1. Introduction
1.1. Background
1. The Board at its thirty-fifth meeting requested the secretariat to consolidate all guidance
into one document, regarding the determination of the occurrence of debundling
including Appendix C of the simplified modalities and procedures for small-scale CDM
project activities, PoA debundling guidance, the guidance on mobile boundaries and
debunding guidance for Type I methodologies (EB 30 paragraph 37) and in doing so to
supplement this with a diagrammatic representation of the procedure.
1.2. Objectives
2. This methodological tool provides a step-wise approach for the determination of the
occurrence of debundling for small-scale project activities and small-scale component
project activities (CPA).
2.2. Applicability
4. This methodological tool is applicable to proposed small-scale project activities and
small-scale CPAs in order to check whether they are debundled components of large-
scale project activities.
3. Normative references
6. This methodological tool refers to the following documents: Indicative simplified baseline
and monitoring methodologies for selected small-scale CDM project activity categories
(contained in annex II to decision 21/CP.8, see document FCCC/CP/2002/7/Add.3).
4. Definitions
7. The definitions contained in the Glossary of CDM terms shall apply.
8. Debundling is defined as the fragmentation of a large project activity into smaller parts. A
small-scale project activity that is part of a large project activity is not eligible to use the
simplified modalities and procedures for small-scale CDM project activities. The full
3 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
project activity or any component of the full project activity shall follow the regular CDM
modalities and procedures.
5. Methodology procedure
5.1. Determining the occurrence of debundling
9. A proposed small-scale project activity shall be deemed to be a debundled component of
a large project activity if there is a registered small-scale CDM project activity or an
application to register another small-scale CDM project activity:
(a) With the same project participants;
(b) In the same project category and technology/measure; and
(c) Registered within the previous 2 years; and
(d) Whose project boundary is within 1 km of the project boundary of the proposed
small- scale activity at the closest point.
10. If a proposed small-scale project activity is deemed to be a debundled component in
accordance with paragraph 2 above, but total size of such an activity combined with the
previous registered small-scale CDM project activity does not exceed the limits for small-
scale CDM project activities as set in paragraph 6 (c) of the decision 17/CP.7,1 the
project activity can qualify to use simplified modalities and procedures for small-scale
CDM project activities.
1
Limits have been revised as set in paragraph 28 of decision 1/CMP.2.
4 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
2
Only those POAs need to be considered in determining de-bundling that are: (i) in the same
geographical area; and (ii) use the same methodology; as the POA to which proposed CPA is being
added.
3
Which may be a (i) registered small-scale CPA of a PoA, (ii) an application to register another small-
scale CPA of a PoA or (iii) another registered CDM project activity.
4
Limits have been revised as set in paragraph 28 of decision 1/CMP.2.
5 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
17. If each of the independent subsystems/measures (e.g., biogas digester, solar home
system) included in the CPA of a PoA is no larger than 1% of the small-scale thresholds
defined by the methodology applied,5 then that CPA of PoA is exempted from performing
de-bundling check i.e., considering as not being a de-bundled component of a large
scale activity.
5
i.e., 15 kW installed capacity or 0.6 GWh annual energy savings or o.6 ktCO2e annual emission
reductions.
6 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
Start
* In the context of this diagram:
- SSC PA stands for “a Small Scale CDM Project Activity”
- A “registered SSC PA” also includes a SSC PA which applied for
registration
No
No
The proposed SSC PA is The proposed SSC PA is The proposed SSC PA is
deemed to be a debundled deemed to be a debundled not deemed to be a
component of a large component of a large debundled component of a
project activity and is not project activity but can large project activity,
eligible to use the simplified qualify to use simplified therefore is eligible to use
modalities and procedures modalities and procedures the simplified modalities
for SSC PAs. for SSC PAs. and procedures for SSC
PAs.
7 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
Start
* In the context of this diagram:
- Reference to POAs is to those PoAs that are: (i) in the same
geographical area; and (ii) use the same methodology as the POA to
which proposed CPA is being added
- An ‘activity’ is a (i) registered small-scale CPA of a PoA, or (ii) an
application to register another small-scale CPA of a PoA or (iii) another
registered CDM project activity
Yes
Yes
Does the total size of the proposed small scale
CPA combined with the activity exceed the
limits for small scale PAs as set out in
Yes decision 4/CMP.1 and revised in 1/CMP.2 (for
energy) and 5/CMP.1 (for A/R) respectively?
No
The proposed small scale The proposed small scale The proposed small scale
CPA is deemed to be a CPA of PoA is deemed to be CPA of a PoA is not deemed
debundled component of a a debundled component of to be a debundled
large-scale activity and is a large-scale activity but component of a large-scale
not eligible to use the can qualify to use the activity, therefore is eligible
simplified modalities and simplified modalities and to use the simplified
procedures for small-scale procedures for small-scale modalities and procedures
project activities. project activities. for small-scale project
activities.
8 of 9
TOOL20
Methodological tool: Assessment of debundling for small-scale project activities
Version 04.0
-----
Document information
9 of 9