Bill of Quantities: Project: Design of Flood Wall Along Morong River For Tradeoff 1 (Sheet Pile)
Bill of Quantities: Project: Design of Flood Wall Along Morong River For Tradeoff 1 (Sheet Pile)
BILL OF QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT TOTAL UNIT COST TOTAL COST
I. DESIGN PHASE:
Preliminary Survey/Studies 1.00 lot 187,590.00 187,590.00
TOTAL FOR DESIGN PHASE 187,590.00
BILL OF QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT TOTAL UNIT COST TOTAL COST
I. DESIGN PHASE:
Preliminary Survey/Studies 1.00 lot 187,590.00 187,590.00
TOTAL FOR DESIGN PHASE 187,590.00
BILL OF QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT TOTAL UNIT COST TOTAL COST
I. DESIGN PHASE:
Preliminary Survey/Studies 1.00 lot 187,590.00 187,590.00
TOTAL FOR DESIGN PHASE 187,590.00