P 830 Design Development
P 830 Design Development
P-830-A
Design and Development
1.0 Purpose/Scope
1.1 This procedure describes the process for controlling the design and
development of product or services to ensure the subsequent provision of
products and services at Your Company.
1.2 The procedure applies to the design and development projects that are initiated
and planned for new products or services.
2.1 The Research & Development / Technical manager has the prime responsibility
and approval authority for this procedure.
2.2 In support of the Research & Development / Technical manager, the Project
manager / design engineer are responsible for initiating the design plan, getting
appropriate approvals and holding design reviews.
2.3 Additional responsibilities for project manager / design engineer / design team /
sales and marketing personnel are detailed in relevant paragraphs of section 5.0.
3.1 Reference
3.1.1 This document relates to clause 8.3 of the ISO 9001:2015 standard
covering, Design and development of products and services.
3.2 Definitions
3.2.3 Design Changes: Changes made to the inputs or plan during design and
development activities.
4.0 Resources
4.1 None
5.0 Instructions
5.1 In support of the planning procedures P-810 for Operational planning and
control, and P-910 for Monitoring, measurement, analysis and evaluation, design
and development projects are initiated and planned for new products or services,
or processes.
5.1.1 The need for a new product, service or process is based on customer
requests, market conditions, new product, service or process ideas, new
Design and development Page 1 of 7
Date printed 1/23/19 6:02 PM
INSERT YOUR COMPANY LOGO/NAME HERE
P-830-A
Design and Development
equipment or other situation when the detailed requirements are not
already established or not defined by the customer or by other interested
parties,
5.1.2 Design projects detail the requirements for products and services so that
they are adequate for subsequent production or service provision.
5.2 The R&D manager designates a project manager / project engineer for the
project, assigns a project number, and logs the project in the log.
5.2.1 The project manager starts a Project plan in order to determine the
stages and controls for design and development.
5.2.3 The team assigns a timeline to the project, determines appropriate design
reviews, validation and verification activities and documents them on the
design plan. You may want to categorize the project on a scale of 1 to 10
where 10 indicates a complex project and 1 a simple project.
Estimated costs,
Safety requirements,
5.3.2 The design team reviews the inputs to make sure they are complete and
adequate for design and development purposes. Incomplete, ambiguous
or conflicting inputs are resolved by the team.
5.4.1 The design and development process is controlled to ensure that the:
5.5 Design Reviews are conducted as scheduled in the project plan, and as needed.
5.5.1 The design review record form F-830-002 is used to document results of
design reviews.
You may want to require a design review at this point in the
project. Have the R&D manager or similar function review the project
5.6.1 The design team ensures that design and development outputs:
Prototypes
5.7 The design team verifies the design output against design input by the method
identified in the design plan.
Laboratory experiments
Line Trials
Prototype evaluation
5.8 The team holds a design review meeting to review verification results.
5.8.1 When verification is acceptable, the project will proceed to design
validation.
If results are not acceptable, the team will determine if a design
change is required, if the project will go back to the development
stage, or if the project is to be terminated.
Decisions are documented in the design review record F-830-002.
5.9 Design validation is performed according to the project plan.
Customer Trials
Production Trials
Beta Testing
Production scale-up
5.9.2 Results of validation activities are documented and filed in the design
project file.
5.9.3 The team holds a design review meeting to review validation results and
determines if they are acceptable.
5.11.1 When a design change is made the project goes through verification and
validation before being released to ensure there is no adverse impact on
the conformity to requirements.
5.11.3 The change is approved by the original approvers of the project plan.
5.12 Documented information resulting from the whole of the design and
development process, (that is, the planning, the inputs, the controls, the outputs,
the design changes, the reviews, the authorization of changes, and actions taken
to prevent adverse impacts) are controlled and retained with procedure P-750
Control of documented information.
5.12.1 When the design project is complete and all output documents are
approved and released, the project manager closes the project.
5.12.2 The project manager reviews the design project file to make sure the file
complete, containing all required records.
5.12.3 The project manager dates the project log and closes the project.
6.1 Forms
7.1 The planning procedure P-600 for Planning for the Quality management system
addresses opportunities and risks (risk-based thinking).
7.2 As applicable to your company, make use of your organizational knowledge,
lessons learned and experience with the activities associated with Design and
development to determine the opportunities and risk that need to be addressed
and that can:
Give assurance that the procedure can achieve its intended result(s),
Achieve improvement.
A Initial issue