0% found this document useful (0 votes)
11 views

BC 334

This document is a core drill report containing information about pavement samples taken for a transportation project. It includes the location, date, thickness measurements, and type of material cored for each sample. Remarks are also noted. The report contains multiple sections and sheets to document core samples from different areas of the project.

Uploaded by

TYO WIBOWO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

BC 334

This document is a core drill report containing information about pavement samples taken for a transportation project. It includes the location, date, thickness measurements, and type of material cored for each sample. Remarks are also noted. The report contains multiple sections and sheets to document core samples from different areas of the project.

Uploaded by

TYO WIBOWO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

County

Section
Sheet of sheets
Core Drill Report Route
Final Samples District
District
Contract No.
Contractor Job No.

Project

Dates cored to

City Route or Street location

Type: PCC PCC PCC STAB


CRCP PVT BIT.BC BIT.BCW SHLDRS WIDTH

Date Location Thickness of Core


Core No. Cored Station L C R Plan Core Measurements Ave. Remarks

Note: All stabilized shoulder core locations are measured


from edge of pavement.
Core Drill Operator

Printed 1/29/2019 BC 334 (Rev. 4/98)