Plan of Development
Plan of Development
DEVELOPMENT
CANOPUS FIELD
23 FEBRUARY 2018
JOVIAN OIL
COMPANY
F O U N D E D O N 2 0 D E C E M B E R 2 0 1 7
J A L A N K Y A I T A P A N O . 1 ,
R T . 6 / R W . 1 6 , T O M A N G , G R O G O L
P E T A M B U R A N , R T . 6 / R W . 1 6 , T O M A N G ,
G R O G O L P E T A M B U R A N , K O T A
J A K A R T A B A R A T , D A E R A H K H U S U S
I B U K O T A J A K A R T A 1 1 4 4 0
( 0 2 1 ) 5 6 6 3 2 3 2
J O V I A N O I L C O M P A N Y @ G M A I L . C O M
MOTTO
temprature of 142,552
fahrenheit.
FORECAST
C A N O P U S F I E L D
Drilling
Target
Casing Program
Mud program
Drilling Time
Drilling Time
PRODUCTION
FACILITIES
Oil will be drained from reservoir, streamed to platform to
the oil.
reciprocating compressors.
J O V I A N O I L C O M P A N Y
JOVIAN OIL COMPANY
ECO-FRIENDLY
SAFETY
COMMITMENT
HSE IS PRIORITY
MINIMIZING RISK AND HAZARD TO PREVENT
ACCIDENT
CREATING HARMONIZATION WITH STAKEHOLDERS
TO BUILD A GOOD RELATIONSHIP AMONG US
INCREASE AWARENESS IN ORDER TO CARRY OUT THE
WORK SAFELY
ENVIRONMENTAL
IMPACT ANALYSIS
Waste Management
Regulation
CSR
and soil pollution and contamination.
Protect community against endemic disease
Ensure availability and sustainable management of water and sanitation for all
Upgrade infrastructure and technology to make them sustainable
Giving donation and support in order to reducing environmental impacts
POD Submission
POD Approval
Environment Permission
Workover
Production Facilities
CREATIVE WRITING 101
Onstream
JOVIAN OIL COMPANY • IPFEST2018
copany
il
jovian o
LOCAL
CONTENT
The use of domestic product
Goods – 30%
Services -30%
EPC (Engineering Procurement
Construction Installation) – 40%
POD• IPFEST2018
PSC GROSS SPLIT
POD IPFEST2018
CONCLUSION
Reservoir has a pressure of 2585 psia with a reservoir temperature of 142oF and has a type of fluid Black Oil with the
mechanism of the form of Gas Cap Drive.
The addition of 7 wells is sufficient to develop the Canopus field economically with 1 platform.
The production rate of wells in the Canopus field varies with net pay. In the existing well the production capacity of C
well is 4747 STB / day, A well is 631 STB / day, and well F is 2174 STB / day
Production rates of existing wells and infill wells have been optimized by lowering Pwf to increase pressure gradient
and increase production rate. Recovery Factor from selected scenario, scenario 2 is 10.9%
The addition of 7 wells is considered sufficient to develop the Canopus field economically with 1 platform
On the Canopus field, there are no plans to add production facilities or other activities that are endeavored to extend oil
wells. Because at the next stage will be planned development of gas field.
Scenario 2 is a selected scenario from 4 scenarios that exist with consideration of data accuracy and high confidence in
the success of 4 infill wells. At a later stage of development where better data are available, consideration will be given
to adding infill wells and conversion of oil reservoirs to gas reservoirs.
Some safety rules that must be maintained include hygiene and regularity, the presence of personal protective
equipment, good handling of chemicals, fire, and keep from noise
Environmental impacts arising from exploration and exploitation activities are liquid, solid, and gaseous waste
Need to hold ASR at the end of closing of activities to return it to its original condition
Scenario 2 gives the best result with the value of NPV 10%, 147 MMUSD, IRR 52% and pay out time 3 years.
Price indicator has high sensitivity compared to others.