1. Contractor shall coordinate closely with SEC to provide and install cables (route, method of
installation including duct bank, no of cables) and 132KV SEC-STATION transformers to the 13.8 kv
switchgear.
2. The contractor shall closely coordinate with SEC for their entire requirement.
3. The main incoming feeders from sec shall have the analogue voltmeter, power factor meter and
analogue frequency meter in addition to microprocessor. All outgoing feeders shall have analogue
ammeter & voltmeter as depicted in the s/line diagram.
6. For Interlocking & sequence of operation contractor shall coordinate closely with SEC.