The production schedule outlines filming over 4 weeks in January and February, including primary and secondary research the first week, planning and script writing the second week, recording foley sounds on campus the third week, recording the script in the college studio the fourth week, and editing and evaluating the production the following week.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
57 views1 page
Production Schedule 1
The production schedule outlines filming over 4 weeks in January and February, including primary and secondary research the first week, planning and script writing the second week, recording foley sounds on campus the third week, recording the script in the college studio the fourth week, and editing and evaluating the production the following week.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Production Schedule
Please include location, time of film, what you are filming and team members including actors
Date Plan of action Evaluation / behind
Week beginning the scenes 7th Jan Primary and secondary research- surveys 14th Jan Planning- exposition, conflict, resolution. Character development, script writing, music. 17th Jan Record foley sounds Inside college 29th Jan Record script In studio at college 30th Jan Edit production 1st Feb Evaluation