0% found this document useful (1 vote)
499 views

ERT Chart

The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.

Uploaded by

Nabil Mazelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
499 views

ERT Chart

The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.

Uploaded by

Nabil Mazelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

HG Power Transmission Sdn. Bhd.

Client : Tenaga Nasional Berhad Date : 01/10/2018


Contract Title 500kV Double Circuit Transmission Line from PMU Bentong South to PMU Lenggeng (Point L to
: LGNG) and 275kV Double Circuit Transmission Line from PMU Lenggeng to PMU Mahkota Cheras Page : 1 Of 1
(Point L to Lenggeng)
Doc.
Contract No : TNB 369/2018 : ERT/01/REV1
No.
EMERGENCY RESPONSE TEAM
Organization Chart

EMERGENCY COMMANDER

FIRE RESPONDER FIRST AIDER EMERGENCY EVACUATION

Muhamad Nabil Mazelan


017-6971799

Rev.03

You might also like