1.Design criteria
1.1 Scope 2
1.2 T y p e of structure 2
1.3 En g i n e r i n gs pec i f i c a t i oand
n d oc u me nt f o r d esign as f o l l o w
ings 2
1.4 Codes and standards 2
1.5 Mat erial s 3
2.Desig1.5n load and loading combination
2.1 Earthquake load 4
2.2 Wind load 4
2.3 Dead load 5
2.4 Imposed load 5
2.5Loading combination 8
3.Other requirements
3.1Friction coefficients 8
3.2 A llowa b l e deflections a nd d e formation s 8
4. Conclusion AND Calculation
4.1 Summary detail 9
• 4.2 Member Modify and Addition 10
• 4.3 Staad pro report detail 13
1
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
1.Design criteria
1.1 Scope
The steel structure calculated check actual load on pipe rack bridge cross road and steel member check for
re calculationcheck status of pipe rack
1.2 T y p e of structure
Steel structure.
• Structure Steel
2
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
• Structural steel
• Anchor bolt
ASTM A307 or equivalent
• Common bolt
ASTM A307 or equivalent
3
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
Not applicable.
• The velocity pressure (qz) shall be calculated from the following equations refer to.
4
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
0-4.6 75 0.85
6.1 80 0.90
7.6 83 0.94
9.1 86 0.98
12.2 92 1.04
15.2 96 1.09
Body load shall mean the total self weight of the structure, Calculationby program
Dead load shall mean all materials permanently attached thereto or supported thereby.
- Pipe larger than 12 inch diameter shall be considered as concentrated loads in their actual
location.
- Pipe larger than 12 inch diameter shall be considered as concentrated loads in their actual
location.
5
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
- For anchor bay of pipe racks, the horizontal force shall be taken as the greater of ;
a) Anchor force from pipe stress calculation.
b) 10% of piping vertical loads from 4 bay length.
Buildings
For buildings, imposed loads on floors shall be the actual loads when these are known, but in any
case shall not be less than the distributed loads given below or the minimum requirements imposed by ASCE
7-05 ;
Description
qk Qk(*)
(kg/m2) (kg)
6
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
: All member shall be checked for an alternative point or concentrated load (Qk) to be applied
over a square of side 300 mm.
qk Qk(*)
Description
(kg/m2) (kg)
Steel floor plates (Chequered plate and open grid flooring) 400 500
Minor platforms, walkways and floors used for access only 150 250
7
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
0.84BL+0.84DL+0.8PE+0.474WL(+X)+0.8SC+0.8LL
0.84BL+0.84DL+0.8PE+0.474WL(+Z)+0.8SC+0.8LL
1.05BL+1.05DL+1.0 OPE+1.0LL+1.0AF
1.05BL+1.05DL+1.0 OPE +1.00 LL+1.00 FF
0.84BL+0,84DL+0.80OPE+0.80LL+0.8WL(+X)
0.84BL+0,84DL+0.80OPE+0.80LL+0.8W
3. OTHER REQUIREMENTS
A) Lateral deflection
Maximum allowable lateral deflection of structural frames and buildings ;
Where ; H and Ho are respectively (Height between levels) and (Total height of structure).
B) Beam deflection
Maximum allowable deflection of beam and under total vertical load shall be ;
Maximum joint displacement vertical at node 84 = 16.031 mm. 10325/200 = 51.62 mm. more than 16.031 mm OK
Maximum joint displacement horizontal at node 745 = 25.185 mm. 16200/300 = 54 mm. more than 25.185mm OK
9
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
Complete Web /diagonal member 2L90*90*7 and weld around Leg of angle both side
10
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
Add post H100*100 and beam C150*75 all at support cable (set back plumpness of existing post complete
before install new post and beam
11
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
12
PROJECT PIPE BRIDGE CROSS ROAD(MODIFY)
Rev.02
CONTRACTOR CCK Engineering & Construction Co.,Ltd.
Date:27.12.18
CLIENT VINYTHAI PUBLIC COMPANY LIMITED
13