A. 11.72 kg C. 49.36 kg
Project B. 31.42 kg D. 16.78 kg
Problem 2 Which of the following most nearly gives Problem 7 Which of the following most nearly gives
the quantity of concrete? the cost of labor per cubic meter of riprap?
Problem 3 Which of the following most nearly gives Problem 8 Which of the following most nearly gives
the quantity of formworks? the cost of materials per cubic meter of riprap?
(CE Board Nov 2003) A bill of quantities is to be Problem 9 Which of the following most nearly gives
prepared for the square isolated reinforced concrete the total unit cost per cubic meter of riprap?
column and footing as shown. The foundation is A. P1,508.06/m3 C.
strong enough that formwork is not required for the P1,520.84/m3
footing. The swell factor for the backfill is 120%. Unit B. P1,831.94/m3 D.
weight of bars is 7850 kg/m3. P1,368.06/m3
Problem 4 Which of the following most nearly gives Concrete Mix
the weight per unit length of 16-mm diameter bars?
(CE Board Jan 2008) A concrete mix has a ratio of
A. 2.4693 kg/m C. 0.6173 kg/m 1:2:4 by mass. The properties of the materials to be
B. 1.5803 kg/m D. 0.8889 kg/m used are tabulated below.
Problem 5 Which of the following most nearly gives Specific
the length of 16-mm diameter bars? Materials
Gravity
Cement 3.33
A. 18.98 m C. 19.88 m
Sand 2.64
B. 18.88 m D. 18.99 m
Gravel 2.67