Time Frame For 6s Implementation

The document outlines a time frame for implementing the 6S methodology across three phases from November to January at a company called MAKANA. Phase 1 involves forming a 6S council, identifying zones, and providing training. Phase 2 focuses on sorting, setting in order, shining, and standardizing processes. This includes labeling, organizing storage, cleaning, and creating documentation. Phase 3 involves 6S audits. Phase 4 identifies key performance indicators and benchmarks for continuous improvement.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views

Time Frame For 6s Implementation

The document outlines a time frame for implementing the 6S methodology across three phases from November to January at a company called MAKANA. Phase 1 involves forming a 6S council, identifying zones, and providing training. Phase 2 focuses on sorting, setting in order, shining, and standardizing processes. This includes labeling, organizing storage, cleaning, and creating documentation. Phase 3 involves 6S audits. Phase 4 identifies key performance indicators and benchmarks for continuous improvement.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Time Frame of 6S Implementation

Activity November December January

1 2 3 4 1 2 3 4 1 2 3
Phase 1 (Plan)

Formation of 6S Council

Identify and Set Up 6S Zones

6S Training to all Faculty involve

Launch 6S Program

Phase 2 (Do)

Sort

Identify What is Needed, Amount Needed and When it is Needed

Red Tagging and Evaluation


Set In Order

Label all shop work area (Welding area, Fabrication Area, etc)

Time Frame of 6S Implementation

Activity November December January

Mark reference materials/documents with an oblique line to detect disorder


from a distance.

Put names and numbers (codes) on all equipment and tools.

Store tools beside the machine with which they will be used according to
sequence of work operations.

Organize and store using color code to make it easy to identify materials at a
glance. (ex. Plate and pipe color code)

Label clearly each item and its storage area (Visual Control)

Store similar items together.


Store different items in separate rows.

Floor Paint those walkways, forklift and equipment paths, work areas, as well
as locations for pallets, raw materials, finished goods, shipping, and other static
locations.

Implement reorder signal (Cards) for stocks reorder

Shine

Delegate Cleaning Assignments.

Determine what are to be Cleaned.

Time Frame of 6S Implementation

Activity November December January

Determine the Methods to be Used

Prepare the Cleaning Tools and Materials


Standardized

Provide Maitenance schedules and checklist to all MAKANA tools and


Equipment

Make a Work Instructions

Prepare Work flow for all internal activities within MAKANA

Document Numbering

Quality inspections SOP/ Hold points

Sustain

Create a 6S Board / Information Board

Time Frame of 6S Implementation

Activity November December January


Photos of Before and After 6S

Safety

Safety Monitoring

Phase 3 (Check)

6S Audit

Phase 4 (Act)

Identify KPI and bechmark


y February

4 1 2 3 4
y February
y February
y February