0% found this document useful (0 votes)
198 views4 pages

3.7 Interim Payment Certificate Format

This document is a monthly dumping log for a general contractor that tracks materials dumped over a 26 day period organized by station of loading, material type, month, and year. It includes sections for the preparer, authorizer, and approver and will be used to record dumping activities across multiple stations over a one month period.

Uploaded by

Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views4 pages

3.7 Interim Payment Certificate Format

This document is a monthly dumping log for a general contractor that tracks materials dumped over a 26 day period organized by station of loading, material type, month, and year. It includes sections for the preparer, authorizer, and approver and will be used to record dumping activities across multiple stations over a one month period.

Uploaded by

Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

_________________________ GENERAL CONTRACTOR

የተጫኑ እና የተራገፉ ጭነቶች መቆጣጠሪያ ቅጽ


Number of Dumps Controlling Format

Material Month Year

Station of Days
Plat no loading Dumping 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Prepared by Authorized by Approved by
_ GENERAL CONTRACTOR

ጭነቶች መቆጣጠሪያ ቅጽ
s Controlling Format

Days
27 28 29 30

You might also like