The document outlines the process for vendor commissioning of multiple projects. It shows the client providing documentation like electrical drawings and approved drawings to the vendor. The vendor then provides offers, inspection reports, and technical certificates back to the client. It also shows engineering drawings being submitted and commented on between the client and vendor for different projects.

Uploaded by

DM
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Excel Folder Structure

The document outlines the process for vendor commissioning of multiple projects. It shows the client providing documentation like electrical drawings and approved drawings to the vendor. The vendor then provides offers, inspection reports, and technical certificates back to the client. It also shows engineering drawings being submitted and commented on between the client and vendor for different projects.

Uploaded by

DM
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT(Client) VENDOR COMMISSIONING

STANDARD BOUGHTOUT
JOB NO 1 REF DOC FROM CLIENT
PROJECT(CLIENT)
JOB NO 2 DOCUMENTS

JOB NO 3 ELECTRICAL DRAWINGS


VENDOR
JOB NO 4 APROVED DRAWING
JOB NO...n
COMMISSIONING INSPECTION REPORT & TC
PROJECT A
JOB NO 1
PROJECT B
BOUGHTOUT JOB NO 2
JOB NO 3
INFORMATION TO VENDOR
STANDARD JOB NO 4
OFFERS FROM VENDOR
JOB NO...n

ELECTRICAL DRAWINGS

JOB NO 1
JOB NO 2
JOB NO 3
JOB NO 4
JOB NO...n

LPBS SITE ASBUILD

COMMISSIONIN
G PROTOCOL

HANDOVER DOC

MOM

SOFTWARE &
LOGIC PROJECT A

PROJECT B
TRAINING
MANUAL
BLOCK LOGIC DIAGRAM
CONTROL PHYLOSOPY
I/O LIST

PROJECT A
PROJECT B
SUBMITED DWG 1 BY ABCD ON DATE
ABCD
COMMENTED DWG 1 BY ABCD ON DATE
TO VENDOR
SUBMITED DWG 2 BY ABCD ON DATE
M VENDOR
COMMENTED DWG 2 BY ABCD ON DATE

RAWINGS SUBMITED DWG 3 BY ABCD ON DATE


COMMENTED DWG 3 BY ABCD ON
DATE
SUBMITED DWG 4 BY ABCD ON DATE

SUBMITED DWG 1 BY ABCD ON DATE


ABCD
COMMENTED DWG 1 BY ABCD ON DATE

SUBMITED DWG 2 BY ABCD ON DATE

COMMENTED DWG 2 BY ABCD ON DATE

SUBMITED DWG 3 BY ABCD ON DATE


COMMENTED DWG 3 BY ABCD ON
DATE
SUBMITED DWG 4 BY ABCD ON DATE

ROJECT A

ROJECT B
SUBMITED DWG 1 BY ABCD ON DATE
ABCD
COMMENTED DWG 1 BY ABCD ON DATE

SUBMITED DWG 2 BY ABCD ON DATE

COMMENTED DWG 2 BY ABCD ON DATE

SUBMITED DWG 3 BY ABCD ON DATE


COMMENTED DWG 3 BY ABCD ON
DATE
SUBMITED DWG 4 BY ABCD ON DATE

SUBMITED DWG 1 BY ABCD ON DATE


ABCD
COMMENTED DWG 1 BY ABCD ON DATE

SUBMITED DWG 2 BY ABCD ON DATE

COMMENTED DWG 2 BY ABCD ON DATE

SUBMITED DWG 3 BY ABCD ON DATE


COMMENTED DWG 3 BY ABCD ON
DATE
SUBMITED DWG 4 BY ABCD ON DATE