7 1.35 Sqm Sqm
Total 48.71 Sqm 175 Sqm 8524.25

32 Painting on steel surface


Verandah 1 X 1.60 1.2 _ 1.2 2.31 Sqm Sqm
W1 4 X1.60 1 _ 1.2 7.68 Sqm Sqm
W2 3 X 1.60 0.8 _ 1.2 4.61 Sqm Sqm
W3 2 X 1.60 0.6 _ 0.7 1.34 Sqm Sqm
Total 15.94 150 Sqm 2391.60
Sub-Head IX: White & color washing

33 Decorative cement based paint two coats for


Outside Same as outside plaster 24(b)+25(c) 114.55 Sqm 175 Sqm 20045.38

Page 4
34 Plastic emulsion paint two coats On wall and
cellings Same as outside plaster 24(a)+25(a)+25(b) 265.00 Sqm 200 Sqm 53000.97

Sub-Head X: Misc items

35 10 cm dia A.C pipes 6 4 _ _ 24.00 r.m 120 r.m 2880.00

Total Amount = 991677.80

Add 10 % cost of building for water supply and sanitary works = 99167.78
Add 9% cost of building for electrification works = 89251.00
Total = 1180096.58
Add 5% of Contingency = 59004.83
Add 2.5% for workcharge establishment = 29502.41
Labour charges = 300000
Grand Total For Ground Floor = 1568603.83

Quantity Estimate & Costing OF First Floor

Item no Description Of Item Nos. Length(m) Breadth(m) Height(m) Quantity Unit Rate Unit Of Rate Amount
SUB-HEAD II : CONCRETE WORK

1 Cement concrete M-25 for RCC work including


shuttering but excluding reinforcement -

a) Columns--
i)Columns upto Floor level 14 0.3 0.3 3 3.78 Cum Cum
ii) Columns for stair case room 4 0.3 0.3 2.15 0.77 Cum Cum
Total 4.55 Cum Cum

b) Beams--

i)For 2nd floor 1 61 0.3 0.3 5.49 Cum Cum


i)For stair case room 1 9.8 0.3 0.3 0.88 Cum Cum
Total 6.37 Cum Cum

c)Roof
i)Slab (including stair case aread first) 1 15.88 6.55 0.15 15.60 Cum Cum
Deduct the area of staircase portion 1 2.9 2 0.15 0.87 Cum Cum
Total = 14.73 Cum Cum
ii)Extended slab of staircase landing 1 2.4 1.2 0.15 0.43 Cum Cum
iii)Slab over staircase 1 3.2 2.3 0.15 1.10
Total (c) = 16.27 Cum Cum
d) R.C lintel over door and windows
i)For windows ,
Verandah 1 4.3 3.5 0.15 2.26 Cum Cum
W1 4 1.5 0.25 0.15 0.23 Cum Cum
W2 3 1.2 0.25 0.15 0.14 Cum Cum
W3 2 0.9 0.25 0.15 0.07 Cum Cum
Total = 2.69 Cum Cum
ii) For Doors,
D1 0 1.3 0.25 0.15 0.00 Cum Cum
D2 2 1.2 0.25 0.15 0.09 Cum Cum
D3 2 1.1 0.25 0.15 0.08 Cum Cum
Total = 0.17 Cum Cum

Total (d) = 2.86 Cum Cum

e)Sunshades --
i)For windows ,
Verandah 1 4.3 (0.075*0.45)+(0.075*0.45)/2 0.22 Cum Cum
W1 4 1.5 (0.075*0.45)+(0.075*0.45)/2 0.30 Cum Cum
W2 3 1.2 (0.075*0.45)+(0.075*0.45)/2 0.18 Cum Cum
W3 2 0.9 (0.075*0.45)+(0.075*0.45)/2 0.09 Cum Cum

ii) For Doors,


D1 2 1.3 (0.075*0.45)+(0.075*0.45)/2 0.13 Cum Cum
D2 2 1.2 (0.075*0.45)+(0.075*0.45)/2 0.12 Cum Cum
D3 2 1.1 (0.075*0.45)+(0.075*0.45)/2 0.11 Cum Cum
Total (f) = 1.15 Cum Cum
g)Staircase --
i) Base of Toe wall 1 2.3 0.25 0.25 0.14 Cum Cum
ii)Waist slab of flights 2 2.7 1.08 0.15 0.87 Cum Cum
iii)Landing 2 2 1 0.1 0.40 Cum Cum
iv)Steps 18 1.08 0.25 0.15 0.73 Cum Cum

Total (g) = 2.15 Cum Cum


Grand Total= 48.08 Cum 4200 Cum 201941.25

2 2.5 cm thick D.P.C (1:2:4)


For outside and inside wall 1 61 0.2 _ 12.20 Cum Cum
Deduct the door openings
D1 2 1.3 0.25 _ 0.65 Cum Cum
D2 2 1.2 0.25 _ 0.60 Cum Cum
D3 2 1.1 0.25 _ 0.55 Cum Cum

Page 5
Total = 10.40 Cum 230 Cum 2392

Sub-Head III : BRICKWORK

3 1ST class brickwork in cement mortar (1:6) in


superstructurewalls

i)for 10" thick wall 1 34.25 0.25 3 25.69 Cum Cum


ii)for 5" thick wall 1 20.15 0.125 3 7.56 Cum Cum
iii)for 3" thick wall 1 6.6 0.75 3 14.85 Cum Cum
iv)for 5" stair case wall 1 7.8 0.125 3 2.93 Cum Cum
Total = 51.02 Cum Cum
Deduction for Door & Windows
Door
D1 2 1.3 0.25 2.1 1.37 Cum Cum
D2 2 1.2 0.25 2.1 1.26 Cum Cum
D3 2 1.1 0.25 2.1 1.16 Cum Cum

For windows ,
Verandah 1 4.3 0.25 1.5 1.61 Cum Cum
W1 4 1.5 0.25 1.5 2.25 Cum Cum
W2 3 1.2 0.25 1.5 1.35 Cum Cum
W3 2 0.9 0.25 0.45 0.20 Cum Cum
Total = 9.20 Cum Cum

Grand Total 41.82 Cum 2500 Cum 104559.38

Sub-Head IV : WOODWORK

4 Salwood work for frames


Door
D1 2 5.3 0.1 0.075 0.08 Cum Cum
D2 2 5.3 0.1 0.075 0.08 Cum Cum
D3 2 5.3 0.1 0.075 0.08 Cum Cum

For windows ,
Verandah 1 3.6 0.1 0.075 0.03 Cum Cum
W1 4 3.6 0.1 0.075 0.11 Cum Cum
W2 3 3.6 0.1 0.075 0.08 Cum Cum
W3 2 2 0.1 0.075 0.03 Cum Cum
Total = 0.48 Cum 42552 Cum 20616.44

5 35 mm thick solid flush type single leaf door


Shutters
D1 2 _ 0.88 2.04 3.59 Sqm Sqm
D2 2 _ 0.88 2.04 3.59 Sqm Sqm
D3 2 _ 0.88 2.04 3.59 Sqm Sqm
Total = 10.77 Sqm 1500 Sqm 16156.8
6 35 mm thick glazed window shutters
Verandah 1 _ 1.08 1.08 1.17 Sqm Sqm
W1 4 _ 1.08 1.08 4.67 Sqm Sqm
W2 3 _ 1.08 1.08 3.50 Sqm Sqm
W3 2 _ 0.48 0.58 0.56 Sqm Sqm
Total = 9.89 Sqm 3500 Sqm 34608.00

7 Providing anodised aluminium butt hinges

a) 125 X 75 X 4.0 mm size for Main Door, D & D1 6x3 _ _ _ 18.00 Nos 100 Nos 1800
b) 100 X 63 X 3.2 mm size for
D2 4X3 _ _ _ 12.00 Nos Nos
Windows 14X2X3 _ _ _ 84.00 Nos Nos
Total 96.00 Nos 75 Nos 7200

8 Providing and fixing tower bolt

300 mm long X 12 mm dia for


Doors 10 X 1 _ _ _ 10 Nos Nos
Windows 14 X 1 _ _ _ 14 Nos Nos
Total 24 125 3000
9 Providing and fixing aldrop (sliding bolt)
250 mm X 18 mm dia bolt for doors 10 X 1 _ _ _ 10 Nos 250 Nos 2500

10 Providing anodised grip handle


450 mm X 25 mm dia rod
Doors 10 X 1 _ _ _ 10 Nos Nos
Windows 14X1 _ _ _ 14 Nos Nos
Total 24 500 12000
11 Providing Godrej mortice lock
Bedrooms and drawing room 4X1 _ _ 4 Nos 1250 Nos 5000

12 Providing anodised floor door stopper 10 X 1 _ _ _ 10 Nos 85 Nos 850

13 Providind 150 mm long catch lock with eyes


For windows 14 X 1 _ _ _ 14 Nos 65 Nos 910

Sub-Head V : STEEL AND IRON WORK

14 a) columns @ 1.2% of conc 4.55 X (1.2/100) X 78.5 4.29 qtl qtl


b) Beams @ 1% of conc 6.37 X (1/100) X 78.5 5 qtl qtl
c) Roof Slab @ 0.8% of conc 16.27 X (0.8/100) X 78.5 10.22 qtl qtl
d) Lintel @ 0.6% of conc 2.86 X (0.6/100) X 78.5 1.35 qtl qtl

Page 6
e) Sunshades @ 0.4% of conc 1.15 X (0.4/100) X 78.5 0.36 qtl qtl
f)staircase @ 0.8% of conc 2.15 X (0.8/100) X 78.5 1.35 qtl qtl
Total 22.57 qtl 3500 qtl 78995

15 Collabsible gate 1 1.35 _ 2.1 2.84 2750 7796.25


16 M.S ornamental grill

Verandah 1 4.3 _ 1.05 4.52 Sqm Sqm


W1 4 1.2 _ 1.05 5.04 Sqm Sqm
W2 3 0.9 _ 1.05 2.84 Sqm Sqm
W3 2 0.6 _ 0.55 0.66 Sqm Sqm
Total 15.89 Sqm 120 Sqm 1906.2

Sub-Head VI : PLASTERING

17 12 mm thick cement plaster (1:6) to wall


a) Inside plastering
Bedroom I 1 12.56 _ 3.1 38.94 Sqm Sqm
Bedroom II 1 11.96 _ 3.1 37.08 Sqm Sqm
Kitchen 1 13.94 _ 3.1 43.21 Sqm Sqm
Toilet 1 9.45 _ 3.1 29.30 Sqm Sqm
900 mm wide verandah 1 10.3 _ 3.1 31.93 Sqm Sqm
1100 mm wide verandah 1 8.65 _ 3.1 26.82 Sqm Sqm
Stair 1 12.1 _ 3.1 37.51 Sqm Sqm
Total = 244.78 Sqm Sqm
Deduct the area of openings
Doors,
D1 2 1.3 _ 2.1 5.46 Sqm Sqm
D2 2X2 1.2 _ 2.1 10.08 Sqm Sqm
D3 2 X2 1.1 _ 2.1 9.24 Sqm Sqm
Windows,
Verandah 1 4.3 _ 1.2 5.16 Sqm Sqm
W1 4 1.2 _ 1.2 5.76 Sqm Sqm
W2 3 0.9 _ 1.2 3.24 Sqm Sqm
W3 2 0.6 _ 0.75 0.90 Sqm Sqm

Total inside plastering 204.94 Sqm 85 Sqm 17419.56

b) Outside plastering
From plinth level to first floor level 1 38 _ 3.1 117.80 Sqm Sqm
Deduct the area of openings
Doors,
Main gate 1 1.35 _ 2.1 2.84 Sqm Sqm
Windows,
Verandah 1 4.3 _ 1.2 5.16 Sqm Sqm
W1 4 1.2 _ 1.2 5.76 Sqm Sqm
W2 3 0.9 _ 1.2 3.24 Sqm Sqm
W3 2 0.6 _ 0.75 0.90 Sqm Sqm

Total outside plasterings 99.91 Sqm 120 Sqm 11988.60

18 6 mm thick cement plaster (1:4)


a)Celling
Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm
Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm
Stair 1 4.05 2 _ 8.10 Sqm Sqm
Total (a) 50.20 Sqm 80 Sqm 4015.81

b) Staircase --
Under waist slab 2 2.7 1.25 _ 6.75 Sqm Sqm
Undersude of 1st landing 1 2.15 1.075 _ 2.31 Sqm Sqm
Sides of staircase slab 2 2.7 0.15 _ 0.81 Sqm Sqm
Total (b) 9.87 Sqm 80 Sqm 789.70

c) Sunshades
Top and bottom windows
Verandah 1X2 4.3 0.45 _ 3.87 Sqm Sqm
W1 4X2 1.2 0.45 _ 4.32 Sqm Sqm
W2 3X2 0.9 0.45 _ 2.43 Sqm Sqm
W3 2X2 0.6 0.45 _ 1.08 Sqm Sqm
All front edges 1 14 0.075 _ 1.05 Sqm Sqm
All side edges 2*14 0.45 0.15 _ 1.89 Sqm Sqm
Total (c) 14.64 Sqm 80 Sqm 1171.20

19 Neat cement punning about plinth wall 1 38 _ 0.6 22.80 Sqm Sqm
Steps and dining and under stair 6 1.08 0.25 _ 1.62 Sqm Sqm
Total 24.42 Sqm 35 Sqm 854.70

Sub-Head VII : FLOORING

20 20 mm thick terrazzo work for skirting 20 cm


high
Bedroom I 1 12.56 _ _ 12.50 Sqm Sqm
Bedroom II 1 11.96 _ _ 12.35 Sqm Sqm
Kitchen 1 13.94 _ _ 13.65 Sqm Sqm
Toilet 1 9.45 _ _ 14.05 Sqm Sqm
900 mm wide verandah 1 10.3 _ _ 6.71 Sqm Sqm

Page 7
1100 mm wide verandah 1 8.65 _ _ 7.26 Sqm Sqm
Stair 1 12.1 _ _ 0.90 Sqm Sqm
Deduct door openings
D1 2 1.3 _ _ 1.35 Sqm Sqm
D2 2X2 1.2 _ _ 1.00 Sqm Sqm
D3 2 X2 1.1 _ _ 0.90 Sqm Sqm
Total 66.87 Sqm 415 Sqm 27751.05

21 Supplying, fillting and fixing porcelain coloured


tiles
i)Toilet 1 6.62 _ 2.1 13.90 Sqm Sqm
ii)WC 1 5.26 _ 2.1 11.05 Sqm Sqm
Deduct door openings 2 0.9 _ 2.1 3.78 Sqm Sqm
Total 21.17 Sqm 725 Sqm 15346.80

22 7.5 cm thick terrazo flooring in lime concrete


(1.5:2:7)
Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm
Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm
Stair 1 4.05 2 _ 8.10 Sqm Sqm
Total = 50.20 Sqm 263 Sqm 13201.97

23 25 cm thick terrazo work cast in situ in floor

Bedroom I 1 3.53 2.76 _ 9.74 Sqm Sqm


Bedroom II 1 3.23 2.76 _ 8.91 Sqm Sqm
Kitchen 1 4.05 2.92 _ 11.83 Sqm Sqm
Toilet 1 3.53 1.2 _ 4.24 Sqm Sqm
900 mm wide verandah 1 4.25 0.9 _ 3.83 Sqm Sqm
1100 mm wide verandah 1 3.23 1.1 _ 3.55 Sqm Sqm
Stair 1 3.325 2.15 _ 7.15 Sqm Sqm
Total = 49.25 Sqm 435 Sqm 21422.16

Sub-Head VIII: PAINTING

24 i)Solid flush doors


D1 2 x 2.40 _ 1.35 2.1 13.61 Sqm Sqm
D2 2 X 2.40 _ 1 2.1 10.08 Sqm Sqm
D3 2 X 2.40 _ 0.9 2.1 9.07 Sqm Sqm
ii) Windows Sqm Sqm
Verandah 1 X 1.60 _ 1.2 1.2 2.31 Sqm Sqm
W1 4 X1.60 _ 1 1.2 7.68 Sqm Sqm
W2 3 X 1.60 _ 0.8 1.2 4.61 Sqm Sqm
W3 2 X 1.60 _ 0.6 0.7 1.35 Sqm Sqm
Total 48.71 Sqm 175 Sqm 8524.25

Painting on steel surface


25 Verandah 1 X 1.60 1.2 _ 1.2 2.31 Sqm Sqm
W1 4 X1.60 1 _ 1.2 7.68 Sqm Sqm
W2 3 X 1.60 0.8 _ 1.2 4.61 Sqm Sqm
W3 2 X 1.60 0.6 _ 0.7 1.34 Sqm Sqm
Total 15.94 150 Sqm 2391.60
Sub-Head IX: White & color washing

26 Decorative cement based paint two coats for


Outside Same as outside plaster 17(b)+18(c) 114.55 Sqm 175 Sqm 20045.38

27 Plastic emulsion paint two coats On wall and


cellings Same as outside plaster 17(a)+18(a)+18(b) 304.84 Sqm 200 Sqm 60968.97

Sub-Head X: Misc items

28 10 cm dia A.C pipes 6 4 _ _ 24 r.m 120 r.m 2880.00

Total Amount 711003.06

Add 10 % cost of building for water supply and sanitary works = 71100.31
Add 9% cost of building for electrification works = 63990.28
Total = 846093.65
Add 5% of Contingency = 42304.68
Add 2.5% for workcharge establishment = 21152.34
Labour Charges = 225000
Grand Total For First Floor = 1134550.67

Total Estimated Cost = 2703154.50