OEE DATA

Shift Length (Minutes) : 480


Number of Shift(s) : 1
Short Breaks per Shift (Minutes) : Each (Minutes) : 15 Nb : 2 Total : 30
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 1 Total : 30
Down Time (Minutes) : 47
Ideal Rate : (Pieces/Hour) : 3600 (Pieces/Minute) : 60
Total Pieces Produced per Shift : 19271
Rejected Pieces per Shift : 423

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 420
Operating Time (Minutes) : 373
Good Pieces per Shift : 18848

OEE FACTORS CALCULATION


Availability 88.8% 90.0%
Performance 86.1% 95.0%
Quality 97.8% 99.9%
Overall OEE 74.8% 85.4%

Calculated Factor
120.0% Calculated Factor

100.0% 97.8%
88.8% 86.1%
80.0% 74.8%

60.0%

40.0%

20.0%

0.0%
Availability Performance Quality Overall OEE
Rate

File : 402112310.xls
Form Release : OEE
Copyright © 2004-2008 - Philippe Magnier