Crusteam Nigeria Limited: All Bending Dimensions Are in Accordance With BS4466:1989 Shape Code
The document is a bending schedule for an LPG tank farm development project in Nigeria. It provides details of the reinforcing bars needed for the first floor slab, including the bar mark, number of bars, length of each bar, total length, and bending dimensions. It lists 28 different bar markings and specifications. It concludes by calculating the total weight of reinforcing steel for two bar sizes, the total weight in tons, and the required volume of concrete.
We take content rights seriously. If you suspect this is your content, claim it here.
0 ratings0% found this document useful (0 votes)
149 views2 pages
Crusteam Nigeria Limited: All Bending Dimensions Are in Accordance With BS4466:1989 Shape Code
The document is a bending schedule for an LPG tank farm development project in Nigeria. It provides details of the reinforcing bars needed for the first floor slab, including the bar mark, number of bars, length of each bar, total length, and bending dimensions. It lists 28 different bar markings and specifications. It concludes by calculating the total weight of reinforcing steel for two bar sizes, the total weight in tons, and the required volume of concrete.
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 2
Job No. Drawing No. Sheet No.
Rev
Crusteam Nigeria Limited
23-07-2018 0 BENDING SCHEDULE Revision A B C D LPG Tank Farm Development Made by/ Date:FIO Ijegun-Egba, Lagos Chd. by/Date: BE/24/07/2018 NuNumber Total Length of Shape All bending dimensions are in accordance with BS4466:1989 Section of Work Mar Mark Total code m in number each bar A B C D E/R ADMINISTRATIVE beeach mm Length Type Size No. mm mm mm mm mm BUILDING r (m) of FIRST FLOOR SLAB gr ou H1201 1 ps 28 28 11962 334.94 38 935 115 10960 H1202 1 28 28 12093 338.6 38 935 115 11091 H1203 2 28 56 12000 672 20 12000 H1205 1 28 28 9397 263.116 38 935 115 8395 H1206 1 28 28 9454 264.71 38 935 115 8452 H1008 1 144 144 3460 498.24 20 3460 H1009 1 11 11 4395 48.345 20 4395 H1010 1 11 11 9360 102.96 20 9360 H1011 1 63 63 12000 756 20 12000 H1012 2 11 22 10900 239.8 20 10900 115 6690 H1013 1 133 133 7700 1024.1 38 935 115 6690 H1014 1 12 12 3440 41.28 20 3440 H1215 1 126 126 7830 986.58 38 935 115 6820 H1017 1 8 8 5755 46.04 20 5755 H1018 1 8 8 12000 96 20 12000 H1020 1 16 16 5457 87.312 20 5457 H1021 1 8 8 6420 51.36 20 6420 H1022 1 4 4 2168 8.672 20 4265 H1024 1 32 32 4270 136.64 20 4270 H1025 1 8 8 6165 49.32 20 6165 H1026 1 16 16 5400 86.4 20 5400 H1028 1 52 52 2923 152 20 2923
FIRST FLOOR SLAB QUANTITY TAKE-OFF
UNIT TOTAL SIZE WEIGHT(kg/m) LENGTHT(m) TOTAL WEIGHT (kg) TOTAL WEIGHT (tons) H10 0.616 3424.469 2109.472904 2.109472904 H12 0.888 2859.95 2539.636 2.5396356 TOTAL 4649.109 4.649109 VOLUME OF CONCRETE(Cu.m) 62.379 R= Round mild steel reinforcement BS 4449 H = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E. x = General abbreviations for other than R and H. REV