Project Title Perticulate Feed Filters Pall Project No. FC-40.001046 Customer Name Pak-Arab Refinery Limited

The document provides fabrication drawings for particulate feed filters including dimensions for the core bottom cap to core top end clearance, stack pipe height, drain nozzle elevation and flush, material specifications, and a request to specify painting details and include an element table.

Uploaded by

Arjun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views

Project Title Perticulate Feed Filters Pall Project No. FC-40.001046 Customer Name Pak-Arab Refinery Limited

The document provides fabrication drawings for particulate feed filters including dimensions for the core bottom cap to core top end clearance, stack pipe height, drain nozzle elevation and flush, material specifications, and a request to specify painting details and include an element table.

Uploaded by

Arjun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

00

Rev. No.
Date
Project Title

15-Nov-18

Format No.: PED-108 Rev. 01


Document Title
Pall Project No.

Customer Name

Pall Document No.


:
:
:
:
:
:

--

Issued for Approval


Revision Description
FC-40.001046

FC-40.001046-202

AS
Prep'd By
GA & Fabrication drawing

AS
PERTICULATE FEED FILTERS

PAK-ARAB REFINERY LIMITED

Chek'd By
No. of Pages
1

RLK
App'd By
© 2019 Pall Corporation. This document may contain confidential technical data, including trade secrets proprietary to Pall Corporation. The drawing, design rights and all other disclosures in this document are the property of
Pall Corporation.Unauthorised use, copying, distribution to third parties, manufacture or reproduction in whole or in parts is prohibited.
element removal
1050 free space
required for

clearance
10-15
delete

core bottom cap to core top end


internal assembly show as

~1059
per pall drawing

painting detail
please specify

stack pipe
280

hight
nozzle elevation +315
(to be cleared the
tubesheet)
drain nozzle flush
to tubesheet top

show
element table

delete

delete
delete

SA 516 Gr. 70

delete
Stud length please
check & correct
3

By Vinod Satote at 3:26 pm, Nov 20, 2018


remove