CMPM Edited Activities

The document outlines a construction project schedule with 29 activities labeled A through M'. The schedule includes activities such as site clearing, material delivery, formwork and rebar fabrication and installation, excavation, concrete work, plumbing and electrical installation, and finishing work. It provides the start and end dates to show the duration and dependencies of each task.

Uploaded by

Dominic Flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views16 pages

CMPM Edited Activities

The document outlines a construction project schedule with 29 activities labeled A through M'. The schedule includes activities such as site clearing, material delivery, formwork and rebar fabrication and installation, excavation, concrete work, plumbing and electrical installation, and finishing work. It provides the start and end dates to show the duration and dependencies of each task.

Uploaded by

Dominic Flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

DESIGNATION NODES ACTIVITIES

A 1-2 Site Clearing and Grubbing


B 1-3 Delivery of Materials
C 1-4 Layout and Batterboard
D 3-6 Fabrication of Rebars for Column, Walls, CF, WF and Beams
E 4-6 Fabrication of Formworks for Column, Beams
F 2-6 Excavation for Column Footing and Wall Footing
G 4-5 Excavation of Septic Tank and Catch Basin
H 5-6 Laying of CHB for Septic Tank
I 6-7 Installation of Rebars for Column, CF and WF
J 7-8 Concreting of Column Footing and Wall Footing
K 8-9 Installatin of Formworks for Column (Ground Floor)
L 9-10 Concreting of Column (Ground Floor)
M 10-12 Installation of Rebars for Beam (2nd Floor)
N 10-11 Installation of Formworks for Beam and Slab (2nd Floor)
O 11-12 Installation of fabricated Rebars for Slab (2nd Floor)
P 11-13 Installation of Electrical Conduits
Q 12-13 Roughing in plumbing and water pipe connections (2nd Foor)
R 13-14 Concreting of Beam and Slab (2nd Floor - Monolitically)
S 14-16 Stripping of Formworks and Scaffolds for Beam and Slab (2nd Floor)
T 14-15 Installation of Formworks for Column (2nd Floor)
U 15-16 Concreting of Column (2nd Floor)
V 16-18 Installation of Rebars for Roof Beam
W 16-17 Installation of Formworks for Roof Beam
X 17-18 Concreting of Roof Beam
Y 18-19 Laying of CHB (Ground Floor and 2nd Floor)
Z 18-21 Backfilling
A' 18-20 Earthfilling (Ground Floor)
B' 20-21 Installation of Rebars for Slab (Ground Floor)
C' 21-22 Roughing in plumbing and water pipe connections (Ground Foor)
D' 22-23 Concreting of Slab (Ground Floor)
E' 22-24 Fabrication of Trusses
F' 23-24 Installation of Scaffoldings
G' 24-25 Installation of Trusses and other Roofing Works
H' 21-25 Plastering of CHB (Ground Floor and 2nd Floor)
I' 25-26 Installation of fabricated Doors and Windows
J' 25-27 Installation of Electrical Works and Fixtures
K' 26-27 Painting Works
L' 27-28 Tile Works
M' 28-29 Clearing, Inspection and Turnover
DURATION START FINISH FLOAT CRITICAL
EARLY LATE EARLY LATE TOTAL FREE ACTIVITY
2 0 0 2 2 0 0 CRITICAL
3 0 3 3 6 3 0 NOT CRITICAL
3 0 4 3 7 4 0 NOT CRITICAL
4 3 6 7 10 3 3 NOT CRITICAL
3 3 7 6 10 4 4 NOT CRITICAL
8 2 2 10 10 0 0 CRITICAL
4 3 3 7 7 0 0 CRITICAL
3 7 7 10 10 0 0 CRITICAL
4 10 10 14 14 0 0 CRITICAL
5 14 14 19 19 0 0 CRITICAL
3 19 19 22 22 0 0 CRITICAL
5 22 22 27 27 0 0 CRITICAL
3 27 29 30 32 2 2 NOT CRITICAL
2 27 27 29 29 0 0 CRITICAL
3 29 29 32 32 0 0 CRITICAL
2 29 32 31 34 3 3 NOT CRITICAL
2 32 32 34 34 0 0 CRITICAL
4 34 34 38 38 0 0 CRITICAL
1 38 45 39 46 7 7 NOT CRITICAL
3 38 38 41 41 0 0 CRITICAL
5 41 41 46 46 0 0 CRITICAL
3 46 49 49 52 3 3 NOT CRITICAL
2 46 46 48 48 0 0 CRITICAL
4 48 48 52 52 0 0 CRITICAL
20 52 52 72 72 0 0 CRITICAL
2 52 55 54 57 3 3 NOT CRITICAL
3 52 52 55 55 0 0 CRITICAL
2 55 55 57 57 0 0 CRITICAL
2 57 57 59 59 0 0 CRITICAL
4 59 60 63 64 1 0 NOT CRITICAL
7 59 59 66 66 0 0 CRITICAL
2 63 64 65 66 1 1 NOT CRITICAL
10 66 66 76 76 0 0 CRITICAL
5 57 71 62 76 14 14 NOT CRITICAL
4 76 76 80 80 0 0 CRITICAL
3 76 83 79 86 7 7 NOT CRITICAL
6 80 80 86 86 0 0 CRITICAL
5 86 86 91 91 0 0 CRITICAL
2 91 91 93 93 0 0 CRITICAL
J
2 7 8

A F
I K

B D
1 3 6 9 12

M
E L
H
C

4 5 10 11
G N

TT
ES ACT. EF
LS DUR. LF
FF

EF = Early Start + Duration


ES = Greater Value of Preceeding Activity

LF = Smaller Value
LS = Late Finish - Duration

TF = Late Finish - Early Finish


FF =
1
1
T
14 15 19 20

A' H'
U Y B'
R
S
Q V Z
12 13 16 18 21

P C'
O X
W E'

11 17 22
D'

0 A 2 0 F 2
2 2 2

0 B 2 0 D 2
3
2 2
3

0 E 2
2

0 C 2
4
2

0 G 2
2
I'
25 26

H' J' K'


G'

L' M'
24 27 28 29

F'
E'

23

0 J 2
7 2 8

0 I 2 0 K 2
2 2

6 9
6 9

0 H 2 0 L 2
2 2

5 10
12
12

0 O 2
2

0 N 2
2 11
DESIGNATION NODES ACTIVITIES

A Site Clearing and Grubbing


B Delivery of Materials
C Layout and Batterboard
D Fabrication of Rebars for Column, Walls, CF, WF and Beams
E Fabrication of Formworks for Column, Beams
F Excavation for Column Footing and Wall Footing
G Excavation of Septic Tank and Catch Basin
H Laying of CHB for Septic Tank
I Installation of Rebars for Column, CF and WF
J Concreting of Column Footing and Wall Footing
K Installatin of Formworks for Column (Ground Floor)
L Concreting of Column (Ground Floor)
M Installation of Rebars for Beam (2nd Floor)
N Installation of Formworks for Beam and Slab (2nd Floor)
O Installation of fabricated Rebars for Slab (2nd Floor)
P Installation of Electrical Conduits
Q Roughing in plumbing and water pipe connections (2nd Foor)
R Concreting of Beam and Slab (2nd Floor - Monolitically)
S Stripping of Formworks and Scaffolds for Beam and Slab (2nd Floor)
T Installation of Formworks for Column (2nd Floor)
U Concreting of Column (2nd Floor)
V Installation of Rebars for Roof Beam
W Installation of Formworks for Roof Beam
X Concreting of Roof Beam
Y Laying of CHB (Ground Floor and 2nd Floor)
Z Backfilling
A' Earthfilling (Ground Floor)
B' Installation of Rebars for Slab (Ground Floor)
C' Roughing in plumbing and water pipe connections (Ground Foor)
D' Concreting of Slab (Ground Floor)
E' Fabrication of Trusses
F' Installation of Scaffoldings
G' Installation of Trusses and other Roofing Works
H' Plastering of CHB (Ground Floor and 2nd Floor)
I' Installation of fabricated Doors and Windows
J' Installation of Electrical Works and Fixtures
K' Painting Works
L' Tile Works
M' Clearing, Inspection and Turnover
DURATION PREDECESOR START FINISH FLOAT
EARLY LATE EARLY LATE TOTAL FREE
2 0 0 2 2 0 0
3 A 2 2 5 5 0 0
3 B 5 5 8 8 0 0
4 B 5 10 9 14 5 5
3 B 5 20 8 23 15 0
6 C 8 8 14 14 0 0
4 C 8 8 12 12 0 0
3 G 12 12 15 15 0 0
4 D,F 14 14 18 18 0 0
5 I 18 18 23 23 0 0
3 E,J 23 23 26 26 0 0
5 K 26 26 31 31 0 0
3 L 31 31 34 34 0 0
2 E,M 34 34 36 36 0 0
3 N 36 36 39 39 0 0
2 O 39 39 41 41 0 0
2 O 39 39 41 41 0 0
4 P,Q 41 41 45 45 0 0
1 R 45 45 46 46 0 0
3 E,S 46 46 49 49 0 0
5 T 49 49 54 54 0 0
3 U 54 54 57 57 0 0
2 E,V 57 57 59 59 0 0
4 W 59 59 63 63 0 0
15 X 63 63 78 78 0 0
2 Y 78 78 80 80 0 0
3 Y 78 78 81 81 0 0
2 A' 81 81 83 83 0 0
2 A' 81 81 83 83 0 0
4 B',C' 83 83 87 87 0 0
7 D' 87 87 94 94 0 0
2 D' 87 92 89 94 5 5
10 E',F' 94 94 104 104 0 0
5 G' 104 104 109 109 0 0
4 H' 109 109 113 113 0 0
3 H' 109 110 112 113 1 1
6 I',J' 113 113 119 119 0 0
5 K' 119 119 124 124 0 0
2 L' 124 124 126 126 0 0
CRITICAL
ACTIVITY
CRITICAL
CRITICAL
CRITICAL
NOT CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL G
CRITICAL
CRITICAL
CRITICAL
CRITICAL C F
CRITICAL
CRITICAL
CRITICAL
A B D I
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
NOT CRITICAL
CRITICAL
CRITICAL
CRITICAL
NOT CRITICAL
CRITICAL
CRITICAL
CRITICAL
H

L M P

O R S

J K N Q

T U

E
B
E'
'

A D
G'
' '
C F'
U V Y '

Z
W X
I'

H K M
L'
' ' '

J'