Time Frame For 6s Implementation
Time Frame For 6s Implementation
1 2 3 4 1 2 3 4 1 2 3
Phase 1 (Plan)
Formation of 6S Council
Launch 6S Program
Phase 2 (Do)
Sort
Label all shop work area (Welding area, Fabrication Area, etc)
Store tools beside the machine with which they will be used according to
sequence of work operations.
Organize and store using color code to make it easy to identify materials at a
glance. (ex. Plate and pipe color code)
Label clearly each item and its storage area (Visual Control)
Floor Paint those walkways, forklift and equipment paths, work areas, as well
as locations for pallets, raw materials, finished goods, shipping, and other static
locations.
Shine
Document Numbering
Sustain
Safety
Safety Monitoring
Phase 3 (Check)
6S Audit
Phase 4 (Act)
4 1 2 3 4
y February
y February
y February