Crusteam Nigeria Limited: All Bending Dimensions Are in Accordance With BS4466:1989 Shape Code

The document is a bending schedule for an LPG tank farm development project in Nigeria. It provides details of the reinforcing bars needed for the first floor slab, including the bar mark, number of bars, length of each bar, total length, and bending dimensions. It lists 28 different bar markings and specifications. It concludes by calculating the total weight of reinforcing steel for two bar sizes, the total weight in tons, and the required volume of concrete.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
149 views2 pages

Crusteam Nigeria Limited: All Bending Dimensions Are in Accordance With BS4466:1989 Shape Code

The document is a bending schedule for an LPG tank farm development project in Nigeria. It provides details of the reinforcing bars needed for the first floor slab, including the bar mark, number of bars, length of each bar, total length, and bending dimensions. It lists 28 different bar markings and specifications. It concludes by calculating the total weight of reinforcing steel for two bar sizes, the total weight in tons, and the required volume of concrete.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 2

Job No. Drawing No. Sheet No.

Rev

Crusteam Nigeria Limited


23-07-2018 0
BENDING SCHEDULE Revision A B C D
LPG Tank Farm Development Made by/ Date:FIO
Ijegun-Egba, Lagos Chd. by/Date: BE/24/07/2018
NuNumber Total Length of Shape All bending dimensions are in accordance with BS4466:1989
Section of Work Mar Mark Total code
m in number each bar A B C D E/R
ADMINISTRATIVE beeach mm Length
Type Size No. mm mm mm mm mm
BUILDING r (m)
of
FIRST FLOOR SLAB
gr
ou
H1201 1 ps 28 28 11962 334.94 38 935 115 10960
H1202 1 28 28 12093 338.6 38 935 115 11091
H1203 2 28 56 12000 672 20 12000
H1205 1 28 28 9397 263.116 38 935 115 8395
H1206 1 28 28 9454 264.71 38 935 115 8452
H1008 1 144 144 3460 498.24 20 3460
H1009 1 11 11 4395 48.345 20 4395
H1010 1 11 11 9360 102.96 20 9360
H1011 1 63 63 12000 756 20 12000
H1012 2 11 22 10900 239.8 20 10900 115 6690
H1013 1 133 133 7700 1024.1 38 935 115 6690
H1014 1 12 12 3440 41.28 20 3440
H1215 1 126 126 7830 986.58 38 935 115 6820
H1017 1 8 8 5755 46.04 20 5755
H1018 1 8 8 12000 96 20 12000
H1020 1 16 16 5457 87.312 20 5457
H1021 1 8 8 6420 51.36 20 6420
H1022 1 4 4 2168 8.672 20 4265
H1024 1 32 32 4270 136.64 20 4270
H1025 1 8 8 6165 49.32 20 6165
H1026 1 16 16 5400 86.4 20 5400
H1028 1 52 52 2923 152 20 2923

FIRST FLOOR SLAB QUANTITY TAKE-OFF


UNIT TOTAL
SIZE WEIGHT(kg/m) LENGTHT(m) TOTAL WEIGHT (kg) TOTAL WEIGHT (tons)
H10 0.616 3424.469 2109.472904 2.109472904
H12 0.888 2859.95 2539.636 2.5396356
TOTAL 4649.109 4.649109
VOLUME OF CONCRETE(Cu.m) 62.379
R= Round mild steel reinforcement BS 4449
H = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E.