Visit Report: TUV Control No.: TUV SAP No: 8115236437 (Branch: Report No

1) A pre-inspection meeting was held at Ion Exchange in India to discuss a demineralization package for Farabi Petrochemicals. 2) The meeting reviewed documentation such as drawings, specifications, and quality plans. 3) No non-conformities were found and the stage of the inspection was deemed satisfactory.

Uploaded by

Vinay Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
349 views4 pages

Visit Report: TUV Control No.: TUV SAP No: 8115236437 (Branch: Report No

1) A pre-inspection meeting was held at Ion Exchange in India to discuss a demineralization package for Farabi Petrochemicals. 2) The meeting reviewed documentation such as drawings, specifications, and quality plans. 3) No non-conformities were found and the stage of the inspection was deemed satisfactory.

Uploaded by

Vinay Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

VISIT REPORT

TUV Control No.: TUV SAP No: Branch: Report No:


FNPDC-LTHE-
8115236437 78000-10828-IR 001
(FARABI/NOI/0071 R0)
DEC/PMC Name(if any) ----- DEC Assignment number
(If applicable): ---

Client : M/s. FARABI YANBU Project:


PETROCHEMICALS COMPANY FARABI NORMAL PARAFFIN
M/s.L&T HYDROCARBON AND DERIVATIVES COMPLEX
ENGINEERING
Vendor Name and Sub M/s.ION EXCHANGE IND LTD Client’s PO No.(on vendor) LTHE UAE/78000-10828/SD
vendor name
(if applicable) :
Vendor’s PO No. on sub HMDI/78000-10828/SD DATED 27- Place of Inspection:
JULY-2017 RABALE, NAVI MUMBAI &
vendor(if applicable): WADA
Inspection Call No. & FARABI/NOI/0071 Inspection Date:
Requested Date Dt.11-01-18 17.01.2018 & 18.01.2018

Stage of inspection:

Kick off/Pre – inspection meeting Material Identification Interim stage

 Document review  Final Re-inspection

Sr. No P. O. Item Description PO quantity Quantity offered Remarks


item no.

Demineralization Package including PRE INSPECTION


1 --- Erection and Commissioning 1NOS. 1NOS. MEETING ( QAP
Spares (Tag No. 810-ME-01) STAGE NO.1)

Reference Documents:
Sr. No Document Title Vendor document no. Client Document no. Approval Status
(Specify the details)
1 GA Drawing Ion Exchange Drawing Approval balance

2 QAP G446-0828-2810-ITP-0100-
CODE-2
0046

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance, calibration status, traceability
verified.
Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s) concerned in
full compliance with requirements of its order specification.

Distribution list:  Client Vendor  TUV Branch

Form No. : F / INSP/VR / 11 – R5 Revision date 14/10/2017 Page 1 of 4


VISIT REPORT
3 Specification G446-2999-JSS-0195-0101
067401-0000-1800-001 REV.D
067401-0000-6300-002 REV.KO Client Spec
067401-0000-2310-001 REV.B
067401-0000-6300-004 REV.A

Inspection Activities carried out / Remarks:-


1) As per QAP Stage no.1 Pre Inspection Meeting carried out at M/s. Ion Exchange, Rable & Goble Composite, Wada.

2) Please find attached PIM for details.

Documentation work carried out / Remarks :

1) As per PIM

Details of Instrument / Equipment used in Inspection:


SR INSTRUMENT / EQUIPMENT INSTRUMENT CERTIFICATE NABL NON-NABL*
RANGE VALIDITY UPTO
NO. DETAIL ID No. WITH DATE TICK WHICHEVER IS APPLICABLE

*For NON-NABL: Documents referred / Attached : 1) Master Instrument details with calibration certificate traceable to National/International standard.
2) Mail from the concerned lab, mentioning about their system of working/procedure, which is in line with ISO 17025 Standard.

Conclusion (Accepte d/Accepted with comments/Rejected): Satifactory

Identification of inspected item/equipment: Nil

Areas of concern: As per PIM

Non Conformities raised(if any) (mention NCR no’s): NIL

Attachments (Vendor records, NCR’s, Deviation requests etc.):

Name of inspector : Faiyaz M Date: 17.01.2018 & 18.01.2018

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance, calibration status, traceability
verified.
Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s) concerned in
full compliance with requirements of its order specification.

Distribution list:  Client Vendor  TUV Branch

Form No. : F / INSP/VR / 11 – R5 Revision date 14/10/2017 Page 2 of 4


VISIT REPORT
Signature & TUV stamp:

Mr. Nitin Thorat (Ion Exchange Representative)

Vendor signature & stamp

DETAILS OF THE COMPONENT/PHOTOGRAPH DETAILS OF THE COMPONENT/PHOTOGRAPH

DETAILS OF THE COMPONENT/PHOTOGRAPH DETAILS OF THE COMPONENT/PHOTOGRAPH

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance, calibration status, traceability
verified.
Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s) concerned in
full compliance with requirements of its order specification.

Distribution list:  Client Vendor  TUV Branch

Form No. : F / INSP/VR / 11 – R5 Revision date 14/10/2017 Page 3 of 4


VISIT REPORT

DETAILS OF THE COMPONENT/PHOTOGRAPH DETAILS OF THE COMPONENT/PHOTOGRAPH

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance, calibration status, traceability
verified.
Disclaimer: This issue of inspection report does not relieve the supplier / manufacturer from their responsibility towards the client to supply the item(s) concerned in
full compliance with requirements of its order specification.

Distribution list:  Client Vendor  TUV Branch

Form No. : F / INSP/VR / 11 – R5 Revision date 14/10/2017 Page 4 of 4