The inspection report summarizes issues found at the HIAT1 STATION construction site including: 1) Large amounts of dust accumulating on roads exposing workers to health risks. Cable management was also poorly organized in some areas. Combustible waste and unused materials were improperly stored. 2) Scaffolding platforms were overloaded with heavy materials obstructing safe access. Housekeeping was poor with debris found on platforms. 3) Inadequate edge protection on manholes and confined spaces posed fall risks. Not all scaffolding had tags or railings installed properly. 4) Deteriorated scaffolding required replacement of damaged materials before further use. Immediate corrections were recommended address safety issues.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views10 pages

M013-JAC-HSE-RPT-00146 Close Out 04.10.2018

The inspection report summarizes issues found at the HIAT1 STATION construction site including: 1) Large amounts of dust accumulating on roads exposing workers to health risks. Cable management was also poorly organized in some areas. Combustible waste and unused materials were improperly stored. 2) Scaffolding platforms were overloaded with heavy materials obstructing safe access. Housekeeping was poor with debris found on platforms. 3) Inadequate edge protection on manholes and confined spaces posed fall risks. Not all scaffolding had tags or railings installed properly. 4) Deteriorated scaffolding required replacement of damaged materials before further use. Immediate corrections were recommended address safety issues.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

HSE Site Inspection Closeout Report

INSPECTION OVERVIEW
Reference: M013-JAC-HSE-RPT-00148

Temporary Works, Working at Height, Emergency preparedness and response, lifting operatio
CONTRCT: RNR SITE/LOCTION HIAT1 STATION NATURE OF WORK associated MEP work and welfare.

OBSERVATION TOPIC OBSERVATION DETAIL RECOMMENDED ACTION ACTION TAKEN/COMMENTS

Huge amounts of collective


dusts were observed on
the surface level (Road)
towards east zone area, RnR |Should review the
contaminant the cloud of requirement on Collective dust on the surface level road
exposing workers to ill- Construction are suppresed by water and ensured
1 Dust health disease like silicosis Environmental that water suppression is doing 2 times
and asthma. This was Management Plan in in a day to control the contamination of
discussed and advised RnR related to dust and with dust.
HSEDM to ensure adequate control
adequate control means to
reduce the spread of
contaminants dust on site.
Discussed with the RnR
HSEDM to ensure all
cables are properly
Poor cable management Cables are re routed and provided S-
connected and rooted
2 Electrical was observed in few (RnR Should review Cable hooks to avoid the contact wit metals.
locations on the site. management/arrangemen
t as site requirement and
improvement as identify.

Accumulated combustible
waste materials and RnR is to Review project
unwanted construction requirement on Fire Combustible waste removed
materials were observed at precuation and immediately from the site and all the
3 Housekeeping the shelter ground level. arrangement for unused material in the site is shifted to
Advised RnR HSEDM to housekeeping and temporary m,aterial storage area to
communicate to the prompts action in keeping avoid the pile of stacking materials in
concern Engineer to the site clean and safe the work location.
deployed workers to from any fire hazard
response accordingly.
Unsafe working condition
was observed, at the east
zone, Scaffold working
platform was loaded with Review project procedure
huge and heavy materials Material stored / stacked in the scaffold
on Scaffolding/work at
Handling/Stor on it and access was removed immediately and concerned
height with material
obstructed with the same
4 age of materials. Civil Engineer stacking/temporary supervisor briefed about the storage of
Materials and other construction storage. As discussed all material to be free the work platfrom
such materials should be from any kind of obstruction.
team was advised and remove on the scaffolding
committed to response
immediately removing all
construction materials on
the scaffold platform.

Poor housekeeping, debris


and unwanted materials
were all found at platform
level, at area 1&2. RnR RnR Should review
HSEDM was advised to arrangement for All the debri and unwanted materials
5 Housekeeping communicate to the housekeeping and removed from the mentioned areas to
concern construction team removal of waste on a keep the site clean and tidy.
in cleaning and keeping daily basis.
tidy and as well as all
unwanted materials are
removed immediately.
Inadequate edge
protection on
manhole/confirmed space
at platform level was RnR should review project
observed deteriorated and requirement on edge Adequate edge protection and suitavble
Confined
6
Space as well was advised RnR protection and to prevent signage provided on the manhole to
HSEDM to ensure the slips, trips, and falls avoid trips and falls.
manhole/confirmed space hazard.
is properly protected avoid
and prevent trips and falls
hazard.

Few location was observed


with numbers of
scaffoldings without
scaffold inspection tags
and toe boards on it. This
was discussed with RnR All the scaffods are provided with
Review project procedure
HSEDM to ensure all on erecting and dismantle scafftags and scaffolding team briefed
7 Other scaffolds are properly of scaffolding, supervision about the safe erection and dismantling
erect, inspect and paste and monitoring. of scaffold.
the inspection tags on it
prior use. And as well a
clear communication
should be giving to all
workers regarding these
issues in scaffold tags.
Deteriorated scaffoldings
with missing guardrails,
damaged wooden working
platform and scaffold are
without support or ties Review project procedure Guard rails provided on the missing
were observed at pop up for Scaffoldings/work at areas and damaged wooden planks is
Temporary five (5). Ceased the height. RnR Is required
8
Works activities and discussed replacing all damaged removed from the scaffold. Scaffod
this with HSEDM and to scaffolding material inspector is advised to provide tags after
instruct foreman and well immediately thorough inspection only.
the scaffolder to take
immediate action in
rectifying and ensure the
scaffolding is safe to use.

Issued
by:
ZEESHAN ABDULLAH Position: HS Manager Signature:
11/10/2018