Monthly Progress Report For Road Safety Proforma
Monthly Progress Report For Road Safety Proforma
Status of Road as on
Name of Road
Sl. as per Works Length of Date RSA at O&M stage if not No. Any other
Chainag Road / (whether at design conducted earlier Reqd
No. Department e Stretch in stage / under issues not
Website with km construction / taken care of
no. e.g. SH_
completed/ O&M) Construction Pre COD Total No No. for which No No for which No. No No.
Design stage audit Stage audit audit Traffic Calming RSA findings Installed removed
for length ≥ 5 km
Measures taken attended
1 2 3 4 5 6(a) 6(b) 6(c) 6(d) 7(a) 7(b) 8(a) 8(b) 9(a) 9(b) 10(a) 10(b) 11
Category of Road : SH