6117 SAF Package-RevA M
6117 SAF Package-RevA M
City: Jeddah
Remarks: New
Technology Activity
2G (900MHz) No
2G (1800MHz) No
3G (U900) New
3G (U2100) New
LTE-FDD (800MHz) NO
NEW 3G SITE
Site Information
Site ID UXJD6117 Phase 2017 Modernization Project
Cluster 2G Vendor Ericsson
RNC Latitude 21.51067
District Al Shrafiah Longitude 39.19051
Street Site Coverage City
City JEDDAH Site Type 09m SB
Region West Scope New 3G[U900+U2100]
Technology 3G [U900+U2100] Frequency Band 900MHz [B8] + U2100 [B1]
Antenna Configuration
A B C
A B C
Antenna Type TBXLHA-6565C-VTM TBXLHA-6565C-VTM TBXLHA-6565C-VTM
Number of Antennas 1 [Existing FDD] 1 [Existing FDD] 1 [Existing FDD]
Antenna Azimuth (°) 140 230 310
Electrical Tilt (°) 4 4 4
Mechanical Tilt (°) 0 0 0
Antenna Height (m) 32 32 32
RET 1x Existing FDD 1x Existing FDD 1x Existing FDD
TMA/ASC No No No
Diplexers No No No
Feeder Configuration
A B C
U900 U2100 U900 U2100 U900 U2100
Feeder Type 1/2" Jumper 1/2" Jumper 1/2" Jumper 1/2" Jumper 1/2" Jumper 1/2" Jumper
Feeder Length (m) 3m 3m 3m 3m 3m 3m
Total Losses (dB) 0.3 0.9 0.3 0.9 0.3 0.9
Dl/Ul Attenuation 3 9 3 9 3 9
Dl/Ul Feeder Delay 154 184 154 184 154 184
Cell Configuration
Cell ID 61171 61172 61173
Number of Carriers [2/2/2]U2100 + [1/1/1]U900 [2/2/2]U2100 + [1/1/1]U900 [2/2/2]U2100 + [1/1/1]U900
Output Power [20/20]W_U2100 + 40W_U900 [20/20]W_U2100 + 40W_U900 [20/20]W_U2100 + 40W_U900
Justification
Coverage Capacity
Comments:
- Scope is New 3G Site (U900 and U2100) under 2017 modernization project.
- SAF Revised due to change in Site Type and antenna height
- 3G will share the existing FDD antennas .
- 3G will share the existing 6150 TDD Cabinet.
- 3G will share the existing FDD ERS2219[B1].
- Radio 2219 B8, (900MHz), 10W+10W HWAC incl.[3 Qty] .
- Baseband 6620, incl. 6 CPRI ports (Ph.HW and Initial cap.) [1 Qty] .
- Baseband 6620 CPRI port expander, 7-15 ports [1 Qty] .
- WCDMA Cell Carrier HWAC will be taken [9 Qty] .
- Output Power HWAC 20W incr.steps [3 Qty] for B8-U900 .
Ericsson Responsible
RND Responsible Ahmad Ba Nafea RND Team Leader Badr Barboud
Date of Approval Date of Approval 24-Oct-18
Mobily Responsible
RND Responsible RND Team Leader
Date of Approval Date of Approval
SCF No. 6117 RevB
LTE SITE ACCEPTANCE FORM Date 31-Oct-18
New LTE-FDD
Site Information
Site ID LOJD6117 Phase 2017 Modernization Project
Cluster 2G Vendor Ericsson
EPC/MME Latitude 21.51067
District Al Shrafiah Longitude 39.19051
Street Site Coverage City
City JEDDAH Site Type 09m SB
Region West Scope New FDD1800 + FDD2100
Technology FDD [1800+2100]MHz Frequency Band 1800MHz [B3] + 2100MHz [B1]
Antenna Configuration
A B C
Antenna Type TBXLHA-6565C-VTM TBXLHA-6565C-VTM TBXLHA-6565C-VTM
Number of Antennas 1 [New] 1 [New] 1 [New]
Antenna Azimuth (°) 140 230 310
Electrical Tilt (°) 4 4 4
Mechanical Tilt (°) 0 0 0
Antenna Height (m) 32 32 32
RET Yes [New] Yes [New] Yes [New]
TMA/ASC No No No
Diplexers No No No
Feeder Configuration A B C
FDD1800 FDD2100 FDD1800 FDD2100 FDD1800 FDD2100
Feeder Type 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"
Feeder Length (m) 3m 3m 3m 3m 3m 3m
Total Losses (dB) 0.7 0.9 0.7 0.9 0.7 0.9
Dl/Ul Attenuation 7 9 7 9 7 9
Dl/Ul Feeder Delay 17.37 18.36 17.37 18.36 17.37 18.36
RBS Configuration
Cabinet Type 1x 6150 [Existing TDD]
Cabinet Shared Yes
Carriers [FDD] Dual Carrier
Power [FDD] (2x60)W_FDD1800 + (2x40)W_FDD2100
DU Type [FDD] BB6630[Existing TDD]
RU Type [FDD] 3xR2219 B3 + 3xR2219 B1
CU's HUP[Existing TDD]
G1800 No
G1800 MM No
U2100 Yes
U2100 MM Yes
Justification
Coverage Capacity
Comments:
- Scope is new site of FDD1800 and FDD2100.
- New FDD Antennas 3x TBXLHA-6565C-VTM .
- SAF Revised due to change in Site Type and antenna height
- FDD will share the existing 6150 TDD Cabinet.
- Both FDD and TDD will share the same BB and Physical Link with only 1 unique Site Name.
- Radio 2219 B3 (1800MHz), 10W+10W HWAC incl. [3 Qty]
- Radio 2219 B1, (2100MHz), 10W+10W HWAC incl. [3 Qty]
- LTE-FDD Cell Carrier 5MHz B/W incr.step HWAC [15 Qty]
- Output Power HWAC 20W incr.steps [15 Qty] for B1 FDD2100
-Output Power HWAC 20W incr.steps [15 Qty] for B3 FDD1800
Ericsson Responsible
RND Responsible Ahmad Ba Nafea RND Team Leader Badr Barboud
Date of Approval Date of Approval 31-Oct-18
Mobily Responsible
RND Responsible RND Team Leader
Date of Approval Date of Approval
SCF No. 6117 RevA
TDD SITE ACCEPATNCE FORM Date 24-Oct-18
Antenna Configuration
6117-11A / 6117-12A 6117-11B/6117-12B 6117-11C/ 6117-12C
A B C
Antenna Type K80010622 K80010622 K80010622
Number of Antennas 1 [New] 1 [New] 1 [New]
Antenna Azimuth (°) 140 230 310
Electrical Tilt (°) 4 4 4
Mechanical Tilt (°) 0 0 0
Antenna Height (m) 32 32 32
RET Yes Yes Yes
TMA/ASC No No No
Filter NO NO NO
Feeder Configuration
Feeder Type 1/2" 1/2" 1/2"
Feeder Length (m) 3 3 3
Total Losses (dB) 0.9 0.9 0.9
Dl/Ul Attenuation 9 9 9
Dl/Ul Feeder Delay 21.4 21.4 21.4
RBS Configuration
Cabinet Type 1x 6150 [New]
Cabinet Sharing Yes
Carreirs [TDD] Dual Carrier
RBS Power 4x22.8W-F1 + 4x17.2W-F2
DU Type [TDD] 1x 6630 [New]
RU Type [TDD] 3x RRUS72
CU's 3 HUP's
Cell Configuration
Cell Name 6117-11A 6117-11B 6117-11C 6117-12A 6117-12B 6117-12C
Carrier Bandwidth 20Mhz 20Mhz 20Mhz 15Mhz 15Mhz 15Mhz
No. of RB's 100 100 100 75 75 75
Output Power 4x 22.8W 4x 22.8W 4x 22.8W 4x 17.2W 4x 17.2W 4x 17.2W
Type of MIMO 4x4 4x4 4x4 4x4 4x4 4x4
Justification
Coverage Capacity
Comments:
- Scope is new site of TDD 2600..
- SAF Revised due to change in Site Type and antenna height
- New TDD antennas 3x K80010622
- TDD will use new cabinet 6150 and to be shared with [FDD + 3G U900, U2100].
- Baseband 6630, incl. 6 CPRI ports (Ph.HW and Initial cap.) [1 Items] from TDD BoQ.
- Both FDD and TDD will share the same BB and Physical Link with only 1 unique Site Name.
- Baseband 6630 CPRI port expander, 7-15 ports, [1 Items] from TDD BoQ.
- LTE-TDD Cell Carrier 5MHz Bandwidth HWAC [21 Items] from TDD BoQ.
- Remote Radio Unit RRUS 72 B41 -48VDC, 4x5 W HWAC incl. [3 Items] from TDD BoQ.
- Output Power HWAC 20W incr.steps [21 Items] from TDD BoQ.
Ericsson Responsible
RND Responsible Ahmad Ba Nafea RND Team Leader Badr Barboud
Date of Approval Date of Approval 24-Oct-18
Mobily Responsible
RND Responsible RND Team Leader
Date of Approval Date of Approval