0% found this document useful (0 votes)
34 views

Quarterly Progress Report: Document No. Xxxx-Pmc-Qpr-Q1 Rev. 0

This quarterly progress report provides updates on construction, pre-commissioning, and commissioning activities for a project. It outlines two risks areas and their mitigation plans, notes concerns in several areas and quality and safety issues. Attachments include a schedule, cost curves, a document checklist, resource data, and other documents.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Quarterly Progress Report: Document No. Xxxx-Pmc-Qpr-Q1 Rev. 0

This quarterly progress report provides updates on construction, pre-commissioning, and commissioning activities for a project. It outlines two risks areas and their mitigation plans, notes concerns in several areas and quality and safety issues. Attachments include a schedule, cost curves, a document checklist, resource data, and other documents.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUARTERLY PROGRESS REPORT Document No.

XXXX-PMC-QPR-Q1
Rev. 0

Construction/Pre-Commissioning & Commissioning Plan Activities


a)
b)
Construction/Pre-Commissioning & Commissioning Risks
Risk Areas Mitigation Plan Status
a)
b)
Area of Concerns
a)
b)
Quality Issues
a)
b)

Safety Issues or Incident that Occurred within Reporting Period


a)
b)

Attachments
1. Schedule
2. S-curves
3. DCL
4. Resource Loading Histograms and Curves
5.