Surya Constructions Section: 6.0 Resource Management Quality System Manual
Surya Constructions Section: 6.0 Resource Management Quality System Manual
6.1.4 Managing Partner /Director Projects makes Project Plans for the
current year and future during the beginning of each accounting
year based on the trends in the Construction Field .
6.1.5 The Management ensures that all the Technical and Mechanical
requirements needed for ensuring the clients requirements are
provided in time.
6.2.1 General
6.2.2.1 Based on the nature of work the competence of various personnel has
been documented as Recruitment reference.
Issue : A
Prepared by : Revision : 0 Approved by :
Date :20.09.17
Reviewed by : Page No: 1 of 3 Issued by :
© SURYA CONSTRUCTIONS
`
SURYA SECTION : 6.0 QUALITY
CONSTRUCTIONS RESOURCE MANAGEMENT SYSTEM
MANUAL
6.2.2.5 The personnel are made aware about the relevance and
importance of their activities and their contribution towards the
achievement of Quality Objectives through awareness training.
6.3 INFRASTRUCTURE
6.3.1 The important requirements for any business activity are Land,
Labour, Capital and Organization.
Issue : A
Prepared by : Revision : 0 Approved by :
Date :20.09.17
Reviewed by : Page No: 2 of 3 Issued by :
© SURYA CONSTRUCTIONS
`
SURYA SECTION : 6.0 QUALITY
CONSTRUCTIONS RESOURCE MANAGEMENT SYSTEM
MANUAL
6.4.2 The company has been equipped with Automatic UPS to avoid
the Power interruptions, causing uncomfortable functions in
workstations.
6.4.4 Adequate Fire extinguishers, Fire buckets, Hose reels and fire
hydrants have been provided for material safety in appropriate
places.
Issue : A
Prepared by : Revision : 0 Approved by :
© SURYA CONSTRUCTIONS
`
SURYA SECTION : 6.0 QUALITY
CONSTRUCTIONS RESOURCE MANAGEMENT SYSTEM
MANUAL
Date :20.09.17
Reviewed by : Page No: 3 of 3 Issued by :
© SURYA CONSTRUCTIONS