Item Descriptions Total Take Off in Schedule Soil Waste and Vent Pipe

This document provides a marking scheme for an assignment involving taking off quantities from construction drawings. It outlines a 50% breakdown for Part 1(a) involving creating a schedule of soil, waste and vent pipes with 14 items. It also outlines a separate 50% breakdown for Part 1(b) which involves taking off quantities for concrete and reinforcement of structural elements from the drawings and listing them out. The total mark allocation between the two parts is 100%.

Uploaded by

Dalila Dylea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Item Descriptions Total Take Off in Schedule Soil Waste and Vent Pipe

This document provides a marking scheme for an assignment involving taking off quantities from construction drawings. It outlines a 50% breakdown for Part 1(a) involving creating a schedule of soil, waste and vent pipes with 14 items. It also outlines a separate 50% breakdown for Part 1(b) which involves taking off quantities for concrete and reinforcement of structural elements from the drawings and listing them out. The total mark allocation between the two parts is 100%.

Uploaded by

Dalila Dylea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MARKING SCHEME DQS201 - DEC18

1 (a) 1(b)

Item DESCRIPTIONS Total Item DESCRIPTION Unit Unit Des Sidecast Dim Total
1 Concrete for Column C1 M3 1 3 3 3 10
Take off In Schedule
2 Formworks for Column C1 M2 1 3 3 3 10
1a SOIL WASTE AND VENT PIPE
3 Reinforcement for Column C1 Kg 1 3 3 3 10
1 Excavate trench 3
4 Concrete for FFB1 M3 1 3 3 3 10
Laid in trench
2 50 mm dia waste pipe 3 5 Formworks for FFB1 M2 1 3 3 3 10

In concrete slab 6 Reinforcement for FFB1 KG 1 3 3 3 10

3 50 mm dia waste pipe 3

4 32 mm dia waste pipe 3

Fixed to brickwall

5 100 mm dia vent pipe 3

6 32 mm dia waste pipe 3

Fittings

7 Pedestal water closet 3


8 Squatting 3
9 Basin 3
9 Sink 3
10 Floor trap 3
11 Bend 3
12 Bottle trap 3 Sub Total 1(b) 60
13 S trap 3

14 Testing 3

Sub Total (1a) 45

1(a) Schedule 1(b) Taking Off


1. Taking off Total reduced to 20% 45 X 18% 18%
45

Billing Taking off 60 X 40% = 40%


2. Description for each item 14 items x 2 point 28% 60
Taking off list 3.00%
4. Taking off list 2% Query list 3.00%
5. Query List 2% Principle 2%
Accurancy 2%
Total 1(a) 50% Total 1(b) 50% Grand Total (1a+1b) 100%