M013-JAC-HSE-RPT-00146 Close Out 04.10.2018
M013-JAC-HSE-RPT-00146 Close Out 04.10.2018
INSPECTION OVERVIEW
Reference: M013-JAC-HSE-RPT-00148
Temporary Works, Working at Height, Emergency preparedness and response, lifting operatio
CONTRCT: RNR SITE/LOCTION HIAT1 STATION NATURE OF WORK associated MEP work and welfare.
Accumulated combustible
waste materials and RnR is to Review project
unwanted construction requirement on Fire Combustible waste removed
materials were observed at precuation and immediately from the site and all the
3 Housekeeping the shelter ground level. arrangement for unused material in the site is shifted to
Advised RnR HSEDM to housekeeping and temporary m,aterial storage area to
communicate to the prompts action in keeping avoid the pile of stacking materials in
concern Engineer to the site clean and safe the work location.
deployed workers to from any fire hazard
response accordingly.
Unsafe working condition
was observed, at the east
zone, Scaffold working
platform was loaded with Review project procedure
huge and heavy materials Material stored / stacked in the scaffold
on Scaffolding/work at
Handling/Stor on it and access was removed immediately and concerned
height with material
obstructed with the same
4 age of materials. Civil Engineer stacking/temporary supervisor briefed about the storage of
Materials and other construction storage. As discussed all material to be free the work platfrom
such materials should be from any kind of obstruction.
team was advised and remove on the scaffolding
committed to response
immediately removing all
construction materials on
the scaffold platform.
Issued
by:
ZEESHAN ABDULLAH Position: HS Manager Signature:
11/10/2018
PHOTO
Date: