comWT Rev01 PDF

This document provides a checklist for pre-commissioning tests of a wave trap installed at a substation. It includes details of the wave trap such as manufacturer, rating, and identification number. The checklist tests that the wave trap is clean, structurally sound, properly installed and labeled. Insulation resistance and contact resistance tests are performed to check electrical integrity. Final documentation review verifies that pre-commissioning checks were approved and necessary documents are available for operation and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

comWT Rev01 PDF

This document provides a checklist for pre-commissioning tests of a wave trap installed at a substation. It includes details of the wave trap such as manufacturer, rating, and identification number. The checklist tests that the wave trap is clean, structurally sound, properly installed and labeled. Insulation resistance and contact resistance tests are performed to check electrical integrity. Final documentation review verifies that pre-commissioning checks were approved and necessary documents are available for operation and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

POWER GRID CORPORATION OF INDIA LIMITED DOC NO.

:MR/CF/WT/09/R-0 DATED: 01/08/07


CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF WAVE TRAP EQUIPMENT IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

I REGION :

II DATE OF III DATE OF


I ERECTION : ENERGISATION :

IV DETAILS OF EQUIPMENT :

LOA NO :

MAKE :

TYPE :

SL NO. : R - PHASE : Y - PHASE : B - PHASE :

YEAR OF
MANUFACTURE :

FEEDER NAME :

V RATING :

VOLTAGE RATING :

mH RATING :

CURRENT RATING : BAND WIDTH :

VI DETAILS : CHECKLIST / TESTING

SL. DESCRIPTION STATUS REMARK


NO YES NO RECORD DEFICIENCIES, IF ANY
1 EQUIPMENT IS FREE FROM DIRT / DUST
FOREIGN MATERIALS ETC.

2 EQUIPMENT IS FREE FROM ALL VISIBLE


DEFECTS ON PHYSICAL INSPECTION

3 SUPPORT STRUCTURES HAS BEEN


PROVIDED WITH DOUBLE EARTH

4 ALL NUTS AND BOLTS ARE TIGHTENED


CORRECTLY AS PER SPECIFIED TORQUE

5 PERMANENT LAVELLING AND


IDENTIFICATION IS DONE

6 LEVELLING AND ALIGNMENT OF STRUCTURE


AND BASE FRAME IS CHECKED

7 ALL INSULATORS & LINE MATCHING UNIT


ARE FREE FROM ANY PHYSICAL DEFECTS

8 TIGHTNESS OF NUTS / BOLTS OF TERMINAL


1 OF 2 WAVE TRAP
POWER GRID CORPORATION OF INDIA LIMITED DOC NO. :MR/CF/WT/09/R-0 DATED: 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF WAVE TRAP EQUIPMENT IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CONNECTORS ARE CHECKED

SL. DESCRIPTION STATUS REMARK


NO YES NO RECORD DEFICIENCIES, IF ANY

9 ERECTION COMPLETION CERTIFICATE ALONG


WITH LIST OF OUTSTANDING ACTIVITIES
REVIEWED

10 CHECK THAT THE TUNING UNIT AND


ARRESTOR ARE PROPERLY TIGHTENED
AND FREE FROM ANY DAMAGE

VII INSULATION RESISTANCE MEASUREMENT :

SL. NO BETWEEN MEGGER PHASE PERMISSIVE


R-PHASE Y-PHASE B-PHASE VALUE
1 UPPER TEMINAL 5000 V 1000 M.OHM
AND EARTH
2 LA OF THE 500 V 1 M.OHM
WAVE TRAP

VIII CONTACT RESISTANCE MEASUREMENT


THE VALUE SHOULD NOT MORE THAN 5 MICRO-OHMS PER CONNECTOR / JOINT

SL. NO ACROSS PHASE


R-PHASE Y-PHASE B-PHASE
1 UPPER TEMINAL MICRO OHMS
2 BOTTOM TEMINAL MICRO OHMS

IX FINAL DOCUMENTATION REVIEW :

A FINAL DOCUMENT OF PRE-COMMISSIONING CHECKS


REVIEWED AND APPROVED YES NO

B DOCUMENTS REGARDING SPARES, EQUIPMENT, O & M


MANNUALS ETC AVAILABLE AT SITE FOR O & M
PURPOSE YES NO

C AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS"


ARE AVAILABLE AT SITE YES NO

SIGNATURE : SIGNATURE : SIGNATURE : SIGNATURE :


NAME : NAME : NAME : NAME :
DESIGNATION : DESIGNATION : DESIGNATION : DESIGNATION :
ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C)( POWERGRID COMM TEAM )