Ch22 (7) Variance Using STD
Ch22 (7) Variance Using STD
Chapter 22(7)
Performance Evaluation Using Variances From Standard Costs
OBJECTIVES
Obj 1 Describe the types of standards and how they are established for businesses.
Obj 2 Explain and illustrate how standards are used in budgeting.
Obj 3 Calculate and interpret direct material and direct labor variances.
Obj 4 Calculate and interpret factory overhead controllable and volume variances.
Obj 5 Journalize the entries for recording standards in the accounts and prepare an income
statement that includes variances from standard.
Obj 6 Explain and provide examples of nonfinancial performance measures.
QUESTION GRID
True / False
No. Objective Difficulty No. Objective Difficulty No. Objective Difficulty
1 22(7)-01 Easy 21 22(7)-01 Easy 41 22(7)-04 Easy
2 22(7)-01 Easy 22 22(7)-01 Easy 42 22(7)-04 Easy
3 22(7)-01 Easy 23 22(7)-01 Moderate 43 22(7)-04 Easy
4 22(7)-01 Easy 24 22(7)-01 Moderate 44 22(7)-04 Easy
5 22(7)-01 Easy 25 22(7)-02 Easy 45 22(7)-04 Easy
6 22(7)-01 Easy 26 22(7)-02 Easy 46 22(7)-04 Easy
7 22(7)-01 Easy 27 22(7)-02 Easy 47 22(7)-04 Easy
8 22(7)-01 Easy 28 22(7)-02 Easy 48 22(7)-04 Moderate
9 22(7)-01 Easy 29 22(7)-03 Moderate 49 22(7)-04 Easy
10 22(7)-01 Easy 30 22(7)-03 Moderate 50 22(7)-05 Easy
11 22(7)-01 Easy 31 22(7)-03 Moderate 51 22(7)-05 Difficult
12 22(7)-01 Easy 32 22(7)-03 Moderate 52 22(7)-05 Easy
13 22(7)-01 Easy 33 22(7)-03 Moderate 53 22(7)-06 Easy
14 22(7)-01 Easy 34 22(7)-03 Moderate 54 22(7)-06 Easy
15 22(7)-01 Easy 35 22(7)-03 Moderate 55 22(7)-06 Easy
16 22(7)-01 Easy 36 22(7)-03 Moderate 56 22(7)-06 Easy
17 22(7)-01 Easy 37 22(7)-03 Moderate 57 22(7)-06 Easy
18 22(7)-01 Easy 38 22(7)-03 Easy 58 22(7)-06 Easy
19 22(7)-01 Easy 39 22(7)-03 Easy
20 22(7)-01 Easy 40 22(7)-04 Easy
242 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
Multiple Choice
No. Objective Difficulty No. Objective Difficulty No. Objective Difficulty
1 22(7)-01 Difficult 28 22(7)-03 Moderate 55 22(7)-04 Moderate
2 22(7)-01 Difficult 29 22(7)-03 Moderate 56 22(7)-04 Moderate
3 22(7)-01 Easy 30 22(7)-03 Moderate 57 22(7)-04 Moderate
4 22(7)-01 Easy 31 22(7)-03 Moderate 58 22(7)-04 Easy
5 22(7)-01 Easy 32 22(7)-03 Moderate 59 22(7)-04 Moderate
6 22(7)-01 Moderate 33 22(7)-03 Moderate 60 22(7)-04 Moderate
7 22(7)-02 Easy 34 22(7)-03 Moderate 61 22(7)-04 Difficult
8 22(7)-02 Easy 35 22(7)-03 Moderate 62 22(7)-04 Easy
9 22(7)-02 Easy 36 22(7)-03 Moderate 63 22(7)-04 Easy
10 22(7)-02 Easy 37 22(7)-03 Difficult 64 22(7)-04 Difficult
11 22(7)-02 Moderate 38 22(7)-03 Difficult 65 22(7)-04 Moderate
12 22(7)-02 Difficult 39 22(7)-03 Moderate 66 22(7)-04 Moderate
13 22(7)-03 Moderate 40 22(7)-03 Moderate 67 22(7)-04 Moderate
14 22(7)-03 Moderate 41 22(7)-03 Easy 68 22(7)-04 Moderate
15 22(7)-03 Moderate 42 22(7)-03 Easy 69 22(7)-04 Moderate
16 22(7)-03 Moderate 43 22(7)-03 Easy 70 22(7)-04 Moderate
17 22(7)-03 Easy 44 22(7)-03 Easy 71 22(7)-04 Moderate
18 22(7)-03 Easy 45 22(7)-03 Easy 72 22(7)-04 Moderate
19 22(7)-03 Moderate 46 22(7)-03 Easy 73 22(7)-04 Moderate
20 22(7)-03 Moderate 47 22(7)-03 Difficult 74 22(7)-04 Moderate
21 22(7)-03 Moderate 48 22(7)-03 Moderate 75 22(7)-05 Easy
22 22(7)-03 Moderate 49 22(7)-03 Moderate 76 22(7)-05 Easy
23 22(7)-03 Moderate 50 22(7)-03 Moderate 77 22(7)-05 Difficult
24 22(7)-03 Moderate 51 22(7)-03 Moderate 78 22(7)-05 Easy
25 22(7)-03 Easy 52 22(7)-03 Easy 79 22(7)-05 Easy
26 22(7)-03 Easy 53 22(7)-04 Moderate 80 22(7)-06 Difficult
27 22(7)-03 Moderate 54 22(7)-04 Moderate
Exercise/Other
No. Objective Difficulty No. Objective Difficulty No. Objective Difficulty
1 22(7)-03 Moderate 5 22(7)-03 Moderate 9 22(7)-05 Difficult
2 22(7)-03 Moderate 6 22(7)-04 Easy 10 22(7)-05 Easy
3 22(7)-03 Moderate 7 22(7)-04 Easy 11 22(7)-06 Difficult
4 22(7)-03 Moderate 8 22(7)-05 Moderate
Problem
No. Objective Difficulty No. Objective Difficulty No. Objective Difficulty
1 22(7)-02 Easy 5 22(7)-04 Difficult 9 22(7)-05 Easy
2 22(7)-03 Moderate 6 22(7)-04 Moderate 10 22(7)-05 Easy
3 22(7)-03 Moderate 7 22(7)-04 Moderate
4 22(7)-03/22(7)-04 Difficult 8 22(7)-05 Moderate
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 243
TRUE/FALSE
1. A variable cost system is an accounting system where standards are set for each manufacturing cost
element.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
2. One reason not to depend solely on historical records to set standards is that there may be
inefficiencies contained in past costs.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
5. Standard costs can be used with both the process cost and job order cost systems.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
6. Cost systems using detailed estimates of each element of manufacturing cost entering into the
finished product are called standard cost systems.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
7. Cost systems using detailed estimates of each element of manufacturing cost entering into the
finished product are called budgeted cost systems.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
8. Normally standard costs should be revised when labor rates change to incorporate new union
contracts.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
9. Standard costs should always be revised when they differ from actual costs.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
10. Financial reporting systems that are guided by the principle of exceptions concept focus attention on
variances from standard costs.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
244 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
12. It is correct to rely exclusively on past cost data when establishing standards.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
13. Ideal standards are developed under conditions that assume no idle time, no machine breakdowns,
and no materials spoilage.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
14. Currently attainable standards do not allow for reasonable production difficulties.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
15. If employees are given bonuses for exceeding normal standards, the standards may be very effective
in motivating employees.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
16. The fact that workers are unable to meet a properly determined direct labor standard is sufficient
cause to change the standard.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
18. Changes in technology, machinery, or production methods may make past cost data irrelevant when
setting standards.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
19. The difference between the standard cost of a product and its actual cost is called a variance.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
20. Standards are performance goals used to evaluate and control operations.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
21. Standards are set for only direct labor and direct materials.
ANS: F DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 245
22. Principle of exceptions allows managers to focus on correcting variances between standard costs and
actual costs.
ANS: T DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
23. Because accountants have financial expertise, they are the only ones that are able to set standard
costs for the production area.
ANS: F DIF: Moderate OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
24. While setting standards, the managers should never allow for spoilage or machine breakdowns in
their calculations.
ANS: F DIF: Moderate OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
25. A budget performance report compares actual results with the budgeted amounts and reports
differences for possible investigation.
ANS: T DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
26. A favorable cost variance occurs when actual cost is less than budgeted cost at actual volumes.
ANS: T DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
27. An unfavorable cost variance occurs when budgeted cost at actual volumes exceeds actual cost.
ANS: F DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
28. Standards are designed to evaluate price and quantity variances separately.
ANS: T DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
29. If the standard to produce a given amount of product is 2,000 units of direct materials at $12 and the
actual was 1,600 units at $13, the direct materials quantity variance was $5,200 favorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
30. If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the
actual was 800 units at $12, the direct materials quantity variance was $2,200 unfavorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
31. If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the
actual was 800 units at $12, the direct materials price variance was $800 unfavorable.
ANS: T DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
246 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
32. If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the
actual was 800 units at $12, the direct materials price variance was $800 favorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
33. If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the
actual was 800 units at $12, the direct materials quantity variance was $1,000 unfavorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
34. If the standard to produce a given amount of product is 600 direct labor hours at $17 and the actual
was 500 hours at $15, the time variance was $1,500 unfavorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
35. If the standard to produce a given amount of product is 600 direct labor hours at $15 and the actual
was 500 hours at $17, the time variance was $1,700 unfavorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
36. If the standard to produce a given amount of product is 600 direct labor hours at $15 and the actual
was 600 hours at $17, the rate variance was $1,200 unfavorable.
ANS: T DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
37. If the standard to produce a given amount of product is 500 direct labor hours at $15 and the actual
was 600 hours at $17, the rate variance was $1,200 favorable.
ANS: F DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
38. Standard costs are determined by multiplying expected price by expected quantity.
ANS: T DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
39. The direct labor time variance measures the efficiency of the direct labor force.
ANS: T DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
40. The variance from standard for factory overhead cost resulting from operating at a level above or
below 100% of normal capacity is termed volume variance.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
41. The variance from standard for factory overhead resulting from incurring a total amount of factory
overhead cost that is greater or less than the amount budgeted for the level of operations achieved is
termed controllable variance.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 247
42. The most effective means of presenting standard factory overhead cost variance data is through a
factory overhead cost budget.
ANS: F DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
43. The most effective means of presenting standard factory overhead cost variance data is through a
factory overhead cost variance report.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
44. Since the controllable variance measures the efficiency of using variable overhead resources, if
budgeted variable overhead exceeds actual results, the variance is favorable.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
45. An unfavorable volume variance may be due to a failure of supervisors to maintain an even flow of
work.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
46. Favorable volume variances are never harmful, since achieving them encourages managers to run the
factory above normal capacity.
ANS: F DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
47. When using a flexible budget, the variable costs will be the same regardless of the production levels.
ANS: F DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
49. Though favorable volume variances are usually good news, if inventory levels are too high,
additional production could be harmful.
ANS: T DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
50. Standard costs are a useful management tool that can be used solely as a statistical device apart from
the ledger or they can be incorporated in the accounts.
ANS: T DIF: Easy OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
51. At the end of the fiscal year, the variances from standard are usually transferred to the finished goods
account.
ANS: F DIF: Difficult OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
248 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
52. Standard cost variances are usually not reported in reports to stockholders.
ANS: T DIF: Easy OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
53. Standards are more widely used for nonmanufacturing expenses than for manufacturing costs.
ANS: F DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
54. Variances from standard rarely conflict with nonfinancial performance measures, such as employee
satisfaction.
ANS: F DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
55. On-time delivery and elapsed time between customer order and product delivery should not enter
into the process of developing cost standards.
ANS: T DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
56. Though it is harder to apply, standards for nonmanufacturing expenses can be used for common and
repetitive operations.
ANS: T DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
57. A company must choice either a standard system or nonfinancial performance measures to evaluate
the performance of a company.
ANS: F DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
58. Employees may work quickly to meet expected production but fail to meet quality standards, in turn,
it may cause expensive rework, rejects, and customer dissatisfaction.
ANS: T DIF: Easy OBJ: 22(7)-06
NAT: AACSB Analytic | IMA-Performance Measurement
MULTIPLE CHOICE
1. Which of the following conditions normally would not indicate that standard costs should be
revised?
a. The engineering department has revised product specifications in responding to customer
suggestions.
b. The company has signed a new union contract which increases the factory wages on average by
$2.00 an hour.
c. Actual costs differed from standard costs for the preceding week.
d. The world price of raw materials increased.
ANS: C DIF: Difficult OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 249
2. Standards that represent levels of operation that can be attained with reasonable effort are called:
a. theoretical standards
b. ideal standards
c. variable standards
d. normal standards
ANS: D DIF: Difficult OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
4. Standard costs are used in companies for a variety of reasons. Which of the following is not one of
the benefits for using standard costs?
a. Used to indicate where changes in technology and machinery need to be made.
b. Used to value inventory
c. Used to plan direct materials, direct labor, and factory manufacturing cost.
d. Used to control costs.
ANS: A DIF: Easy OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
6. Several people play an essential part in setting standards. Which of the following is incorrect as to
setting standards?
a. Accountants expresses judgement in dollars and cents.
b. Engineers identify material, labor, and machine requirements.
c. Human resource managers provide personnel information.
d. Quality managers provide quality measures that will be used to evaluate rejects.
ANS: D DIF: Moderate OBJ: 22(7)-01
NAT: AACSB Analytic | IMA-Performance Measurement
7. Periodic comparisons between planned objectives and actual performance are reported in:
a. zero-base reports
b. budget performance reports
c. master budgets
d. budgets
ANS: B DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
250 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
8. The standard price and quantity of direct materials are separated because:
a. GAAP reporting requires this separation
b. direct materials prices are controlled by the purchasing department, and quantity used is
controlled by the production department
c. standard quantities are more difficult to estimate than standard prices
d. standard prices change more frequently than standard quantities
ANS: B DIF: Easy OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
12. Which of the following is not a reason standard costs are separated in two components?
a. the price and quantity variances need to be identified separately to correct the actual major
differences.
b. identifying variances determines which manager must find a solution to major discrepancies.
c. if a negative variance is over-shadowed by a favorable variance, managers may overlook
potential corrections.
d. variances brings attention to discrepancies in the budget and requires managers to revise budgets
closer to actual.
ANS: D DIF: Difficult OBJ: 22(7)-02
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 251
13. The standard costs and actual costs for direct materials for the manufacture of 2,500 actual units of
product are as follows:
Standard Costs
Direct materials (per completed unit) 1.04 kilograms @$8.75
Actual Costs
Direct materials 2,500 kilograms @ $8
14. The standard costs and actual costs for direct materials for the manufacture of 2,500 actual units of
product are as follows:
Standard Costs
Direct materials 2,500 kilograms @ $8
Actual Costs
Direct materials 2,600 kilograms @ $8.75
17. If the actual quantity of direct materials used in producing a commodity differs from the standard
quantity, the variance is termed:
a. controllable variance
b. price variance
c. quantity variance
d. rate variance
ANS: C DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
18. If the price paid per unit differs from the standard price per unit for direct materials, the variance is
termed:
a. variable variance
b. controllable variance
c. price variance
d. volume variance
ANS: C DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
The Joyner Corporation purchased and used 126,000 board feet of lumber in production, at a total cost of
$1,449,000. Original production had been budgeted for 22,000 units with a standard material quantity of
5.5 board feet per unit and a standard price of $12 per board foot. Actual production was 23,000 units.
25. If the wage rate paid per hour differs from the standard wage rate per hour for direct labor, the
variance is termed:
a. variable variance
b. rate variance
c. quantity variance
d. volume variance
ANS: B DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
26. If the actual direct labor hours spent producing a commodity differ from the standard hours, the
variance is termed:
a. time variance
b. price variance
c. quantity variance
d. rate variance
ANS: A DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
27. The following data relate to direct labor costs for the current period:
28. The following data relate to direct labor costs for the current period:
29. The following data relate to direct labor costs for the current period:
30. The following data relate to direct labor costs for the current period:
31. The standard costs and actual costs for direct labor for the manufacture of 2,500 actual units of
product are as follows:
Standard Costs
Direct labor 7,500 hours @ $12
Actual Costs
Direct labor 7,400 hours @ $11.40
32. The standard costs and actual costs for direct materials, direct labor, and factory overhead for the
manufacture of 2,500 units of product are as follows:
Standard Costs
Direct labor 7,500 hours @ $12
Actual Costs
Direct labor 7,400 hours @ $11.40
The Joyner Corporation had 8,000 actual direct labor hours at an actual rate of $12.20 per hour. Original
production had been budgeted for 1,100 units, but only 1,000 units were actually produced. Labor
standards were 7.5 hours per completed unit at a standard rate of $13 per hour.
Standard Actual
Material Cost Per Yard $2.00 $2.04
Standard Yards per Unit 5 yards 4.75 yards
Units of Production 9,450
41. Calculate the Total Direct Materials cost variance using the above information:
a. $2,929.50 Unfavorable
b. $2,929.50 Favorable
c. $3,780.00 Unfavorable
d. $3,562.50 Favorable
ANS: B DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
42. Calculate the Total Direct Materials Price variance using the above information:
a. $1,795.50 Favorable
b. $378 Favorable
c. $1,795.50 Unfavorable
d. $378 Unfavorable
ANS: C DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
43. Calculate the Total Direct Materials Quantity variance using the above information:
a. $2,929.50 Unfavorable
b. $2,929.50 Favorable
c. $4,725 Unfavorable
d. $4,725 Favorable
ANS: D DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
Standard Actual
Rate $12.00 $12.25
Hours 18,900 17,955
Units of Production 9,450
260 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
44. Calculate the Direct Labor Variance using the above information
a. $6,851.25 Favorable
b. $6,851.25 Unfavorable
c. $2,362.50 Unfavorable
d. $2,362.50 Favorable
ANS: A DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
45. Calculate the Direct Labor Time Variance using the above information
a. $2,362.50 Favorable
b. $2,362,50 Unfavorable
c. $11,340.00 Favorable
d. $11,340.00 Unfavorable
ANS: C DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
46. Calculate the Direct Labor Rate Variance using the above information
a. $4,488.75 Unfavorable
b. $6,851.25 Favorable
c. $4,488.75 Favorable
d. $6,851.25 Unfavorable
ANS: A DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
47. Which of the following is not a reason for a direct materials quantity variance?
a. Malfunctioning equipment
b. Purchasing of inferior raw materials
c. Material requiring rework
d. Spoilage of materials
ANS: C DIF: Difficult OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
48. The formula to compute direct labor rate variance is to calculate the difference between
a. actual costs + (actual hours * standard rate)
b. actual costs - standard cost
c. (actual hours * standard rate) - standard costs
d. actual costs - (actual hours * standard rate)
ANS: D DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
49. The formula to compute direct labor time variance is to calculate the difference between
a. actual costs - standard costs
b. actual costs + standard costs
c. (actual hours * standard rate) - standard costs
d. actual costs - (actual hours * standard rate)
ANS: C DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 261
50. The formula to compute direct materials price variance is to calculate the difference between
a. actual costs - (actual quantity * standard price)
b. actual cost + standard costs
c. actual cost - standard costs
d. (actual quantity * standard price) -standard costs
ANS: A DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
51. The formula to compute direct material quantity variance is to calculate the difference between
a. actual costs - standard costs
b. standard costs - actual costs
c. (actual quantity * standard price) - standard costs
d. actual costs - (standard price * standard costs)
ANS: C DIF: Moderate OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
52. Which of the following would not lend itself to applying direct labor variances?
a. Help desk
b. Administrative assistant
c. Customer service personnel
d. Telemarketer
ANS: B DIF: Easy OBJ: 22(7)-03
NAT: AACSB Analytic | IMA-Performance Measurement
The standard costs and actual costs for factory overhead for the manufacture of 2,500 units of actual
production are as follows:
Standard Costs
Fixed overhead (based on 10,000 hours) 3 hours @ $.80 per hour
Variable overhead 3 hours @ $2 per hour
Actual Costs
54. The amount of the total factory overhead cost variance is:
a. $2,000 favorable
b. $5,000 unfavorable
c. $2,500 unfavorable
d. $0
ANS: B DIF: Moderate OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
The standard factory overhead rate is $10 per direct labor hour ($8 for variable factory overhead and $2
for fixed factory overhead) based on 100% capacity of 30,000 direct labor hours. The standard cost and
the actual cost of factory overhead for the production of 5,000 units during May were as follows:
58. Assuming that the standard fixed overhead rate is based on full capacity, the cost of available but
unused productive capacity is indicated by the:
a. factory overhead cost volume variance
b. direct labor cost time variance
c. direct labor cost rate variance
d. factory overhead cost controllable variance
ANS: A DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 263
The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and
$1.30 for fixed factory overhead) based on 100% capacity of 80,000 machine hours. The standard cost
and the actual cost of factory overhead for the production of 15,000 units during August were as follows:
61. Incurring actual indirect factory wages in excess of budgeted amounts for actual production results in
a:
a. quantity variance
b. controllable variance
c. volume variance
d. rate variance
ANS: B DIF: Difficult OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
63. The unfavorable volume variance may be due to all but the following factors:
a. failure to maintain an even flow of work
b. machine breakdowns
c. unexpected increases in the cost of utilities
d. failure to obtain enough sales orders
ANS: C DIF: Easy OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
264 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
The Joyner Corporation originally budgeted for $360,000 of fixed overhead. Production was budgeted to
be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was
$3 per hour. Actual fixed overhead was $360,000 and actual variable overhead was $170,000. Actual
production was 11,700 units.
Standard Actual
Variable OH Rate $3.35
Fixed OH Rate $1.80
Hours 18,900 17,955
Fixed Overhead $46,000
Factory Overhead $101,450
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 267
71. Calculate the total factory overhead cost variance using the above information:
a. $4,866.75 Unfavorable
b. $4,866.75 Favorable
c. $8,981.75 Favorable
d. $8,981.75 Unfavorable
ANS: D DIF: Moderate OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
72. Calculate the fixed factory overhead volume variance using the above information:
a. $1,701 Favorable
b. $4,866.75 Unfavorable
c. $1,701 Unfavorable
d. $4,866.75 Favorable
ANS: C DIF: Moderate OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
73. Calculate the variable factory overhead controllable variance using the above information:
a. $8,981.75 Favorable
b. $7,280.75 Unfavorable
c. $8,981.75 Unfavorable
d. $7,280.75 Favorable
ANS: B DIF: Moderate OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
74. A negative fixed overhead volume variance can be caused due to the following except:
a. Sales orders at a low level
b. Machine breakdowns
c. Employee inexperience
d. Increase in utility costs
ANS: D DIF: Moderate OBJ: 22(7)-04
NAT: AACSB Analytic | IMA-Performance Measurement
75. At the end of the fiscal year, variances from standard costs are usually transferred to the:
a. direct labor account
b. factory overhead account
c. cost of goods sold account
d. direct materials account
ANS: C DIF: Easy OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
77. If at the end of the fiscal year the variances from standard are significant, the variances should be
transferred to the:
a. work in process account
b. cost of goods sold account
c. finished goods account
d. work in process, cost of goods sold, and finished goods accounts
ANS: D DIF: Difficult OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
78. Assuming that the Morrita Desk Co. purchases 8,000 feet of lumber at $5.50 per foot and the
standard price for direct materials is $5.00, the entry to record the purchase and unfavorable direct
materials price variance is:
a. Direct Materials 40,000
Direct Materials Price Variance 4,000
Accounts Payable 44,000
b. Direct Materials 40,000
Accounts Payable 40,000
c. Direct Materials 44,000
Direct Materials Price Variance 4,000
Accounts Payable 40,000
d. Work in Process 44,000
Direct Materials Price Variance 4,000
Accounts Payable 40,000
ANS: A DIF: Easy OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
79. A company records their inventory purchases at standard cost but also records purchase price
variances. The company purchased 5,000 widgets $8.00, the standard cost for the widgets is $7.90.
Which of the following would be included in the journal entry?
a. $39,500 Debit to Accounts Payable
b. $500 Credit to Direct Materials Price Variance
c. $39,500 Credit to Accounts Payable
d. $500 Debit to Direct Materials Price Variance
ANS: D DIF: Easy OBJ: 22(7)-05
NAT: AACSB Analytic | IMA-Performance Measurement
EXERCISE/OTHER
1. Diamond Company produces a chair that requires 5 yds. of material per unit. The standard price of
one yard of material is $7.50. During the month, 8,500 chairs were manufactured, using 43,700 yards
at a cost of $7.60. Determine the (a) price variance, (b) quantity variance, and (c) cost variance.
ANS:
(a) Price variance - ($7.50 - $7.60) * 43,700 = $4,370 unfavorable
2. Diamond Company produces a chair that requires 5 yds. of material per unit. The standard price of
one yard of material is $7.50. During the month, 8,500 chairs were manufactured, using 43,700 yards
at a cost of $7.30. Determine the (a) price variance, (b) quantity variance, and (c) cost variance.
ANS:
(a) Price variance - ($7.50 - $7.30) * 43,700 = $8,740 favorable
3. Diamond Company produces a chair that requires 5 yds. of material per unit. The standard price of
one yard of material is $7.50. During the month, 8,500 chairs were manufactured, using 40,000 yards
at a cost of $7.60. Determine the (a) price variance, (b) quantity variance, and (c) cost variance.
ANS:
(a) Price variance - ($7.50 - $7.60) * 40,000 = $4,000 unfavorable
4. Koko company produces lamps that require 2.25 standard hours per unit at an hourly rate of $15 per
hour. If 7,700 units required 19,250 hours at an hourly rate of $14.90 per hour, what is the direct
labor (a) rate variance, (b) time variance, and (c) cost variance.
ANS:
(a) Rate variance - ($15.00 - $14.90) * 19,250 = $1,925 favorable
5. Koko company produces lamps that require 2.25 standard hours per unit at an hourly rate of $15 per
hour. If 7,700 units required 17,550 hours at an hourly rate of $15.20 per hour, what is the direct
labor (a) rate variance, (b) time variance, and (c) cost variance.
ANS:
(a) Rate variance - ($15.00- $15.20) * 17,550 = $3,510 unfavorable
(c) Cost variance - ((2.25 * 7,700 * $15) - (17,550 * $15.20) = $6,885 unfavorable
or $3,530 + $3,375 = $6,885 unfavorable
6. Good News Company produced 8,600 units of their product that required 3.25 standard hours per
unit. The standard variable overhead cost per unit is $4.00 per hour. The actual variance factory
overhead was $111,000. Determine the variable factory overhead controllable variance.
ANS:
(8,600 * 3.25 * $4.00) - $111,000 = $800 favorable
7. The Good News Company produced 8,600 units of their product that required 3.25 standard hours
per unit. The standard fixed overhead cost per unit is $1.20 per hour at 29,000 hours, which is 100%
of normal capacity. Determine the fixed factory overhead volume variance.
ANS:
((8,600 * 3.25) - 29,000)* $1.20 = $1,260 unfavorable
8. Diamond Company produces a chair that requires 5 yds. of material per unit. The standard price of
one yard of material is $7.50. During the month, 8,500 chairs were manufactured, using 40,000
yards. Journalize the entry to record the standard direct materials used in production.
ANS:
Work in Process 318,750
Direct Materials Quantity Variance 18,750
Materials 300,000
9. Prepare an income statement for the year ended December 31, 2008, through gross profit for Koko
Company using the following information. Assume Koko Company sold 8,600 units at $125 per
unit. (Note: Normal production is (9,000 units))
Standard: 5 yards per unit @ $6.30 per yard Actual yards used: 43,240 yards @ $6.25 per
yard
Standard: 2.25 hours per unit @ $15 Actual hours worked: 19,100 @ $14.90 per
hour
Standard: Variable overhead $1.05 per unit
Standard: Fixed overhead $211,500 Actual factory overhead $235,500
ANS:
Koko Company
Income Statement Through Gross Profit
For the year ended December 31, 2008
Sales $1,075,000
Cost of goods sold - at standard 772,280
Gross profit - at standard * 302,720
Favorable Unfavorable
Less variances from standard cost
Direct materials price 2,162
Direct materials quantity 1,512
Direct labor rate 1,910
Direct labor time 3,750
Factory overhead controllable 14,970
Factory overhead volume 9,400
18,060
Gross Profit 284,660
272 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
10. If a company records their inventory purchases at standard cost but also records purchase price
variances, what journal entry would be recorded if a purchase of 5,000 widgets were bought at $8.00
having a standard cost of $8.15?
ANS:
Dr Cr
Materials (5,000 * $8.15) 40,750
Direct Materials Price Variance 750
Accounts Payable (5,000 * $8.00) 40,000
11. The following are inputs and outputs to the help desk.
Operator training
Number of calls per day
Maintenance of computer equipment
Number of operators
Number of complaints
PROBLEM
1. Compute the standard cost for one hat, based on the following standards for each hat:
ANS:
Standard Material: 1/2 yard at $4.00 per yard $ 2.00
Standard Labor: 1 hour at $5.75 per hour 5.75
Factory Overhead: 1 hour at $2.90 per hour 2.90
Total standard cost $10.65
2. Standard and actual costs for direct materials for the manufacture of 1,000 units of product were as
follows:
Determine the (a) quantity variance, (b) price variance, and (c) total direct materials cost variance.
ANS:
(a)
Actual quantity 1,550 lbs.
Standard quantity 1,600 lbs.
Quantity variance--favorable (50) lbs.
standard price $ 9.00
$(450)
(b)
Actual price $9.10 per lb.
Standard price 9.00 per lb.
Price variance--unfavorable $ .10 per lb.
actual quantity 1,550
$ 155
(c)
Quantity variance--favorable $(450)
Price variance--unfavorable 155
Total direct materials cost variance--favorable $(295)
3. Standard and actual costs for direct labor for the manufacture of 1,000 units of product were as
follows:
Determine the (a) time variance, (b) rate variance, and (c) total direct labor cost variance.
ANS:
(a)
Actual time 960 hours
Standard time 970 hours
Time variance--favorable (10) hours
standard rate $35.50
$ (355)
(b)
Actual rate $36.00 per hour
Standard rate 35.50 per hour
Rate variance--unfavorable $ .50 per hour
actual time 960
$ 480
(c)
Time variance--favorable $(355)
Rate variance--unfavorable 480
Total direct labor cost variance--unfavorable $ 125
4. The following information is for the standard and actual costs for the Miller Corporation.
Standard Costs:
Budgeted units of production - 16,000 (80% of capacity)
Standard labor hours per unit - 4
Standard labor rate $26 per hour
Standard material per unit - 8 lbs.
Standard material cost - $ 12 per lb.
Budgeted fixed overhead $640,000
Standard variable overhead rate - $15 per labor hour.
Fixed overhead rate is based on budgeted labor hours at 80% capacity.
Actual Cost:
Actual production - 16,500 units
Actual fixed overhead - $640,000
Actual variable overhead - $1,000,000
Actual labor - 65,000 hours, total labor costs $1,700,000
Actual material purchased and used - 130,000 lbs, total material cost $1,600,000
Actual variable overhead - $1,000,000
Determine: (a) the quantity variance, price variance, and total direct materials cost variance; (b) the
time variance, rate variance, and total direct labor cost variance; and (c) the volume variance,
controllable variance, and total factory overhead cost variance.
ANS:
(a)
Quantity variance:
Actual quantity standard price 130,000 12 = $1,560,000
Standard quantity standard price 132,000 12 = 1,584,000
Quantity variance (favorable) 24,000
Price variance:
Actual total price $1,600,000
Actual quantity standard price 130,000 12 = $1,560,000
Price variance (unfavorable) 40,000
(b)
Time variance:
Actual hours standard rate 65,000 26 = $1,690,000
Standard hours standard rate 66,000 26 = 1,716,000
time variance (favorable) 26,000
Rate variance:
Actual labor costs $1,700,000
Actual hours standard rate 65,000 26 = $1,690,000
rate variance (unfavorable) 10,000
276 Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs
(c)
Volume variance:
Actual fixed overhead $640,000
Applied FOH (16,500 4) $10 = 660,000
Volume variance (favorable) 20,000
Controllable variance:
Actual variable overhead $1,000,000
Applied VOH (16,500 4) $15 = 990,000
Controllable variance (unfavorable) 10,000
5. The Finishing Department of Paragon Manufacturing Co. prepared the following factory overhead
cost budget for October of the current year, during which it expected to operate at a 100% capacity
of 10,000 machine hours:
Variable cost:
Indirect factory wages $18,000
Power and light 12,000
Indirect materials 4,000
Total variable cost $34,000
Fixed cost:
Supervisory salaries $12,000
Depreciation of plant and
equipment 8,800
Insurance and property taxes 3,200
Total fixed cost 24,000
Total factory overhead $58,000
During October, the plant was operated for 9,000 machine hours and the factory overhead costs
incurred were as follows: indirect factory wages, $16,400; power and light, $10,000; indirect
materials, $3,000; supervisory salaries, $12,000; depreciation of plant and equipment, $8,800;
insurance and property taxes, $3,200.
Prepare a factory overhead cost variance report for October. (The budgeted amounts for actual
amount produced should be based on 9,000 machine hours.)
Chapter 22(7)/Performance Evaluation Using Variances From Standard Costs 277
ANS:
Variances
Budget Actual Favorable Unfavorable
Variable cost:
Indirect factory wages $16,200 16,400 $ 200
Power and light 10,800 10,000 $ 800
Indirect materials 3,600 3,000 600
Total variable cost $30,600 $29,400
Fixed costs:
Supervisory salaries $12,000 $12,000
Depreciation of plant
and equipment 8,800 8,800
Insurance and
property taxes 3,200 3,200
Total fixed cost $24,000 $24,000
Total factory overhead
cost $54,600 $51,600
Total controllable
variances $1,400 $ 200
Net controllable
variance--favorable $1,200
Volume variance--unfavorable:
Idle hours at the standard
rate for fixed overhead--
1,000 $2.40 2,400
Total factory overhead cost
variance--unfavorable $1,200
6. The following information relates to manufacturing overhead for the Parker Company:
Standards:
Total fixed factory overhead - $450,000
Estimated production - 25,000 units (100% of capacity)
Overhead rates are based on machine hours.
Standard hours allowed per unit produced - 2
Fixed overhead rate - $9 per machine hour
Variable overhead rate - $3.50 per hour.
Actual:
Fixed factory overhead - $450,000
Production 24,000 units.
Variable overhead - $170,000
Required:
(a) Compute the volume variance.
(b) Compute the controllable variance.
(c) Compute the total factory overhead cost variance.
ANS:
(a)
Productive capacity of 25,000 units 50,000 hours
Standard for product produced (24,000 units) 48,000 hours
Productive capacity not used 2,000 hours
Standard fixed factory overhead cost rate $ 9 per hour
Volume variance (unfavorable) $18,000
(b)
Actual Variable overhead incurred $170,000
Budgeted factory overhead for standard
units product produced (applied)
24,000 2 3.5 = 168,000
Controllable variance (unfavorable) $ 2,000
(c)
Volume variance (unfavorable) $18,000
Controllable variance (unfavorable) 2,000
Cost variance (unfavorable) $20,000
7. Using the following information, prepare a factory overhead flexible budget for Koko Company
where 6,000 units is considered normal capacity. Include capacity at 75%, 90%, 100%, and 110%.
Total variable cost is $6.25 per unit and total fixed costs are $38,000. The information is for month
ended August 31, 2008.
ANS:
Koko Company
Factory Overhead Cost Budget
For the Month Ending August 31, 2008
8. Prepare an income statement (through income before income tax) for presentation to management,
using the following data from the records of Brixton Manufacturing Company for November of the
current year:
ANS:
Favorable Unfavorable
Direct materials price $2,400
Direct materials quantity $ 1,200
Direct labor rate 500
Direct labor time 900
Factory overhead controllable 1,500
Factory overhead volume 10,000 7,700
Gross profit $422,300
Operating expenses:
Selling expenses $165,800
Administrative expenses 73,500 239,300
Income before income tax $183,000
9. Bee Company purchased 1,000 pounds of direct materials on account at $2 per pound. The standard
price for direct materials is $1.90 per pound. Prepare the journal entry to record the purchase and the
variance.
ANS:
Materials 1,900
Direct Materials Price Variance 100
Accounts Payable 2,000
10. Bee Company used 500 pounds of direct materials to produce a product with a 520-pound standard
direct materials requirement. The standard materials price is $1.90. The actual materials price is
$2.00. Prepare the journal entry to record the material entering production and the variance.
ANS:
Work in Process 988
Direct Materials Quantity Variance 38
Materials 950