Technical Specifications: Construction of Vip/Media Lounge & Command Center
Technical Specifications: Construction of Vip/Media Lounge & Command Center
TECHNICAL
SPECIFICATIONS
Item 100 – Clearing and Grubbing
The accepted quantities, measured as prescribed in Section 100.3, shall be paid for at the Contract
unit price for each of the Pay Items listed below that is included in the Bill of
Quantities, which price and payment shall be full compensation for furnishing all labor, equipment,
tools and incidentals necessary to complete the work prescribed in this Item.
The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract
unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of
Quantities which price and payment shall be full compensation for removing and disposing of
obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item. The price shall also include backfilling, salvage of materials removed,
their custody, preservation, storage on the right-of-way and disposal as provided herein.
Payment will be made under:
Page 1
Item 103 – Structural Excavation
The accepted quantities, measured as prescribed in Section 103.3, shall be paid for at the
contract unit price for each of the particular pay items listed below that is included in the Bill of
Quantities. The payment shall constitute full compensation for the removal and disposal of
excavated materials including all labor, equipment, tools and incidentals necessary to complete
the work prescribed in this Item.
The accepted quantities, measured as prescribed in Section 104.4, shall be paid for at the
Contract unit price for each of the Pay Items listed below that is included in the Bill of
Quantities. The payment shall continue full compensation for placing and compacting all
materials including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.
Payment will be made under:
Fabrication and installation of metal handrail for stairs and ramp and decorative panels for the
lounge.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of metal rails for stairs which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals
necessary to complete the work prescribed in this Item.
The accepted quantities, measured as prescribed in Section 405.5, shall be paid for at the contract unit
price for each of the Pay Item listed below that is included in the Bill of Quantities.
Payment shall constitute full compensation for furnishing, placing and finishing concrete including all
labor, equipment, tools and incidentals necessary to complete the work prescribed in the item.
Payment will be made under:
Basis of Payment
The accepted quantities, measured per cubic meter which price and payment shall be full compensation
for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to
complete the work prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for Soil
Poisoning which price and payment shall be full compensation for application and placing all
materials, including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of plumbing, sanitary and bathroom fixtures and accessories which price and payment
shall be full compensation for furnishing and placing all materials, including all labor, equipment,
tools and incidentals necessary to complete the work prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of metal rails for stairs which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary
to complete the work prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of windows which price and payment shall be full compensation for furnishing and
placing all materials, including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
plastering of wall which price and payment shall be full compensation for furnishing and placing all
materials, including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
painting works for each area and furniture which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary
to complete the work prescribed in this Item.
Refer to DPWH DO No. 230, DPWH Standard Specifications for Item 1046 – Masonry works
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation masonry units which price and payment shall be full compensation for furnishing and
placing all materials, including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.
Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of electrical devices, switches and utilities which price and payment shall be full
compensation for furnishing and placing all materials, including all labor, equipment, tools and
incidentals necessary to complete the work prescribed in this Item.
The contractor shall provide and maintain such offices, stores, workshops latrines, housing and messing
accommodations as are necessary. These should be located in the Contractor’s compound, distinct and
separate from the Engineer’s compound (BCDA Clark PMO). The location dimensions and layout of such
buildings and places shall be subject to the approval of the Engineer. The Contractor shall not be
permitted to erect temporary buildings or structures on the site without the specific permission in
writing of the Engineer including approval of the dimensions of such buildings or structures. Before the
commencement of the period of Warranty, the Contractor shall fence of the Contractor’s store area
from the rest of the Site. By the end of the Period of Warranty, the Contractor shall remove this fence,
all buildings shall be cleared, and the area shall be graded as required by the Engineer.
1. The Contractor shall provide and maintain throughout the duration of the Contract, a medical room
together with all necessary supplies to be sited in the Contractor’s main area. The medical room shall be
waterproof; it could be a building or room designated and used exclusively for the purpose and has a
floor area of at least 15 square meters and a glazed window area of at least two square meters.
2. The Contractor shall employ permanently on the site a fully trained Medical Aide who shall be
engaged solely from medical duties.
3. The location of the medical room and any other arrangements shall be made known to all employees
by posting on prominent locations suitable notices in the Site.
4. The Contractor’s arrangement to comply with this Section shall be subject to the approval of the
Engineer and to the approval of any qualified Medical Officer designated by the Government to
supervise medical arrangements on the Site.