SL No. Item Decription Unit Qty

The document is a bill of materials for an electrical distribution project. It contains 42 line items with descriptions of materials, units, and quantities needed. The total cost will be calculated from the costs of the individual line items. Some key materials included are: 9m and 8m poles, cross arms, insulators, conductors, transformers, hardware, and accessories for overhead line construction.

Uploaded by

Prashant Trivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

SL No. Item Decription Unit Qty

The document is a bill of materials for an electrical distribution project. It contains 42 line items with descriptions of materials, units, and quantities needed. The total cost will be calculated from the costs of the individual line items. Some key materials included are: 9m and 8m poles, cross arms, insulators, conductors, transformers, hardware, and accessories for overhead line construction.

Uploaded by

Prashant Trivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SL

Item Decription Unit Qty


No.

1 9mtr PSCC Pole 300Kg W/L No 6


2 PSC pole 8mtr long, 200 kg W / L No 3
3 9mtr PSC Pole 200Kg W/L No 8
11KV Horizontal X arm with HTST supports for
4 No 6
PSCC/RCC poles
11KV Horizontal X arm with HTST Supports for PSC
5 No 22
poles
6 45KN Composite Polymer Insulators No 42
7 11KV Composite Polymer Pin Insulators No 36
8 11KV Guy Set Complete Set 14
9 Concrete materials of Guy Set without cement No 14
10 11KV Class 200Amps Single Break G.O.S No 1
11 H-Frame for Mounting 200Amps G.O.S No 1
ACSR RABBIT CONDUCTOR including Sag &
12 Kms 2.040
Jumpering
13 Spiral Earth Electrode No 17
14 PG Clamps Rabbit to Rabbit No 30
15 Fish Plates for stud pole (without pole) No 1
16 Guarding materials for road crossing (40-50mtr span) Span 0
17 Danger board No 5
18 Anti Climbing Device (Barbed wire) 12m/1kg Kg 5
11 KV Lightening Arrester, polymeric type/MetalOxide
19 Set 5
9KV,5KA
Piercing connectors 16 sqmm-95 sqmm for AB cable
20 No 4
service connection
9mtr PSCC pole 300kg and Single pole TC set for
21 Set 5
25KVA Transformer
11KV/433V ,25 KVA 3-phase 50 cys 3 Star
22 No 5
Transformer
23 Pipe type Earthing No 15
24 GI wire No.8 SWG Kg 50
25 Guy Wire 7/10SWG Kg 84
26 LT Protection Kit No 5
27 LT wiring Kit No 5
28 HG Fuse Set (3 No of solid core insulators) Set 5
1.1KV (LT) class 3 phase AB Cable (3 X 35 Sq mm +
29 Km 0.162
1 X 25 Sq mm)
Jungle Clearing : 3 mtr corridor (1.5mtrs on either side
30 Km 0.063
of line)
31 Rectification of Leaned Poles No 0
32 Releasing of Existing No.4 ACSR conductor Km 0.641

33 Releasing of Existing LT Line hard ware materials No 8

34 Releasing of Existing 63/100/250KVA Transformers No 1


35 Releasing and Refixing of 4-Pin X arms No 0
36 Releasing and Refixing of 8m RCC poles Set 0
Releasing & Restringing of Existing 2/4 ACSR
37 Conductor (For Conversion of LT to HT Line & New HT Km 0.767
Line)
38 Releasing of 8/7.5mtr poles No 3

39 Suspension clamp assembly including pole clamps Nos 1


Dead end clamp / Anchor clamp assembly including
40 Nos 6
brackets, pole clamps
41 Universal Hook with pole clamps and Bolts & Nuts Nos 7

42 Alkathene tube (R-Y-B-G) coils 10


43 Special 3 Pin Cross Arm Nos 0