ECM Calcs
ECM Calcs
1. Developer/Owner
2. Contractor
SHIMIZU CORPORATION
8 Kallang Avenue
#05-01, Aperia Tower 1
Singapore 339509
Tel: 6220 0406 Fax: 6224 9890
Email: [email protected]
3. Architect/Qualified Person
XCUBE ARCHITECTS
8 Burn Road
#17-07, Trivex
Singapore 369977
Tel: 6634 2810
4. ECM Consultant
PROJECT:
PROPOSED ERECTION OF 6 STOREY SINGLE USER DATA CENTRE
WITH ANCILLARY FACILITIES ON LOT 0869C PT MK06 AT SUNVIEW
DRIVE SINGAPORE (BOON LAY PLANNING AREA)
JOB DESCRIPTION
STAGE 1 - INSTALLATION OF ULTIMATE LOAD TEST PILE AT PRE-
CONSTRUCTION STAGE
DESIGN CALCULATION
EARTH CONTROL MEASURES (ECM)
Date : 15-Mar-2017
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE 2
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17
A - ECM WRITE-UP
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE 3
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17
This write-up proposes the erosion and sediment control as well as construction water control for
the installation of ultimate load test pile at pre-construction stage for proposed construction of 6-
storey single user data centre on lot 0869C PT MK06 at Sunview Drive.
The main objective of earth control measures is to contain muddy water and soiled construction
water within the construction area. This unclean / silty water is stored in an appropriate storage
area and then treated with ECM water treatment system to achieve the sediment yield of
discharge water less than 50ppm.
2 - Project Description
The project site is located at on Lot 0869C PT MK06 at Sunview Drive and the total site
occupied area (site area within boundary line of 9000 sq.m plus temporary site facilities area out
boundary line of 5950 sq.m) is about 14950 sq.m.
The scope of Stage 1 - ECM works is for installation of ultimate load test pile at pre-construction
stagefor proposed construction of 6-Storey Single User Data Centre.
The estimate duration for installation of ultimate load test pile is 22/03/2017 to 31/05/2017.
1 - Design Statement
This calculation presents the earth control measures (ECM) for installation of ultimate load test
pile at pre-construction stage.
The objective is to provide an effective earth control measure system to meet the PUB's
requirement by keeping sediment yield of discharge water to be less than 50ppm.
Soil lost due to excavation works is calculated based on the following soil information &
formulae.
To calculate LS factor
m S
LS = (λ/22.13) x (0.065 + 0.046S + 0.0065S )
λ = slope length (m)
S = slope in percent
m = 0.2 for S<1.0%
0.3 for 1%<S<3%
0.4 for 3%<S<5%
0.5 for 5%<S<12%
0.6 for S>12%
To calculate CP factor
Construction site (bareland) = 1.000
Lean concrete = 0.001
Asphalt pave surface = 0.003
Well compacted hardcore = 0.005
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE 8
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17
Stage 1: Proposed concept of ECM for Installation of Ultimate Load Test Pile
To calculate LS factor
λ = 5.00 m
S = 0.50 %
m = 0.20
m S
LS = (λ/22.13) x (0.065 + 0.046S + 0.0065S ) = 0.05
Provide silt fence around the perimeter of isolated test pile area and cover the exposed area
with the erosion control blanket if possible.
Provide treatment system to treat the discharged water to achieve sediment yield of less than
50mg/L.
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE 9
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17
7 - Appendix
Owner/Developer:
Signature:
Date:
Note:
Earth Control Measures is for the treatment of
silty water due to rain water. Construction
wastewater (slurry, bentonite..etc) due to
tunnelling, boring..etc shall be separately treated.
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE A2
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17
Model: FP‐WW‐05, Capacity: 5m3/hr
For more information, please contact:
F P W a t e r h u b P t e L t d
No 1 Charlton Lane #01‐01 Charlton Corner Singapore 539631
TEL: (65) 6858 1310 FAX: (65) 6858 1324 / 6281 7995 HP: (65) 9623 2813 EMAIL: [email protected]
Project Job Ref.
First Engineers PROPOSED ERECTION OF 6 STOREY SINGLE USER 17-307-01
Consultants Pte Ltd DATA CENTRE WITH ANCILLARY FACILITIES ON Sheet no./rev.
81 Ubi Ave 4 #09-16 UB.One LOT 0869C PT MK06 AT SUNVIEW DRIVE A5
Singapore 408830 Calc. by Date Chk'd. by Date App'd. by Date
tnm 15-Mar-17 nsp 15-Mar-17 nsp 15-Mar-17