0% found this document useful (0 votes)
40 views

Annai Constructions: Ist Floor DTL Estimate Value

The document provides an estimate for construction of the first floor of a building totaling 1,009.82 square feet. It lists materials and labor costs for items like bricks, cement, metal, sand, iron, woodwork, electrical, plumbing, painting, tiles, and labor. The total estimated cost is 14,60,000 Indian rupees. It also outlines a 4 step process for the construction with costs at each step totaling the final estimated grand total.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Annai Constructions: Ist Floor DTL Estimate Value

The document provides an estimate for construction of the first floor of a building totaling 1,009.82 square feet. It lists materials and labor costs for items like bricks, cement, metal, sand, iron, woodwork, electrical, plumbing, painting, tiles, and labor. The total estimated cost is 14,60,000 Indian rupees. It also outlines a 4 step process for the construction with costs at each step totaling the final estimated grand total.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Annai constructions

A.Chinnappan
Sahayapuram
Shenbaganur
Kodaikanal-625101
Cell:9942606330
9488251042
[email protected]
Date:

Ist floor DTL estimate value

Length for + = 38.6x22.3 =860.78 sqft


Portico area = 21.6x6.9 =149.04 sqft
Total value =Rs.14,60,000

1. Bricks = 12000 =Rs.1,08,000


2. Cement = 350bags =Rs.1,47,000
3. 3/4 inch Metal = 8unit =Rs.40,000
4. Sand = 16unit =Rs.90,000
5. Iron steel =12mm,10mm,
8mm,16mm =1600kg =Rs.95,000
WOOD WORK

6. IInd quality – Tic wood-Nigeria& labor = Rs. 1,70,000


7.Electrical Plumbing work = Rs. 1,00,000
8. Painting work = Rs.80,000
9. wethering =Rs. 50,000
10.Grill work, Sit out, window = Rs.80,000

TILES WORK
11. Flouring, Kitchenwall,
Toiletwall,Porticowall =1300sqft =Rs.80,000
12. Labour =Rs.4,20,000
Grand total =Rs.14,60,000
I step – building starting =Rs.5,00,000

II step – 10feet level


RCC concrete =Rs.4,00,000
III step- plastring work
starting =Rs.3,00,000

IV step- painting EB,


starting =Rs.2,60,000

Grand total =Rs.14,60,000