MP Central Scada
MP Central Scada
SCADA in Bhopal
City:- Best Practices
BY AK JAIN (GM)
MPMKVVCL, Bhopal
1
Content:-
Company overview at a glance.
SCADA/DMS Objective
Common utilities Issues Vs Better approaches
Other SCADA system utilisation for Best Practices.
Conclusion:-
SCADA/DMS Objective
Solution:-
Discom are continuously getting all the substations fault data at control center after
implementation of SCADA system in Bhopal City. After analysis of 16 months fault
data & ensuring of proper functionality of all protection system at 33/11 KV s/s ,
Discom has come out strongly before TRANSCO to revise their relay setting set at
minimum to judicious level providing DISCOM breaker to function not only to reduce
unwanted tripping of 11kv main and other breakers but also to avoid wide area
interruption to consumers.
Over Current and Earth Fault Tripping analysis of
11KV for Last 16 months from SCADA system
11KV OVER CURRENT TRIPPINGS 11KV OC+EF TRIPPINGS
11KV GR
Month 11 KV 11KV 33KV 33KV 33KV 11 KV 11KV 33KV 33KV TOTAL Analysis
TOTAL TOTAL 33KV IC
FDR MAIN MAIN IC EHV FDR MAIN MAIN EHV
Sep-16 157 146 47 52 6 3 969 931 359 39 1 4 1126 1) Total No. of S/s in city circle, Bhopal- 84
Nov-16 87 86 34 24 4 5 815 805 273 8 0 2 902 3) No. of S/s for which analysis covered- 30 to 40
Jan-17 116 113 28 25 4 1 913 905 303 28 1 0 1029 5) % on which 11 KV feeder breaker
O/C 29.73%
tripped along with 11 KV incoming
Feb-17 109 108 24 18 5 3 1145 1143 439 24 2 3 1254 breaker E/F 33.0%
Mar-17 192 192 49 32 5 1 1412 1402 520 31 2 0 1604 O/C 1.16%
6) % on which Discom breaker tripped
Apr-17 237 237 52 40 7 3 1342 1342 516 32 9 1 1579 and EHV breakers also tripped. E/F 0.27%
May-17 241 241 90 69 2 0 1327 1324 458 40 1 0 1568 7) % on which 11KV Feeder breaker not O/C 1.06%
Jun-17 412 403 43 54 16 8 1969 1876 332 81 14 26 2381 tripped E/F 1.24%
Jul-17 197 194 105 55 1 3 1692 1681 606 69 12 4 1889
Aug-17 174 174 65 36 10 3 1346 1344 448 44 16 0 1520
Sep-17 66 66 20 4 0 0 1225 1214 403 41 8 8 1291
Oct-17 42 41 19 7 1 0 1216 1209 371 45 4 0 1258
Nov-17 24 23 4 0 0 0 886 878 248 22 1 0 910
Dec-17 742 740 223 22 9 0 0 0 0 0 0 0 742 Data Source:- MPCZ, SCADA CC, Bhopal
Total 3005 2973 884 478 74 35 17968 17744 5857 557 72 50 20973
Over Current and Earth Fault Tripping analysis of
33Kv for Last 16 months from SCADA system
33KV OC TRIPPINGS 33KV EF TRIPPINGS
33KV GR
Month
TOTAL
33KV
33KV EHV TOTAL
33 KV
33KV EHV TOTAL Analysis
DISCOM DISCOM
Sep-16 37 37 27 66 66 60 103 1. Total No. of S/s in city circle, Bhopal- 84
2. No. of 33KV Feeder feeding supply to
Oct-16 14 14 12 44 44 39 58
city circle, Bhopal- 59
Nov-16 10 10 9 27 27 25 34 3. No. of S/s for which analysis covered 30 to 40
4. No. of 33KV Feeder for which analysis
Dec-16 12 12 7 42 42 35 47
covered- 18 to 32
Jan-17 10 10 6 28 28 9 38 7.% on which 33KV Discom Feeder O/C 100%
breaker tripped
Feb-17 17 17 14 25 25 18 41 E/F 99.9%
8.% on which Discom breaker tripped
Mar-17 16 16 13 35 35 29 49
but EHV breaker also tripped
O/C 47.2
undesirably due to insufficient time
Apr-17
5 5 3 25 25 20
30
coordination
E/F 50.09
9. Total % ON WHICH TRANSCO
May-17 168 BREAKER TRIPPING ALONG WITH 49.40
50 50 20 118 118 65 DISCOM BREAKER
Jun-17 35 35 16 123 123 85 158
Jul-17 42 42 20 125 124 33 167
Aug-17 47 47 11 156 156 39 203
Sep-17 32 32 5 87 87 29 119
Oct-17 13 13 1 84 84 15 97
Nov-17 7 7 1 61 61 27 68
Dec-17 2 2 0 45 45 18 47
TOTAL 349 349 165 1091 1090 546 1427 Data Source:- MPCZ, SCADA CC, Bhopal
Common Issues Vs Better approaches
• After various follow-up Transco has provided below given setting:-
PARTICULAR CT OVER CURRENT EARTH FAULT
EARLIER SETTING AT EHV 400/1 100 0.05 300 insta 20 0.05 200 instanta
ntan neous
eous
REVISED SETTING ON 31NO. 33KV 400/1 100 0.1 400 100 20 0.1 400 100 ms
FDRs wef. 23Jan-18 ms
Selected 33kv FDRs 400/1 100 0.15 600 140 20 0.15 600 140 ms
HAVING OG FDR ms
THROUGH LILO AT
DISCOM (26NO.)
wef. 12Feb-18
Result:-Tripping Status in Bhopal City
Circle
60%
50%
50%
20%
7%
10% Reduction in 33KV FDR Tripping
4% from EHV along with Discom
0% Breraker for feeders having O/G
FDR through LILO System
Before SCADA
After SCADA
LT Consumers-Interruption Averted in
Bhopal City ( Lacs)
1800000 16.9
Total:- 90.92 lacs
1600000
LT CONSUMERS
1400000 13.5
1200000
9.9
1000000 9.0
8.0 8.2
800000 7.6
6.4
600000 5.2 5.5
400000
200000
0
HT Consumers - Interruption Averted
in Bhopal City
1600
1377
1400
1200 1101
1000
812
800 729
651 622 662
11KV HT CONSUMERS
600 522
449 448 Total :-7374 nos
371 341
400
33KV HT CONSUMERS
170 217 132 Total:1620 nos
200 85 83 102 88
30
0
Reduction in tripping of 33KV feeders
from EHV S/S
MONTH
YEAR
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2016 175 110 245 147 412 508 459 445 318 180 119 116
2017 155 110 178 208 442 362 287 339 333 182 107 100
Tripping after SCADA
2018 123 97 98 139 141 355 162 202 209 134 62
* There is considerable reduction in tripping in the year 2018
after achieving revision in relay setting from Transco through 16
month SCADA DATA analysis . The tripping in 2018 after SCADA
has reduce to 64.08% & 74.08% respectively with reference to
tripping occurred in the year 2016 & 2018.
Common Issues Vs Better approaches
Challenge 2:-
Unwanted repeated charging and wrong operation by S/s operator:-
Repeated charging of the faulty feeder and wrong
operation was very common practice at the S/s, resulting high
probabilities of failure of costly equipment like PTR and other S/s
equipments.
Solution:-
• After implementing SCADA in the Bhopal City we have not only
reduced the wrong operations by operators but it has also facilitated
automatic smooth operations with minimizing disruptions.
• Unwanted charging on faulty feeder is almost 100% reduced in
Bhopal City circle.
• Continuous monitoring from SCADA control center enabled us
quick identification and replacement of faulty equipments.
Common Issues Vs Better approaches
Challenge 3: Average power factor
Solution:-
• After SCADA, monitoring of power factor started & the average
power factor improved from 0.92 to 0.97.
• Reduced burden of reactive penal charges on the company.
• Achieving judicious reactive power control has reduced overall
electrical losses.
• Effective utilization of capacitor bank is ensured.
• The power factor near to unity on targeted feeders through well-
coordinated switching of distribution capacitor banks.
• Increased efficiency, Improved voltage quality & reduction in
electrical (I2R) losses
Common Issues Vs Better approaches
Challenge 4:-Asset Utilization & Maintenance
Solution:-
Component failures can be detected and addressed rapidly without
relying on periodic routine inspections, which require a significant
resource allocation.
Detect equipment problems early and avoid lengthy customer
outages when catastrophic failures occur in this equipment.
PTR Failure in Bhopal City in the year 2017 & 18 become 0%.
Early problem detection has reduced the time and expense needed to
repair, rebuild, or replace the equipment.
The CT & ME failure rate in City Circle Bhopal in the year 2015-17
was around 7.3% and 6% respectively, which has reduced to 3.4%
and 2.5% respectively in the year 2017-18
BEST PRACTICES THROUGH SCADA
SYSTEM
FOLLOWIN BEST PRACTICES ARE BEING PERFORMED IN
BHOPAL THROUGH SCADA TO COMPLETELY MONITOR THE
HEALTH OF 63 NO S/S OF BHOPAL CITY
• i). Monitoring of TCH of all the 825Nos. 33KV and 11KV circuit
breakers of 63No. s/s at SCADA control centre ensuring
healthiness of the breaker functionality.
• ii).Monitoring of DC output voltage of the charger and AC supply
input to the charger of all 63No. s/s at SCADA control centre
ensuring functioning of protection system.
• iii). Monitoring of the OIL & Winding temperature of all the
123No. of Power Transformers at SCADA Control Centre ensuring
healthiness of the power transformers.
• iv). All substation equipment related complaints are
being observed through SCADA data/information. The
equipment complaint and rectification register is being
generated at SCADA CONTROL CENTRE. All these
complaints are being shared, almost at real time to all
concerned, on Whatsapp group and their rectification
is being ensured.
• v). Through SCADA fault data tripping analysis is being
performed and mal operations are being identified.
The outcome of the analysis being applied to reduce
such mal operation in future.
• vi). Daily SCADA report of Bhopal and Gwalior is being
prepared and shared to all concern including MD sir
and Director (Technical). Specimen is enclosed.
Conclusion:-
In addition to the numerous advantages of SCADA to the company
the great advantage of SCADA which has come up and has been
felt by the consumers is their enhance satisfaction
regarding power supply.
Overall, the SCADA information and its utilization not only have
improved the quality of supply to our esteemed LT & HT
consumers; it has proved to be an important tool for minimizing
the mishandling of equipment and their failure including vital
equipment like Power Transformer.
LT Consumer No 3,230,318
Employees No 15,351
Solution:-
Electronic Record Keeping.
Instantaneous alert , alarms or events are available.
All substation equipment related complaints are being observed through
SCADA data/information.
Organized data records and report generation automatically
Data analysis (real-time and historical data plotting of graphs, charts, trends,
etc.)
The equipment complaint and rectification register is being generated at
SCADA CC.
All these complaints are being shared, almost at real time to all concerned, on
Whatsapp group and their rectification is being ensured.
More accurate network planning can be done by which future load growth
and network expansion / change is effectively addressed.
Tripping and outages of supply related info is available without any manual
intervention.
Common Issues Vs Better approaches
Challenges 6 :- Reliability and Power Quality:-
• Maintaining a high level of service reliability and power quality 24*7
• Customer power outages should be infrequent and should be as short as possible.
• The number of momentary interruptions lasting one minute or less should also be
minimized.
Solution:-
• Installed FPI, Autoreclouser/sectioniser & RMU on feeders & started their
monitoring from SCADA control center.
• Balance the load between the selected group of feeders (i.e., transfer load from
heavily loaded feeders to lightly loaded feeders).
• Calendar-based maintenance strategy
• Fault Location Isolation and Service Restoration
– Reduction in the number of power outages experienced by the typical
customer in a year.
– Reduction in total outage duration (in minutes) that the typical customer
experiences
during a year.
– Reduction in amount of time spent doing fault investigation (i.e., patrol time),
with related savings from decreased labor and vehicle roll-time.
– Slight increase in kilowatt-hour sales because of shorter power outage
durations.
Fault Location Isolation and Service Restoration
Functional Benefit
Monetary Benefit
Improve SAIDI,SAIFI
and other reliability
statistics
Automatic Fault
Location, Reduce “Unserved Sell more KWH
Isolation & Energy” (KWH)
services
Restoration
Reduce customer
cost of outage
Reduce Fault
Investigation Time
Labour/vehicle
savings
Common Issues Vs Better approaches
Solution:-
• Automatically locates the damaged portion of the feeder between
two or more switches
• field crews only need to patrol the portion of the circuit that was
isolated by Sectionalizer.
• Reduction of “Unserved” Energy-A power outage can be viewed as
a lost opportunity for the electric utility to sell kilowatt-hours
(kWh).
• Reduction Customer Outage Costs like Cost to run private generator.
• Increase in kilowatt-hour sales because of shorter power outage
duration
Benefits of SCADA for Customers & Utility