SPC Simplified
SPC Simplified
Processes that are "out of control" need to be When Cp, the process capability index, and Cpk,
SPC
stabilized before they can be improved using the the centering index, are over 1.0, the process is
problem-solving process. Special causes require
immediate cause-effect analysis to eliminate
variation.
capable, but most manufacturers require
Cp>1.33.
Capable
Simplified
Lower Upper
The following diagram will help you evaluate stability Spec
Limit
Spec
Limit Cp>1 How to Plug the Leaks
in any control chart. Unstable conditions can be any
of the following: Cpk>1 In Your Cash Flow!
Waste Rework Cpk
1.0
Sigma
3 SPC
3σ
Target 1.33
1.66
4
5 SIMPLIFIED
2σ 2.0 6
Weight
Sustain 4 Check the process for stability and XbarS diameters, lengths
Control capability Sub groups tensile strength
resistance
Honor 5 Review, recognize, and refocus Variable
Manufacturing
Data
To learn more about SPC, consider our one To automate these charts, try the QI Macros QI Macros Control Chart Wizard
hour training video: www.qimacros.com/ for Excel. Download a FREE 30 day trial at The QI Macros can analyze your data and
spc-simplified-training-video.html www.qimacros.com/freestuff.html. select and run the right control chart for you.