Time Schedule

The document outlines a time schedule for a landscaping project with the following key details: 1) The project involves developing green open spaces in Kayu Aro, Solok over 45 calendar days spanning 2 months. 2) The work includes land clearing, grass seeding, drainage works, and retaining walls. 3) A Gantt chart schedules each work item over the 45 day period, assigning percentages of work to be completed each week.

Uploaded by

crb.group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
40 views

Time Schedule

The document outlines a time schedule for a landscaping project with the following key details: 1) The project involves developing green open spaces in Kayu Aro, Solok over 45 calendar days spanning 2 months. 2) The work includes land clearing, grass seeding, drainage works, and retaining walls. 3) A Gantt chart schedules each work item over the 45 day period, assigning percentages of work to be completed each week.

Uploaded by

crb.group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 1

TIME SCHEDULE (JADWAL WAKTU PELAKSANAAN)

PROGRAM : Pemanfaatan Ruang


KEGIATAN : Pengelolaan Ruang Terbuka Hijau
PEKERJAAN : Pembangunan THKW
LOKASI : Kayu Aro Kab. Solok
T.A. : 2.018,00

JANGKA WAKTU PELAKSANAAN 45 (SEMBILAN PULUH) HARI KALENDER


NO. URAIAN PEKERJAAN SAT VOLUME BOBOT BULAN I (30 hari) BULAN I (17 hari) KET
MINGGU 1 MINGGU KE 2 MINGGU KE 3 MINGGU KE 4 MINGGU KE 5 MINGGU KE 6 MINGGU 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

I Pembangunan Camping Ground, Land Clearing dan Gebalan Rumput

1 Pekerjaan Pendahuluan
100

1,1 Plank Kegiatan Ls 1,00 0,043 0,021 0,021

1,2 Pengukuran Ulang Ls 1,00 0,051 0,013 0,013 0,013 0,013

2 Pekerjaan Pembersihan dan Perataan

2,1 Land Clearing m2 53.930,30 17,592 0,528 0,545 0,563 0,581 0,598 0,616 0,633 0,651 0,669 0,686 0,704 0,721 0,739 0,756 0,774 0,792 0,809 0,827 0,844 0,862 0,880 0,897 0,915 0,932 0,070

3 Pekerjaan Gebalan Rumput

3,1 Gebalan Rumput m2 53.930,30 26,625 0,799 0,825 0,852 0,879 0,905 0,932 0,959 0,985 1,012 1,038 1,065 1,092 1,118 1,145 1,172 1,198 1,225 1,251 1,278 1,305 1,331 1,358 1,385 1,411 0,107

II Pekerjaan Drainase dan Tembok Penahan

1 Pekerjaan Pendahuluan

1,1 Pasang Plank Proyek Ls 1,00 0,043 0,043

1,2 Job Mix Formula Beton K-225 Ls 1,00 0,007 0,007

1,3 Tes Uji Kubus Bh 2,00 0,001 0,000 0,000 0,000

1,4 Core Drill Titik 5,00 0,004 0,002 0,002 070

RENCANA PELAKSANAAN PROPOSION HAND OVER (PHO)


1,5 Pembersihan Lapangan M2 450,00 0,123 0,025 0,025 0,025 0,025 0,025

1,6 Pasang Bowplank M1 63,00 0,078 0,026 0,026 0,026

2 Pekerjaan Drainase

2,1 Pekerjaan Galian Tanah M3 461,70 0,582 0,030 0,037 0,042 0,049 0,054 0,058 0,061 0,067 0,071 0,076 0,038

2,2 Pasang Batu Kali, Camp. 1 : 4 M3 551,37 6,650 0,102 0,108 0,116 0,124 0,130 0,135 0,141 0,213 0,217 0,226 0,230 0,233 0,236 0,239 0,241 0,244 0,247 0,250 0,252 0,254 0,257 0,259 0,261 0,263 0,267 0,270 0,279 0,315 0,543

2,3 Pekerjaan Plasteran Camp, 1 : 4 ( Tebal 2 Cm ) M3 1.426,44 2,000 0,040 0,042 0,044 0,046 0,048 0,050 0,052 0,054 0,056 0,058 0,060 0,062 0,064 0,066 0,070 0,072 0,074 0,076 0,078 0,080 0,082 0,084 0,086 0,088 0,090 0,092 0,094 0,096 0,096

3 Pekerjaan Tembok Penahan

3,1 Pekerjaan Galian Tanah (Sedalam 1 m) M3 359,42 0,4530 0,024 0,025 0,029 0,035 0,037 0,042 0,045 0,046 0,047 0,048 0,050 0,025

3,2 Pekerjaan Galian Tanah (Sedalam 2 m) M3 213,86 0,331 0,015 0,018 0,019 0,024 0,029 0,031 0,034 0,038 0,039 0,043 0,042

3,3 Pasang Batu Kali, Camp. 1 : 4 M3 450,97 5,439 0,159 0,164 0,166 0,170 0,172 0,175 0,177 0,178 0,180 0,182 0,180 0,181 0,184 0,187 0,190 0,193 0,198 0,203 0,206 0,213 0,224 0,239 0,246 0,264 0,273 0,275 0,260

3,4 Pekerjaan Plasteran Camp, 1 : 4 ( Tebal 2 Cm ) M3 578,24 0,811 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032

040
3,5 Pasang Pipa PVC 2" M1 50,00 0,072 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003

3,6 Pekerjaan Lantai Kerja Beton K - 125 M3 27,39 0,410 0,006 0,007 0,008 0,010 0,013 0,016 0,019 0,021 0,022 0,021 0,023 0,024 0,025 0,027 0,028 0,029 0,031 0,031 0,033 0,018

3,7 Pekerjaan Lantai Beton K - 225 M3 82,16 1,394 0,070 0,078 0,082 0,084 0,091 0,092 0,095 0,096 0,098 0,099 0,085 0,088 0,091 0,093 0,096 0,056

4 Pekerjaan Plat Duecker

4,1 Pekerjaan Galian Tanah M3 10,80 0,014 0,007 0,007

4,2 Pasang Batu Kali, Camp. 1 : 4 M3 9,24 0,111 0,056 0,056

4,3 Pekerjaan Pembesian Kg 674,24 0,177 0,059 0,059 0,059

4,4 Pekerjaan Bakisting Plat Duiker M2 15,93 0,077 0,038 0,038

4,5 Pekerjaan Beton K - 225 M3 1,90 0,032 0,032

4,6 Pekerjaan Plasteran Camp, 1 : 4 ( Tebal 2 Cm ) M3 22,80 0,032 0,016 0,016

4,7 Pasang Grill Saluran Bh 2,00 0,009 0,009

4,8 Pengadaan Rumah Pelindung Bh 1,00 0,086 0,086


010

4,9 Pengadaan Pintu Angkat Tekan Bh 1,00 0,086 0,086

III Pembangunan Tempat Parkir

1 Pekerjaan Pendahuluan

1,1 Job Mix Beton Ls 1,00 0,007 0,007

1,2 Tes Kubus Ls 20,00 0,009 0,003 0,003 0,003

1,3 Pengukuran Ulang Ls 1,00 0,086 0,029 0,029 0,029

2 Pekerjaan Tanah

2,1 Timbunan Area Parkir dengan Timbunan Pilihan m3 500,00 1,856 0,085 0,093 0,123 0,146 0,162 0,169 0,174 0,176 0,179 0,181 0,185 0,182

3 Pekerjaan Struktur

3,1 Pek. Pasangan Paving Block (Cisankan) Tebal 8 m2 3.800,00 20,192 0,630 0,642 0,656 0,664 0,672 0,676 0,678 0,685 0,689 0,695 0,699 0,717 0,727 0,735 0,745 0,753 0,761 0,775 0,779 0,792 0,804 0,828 0,838 0,844 0,858 0,874 0,886 0,090

3,2 Pek. Pasangan Paving Block (Cisankan) Tebal 6 m2 2.600,00 12,785 0,499 0,511 0,518 0,524 0,537 0,543 0,550 0,555 0,556 0,557 0,559 0,560 0,561 0,563 0,564 0,565 0,566 0,568 0,569 0,570 0,571 0,573 0,574 0,072

3,3 Coran Pengunci Beton K-175 m3 99,50 1,731 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 0,075 -020

JUMLAH RENCANA 100,00 0,059 0,102 0,580 0,668 0,683 0,732 0,770 0,834 0,863 0,892 1,070 1,273 1,314 1,391 2,863 2,871 2,980 3,018 3,492 3,599 3,622 3,684 3,828 3,906 3,978 4,062 3,255 3,234 3,289 3,319 3,307 3,366 3,405 3,457 3,525 3,621 3,672 3,688 2,250 1,522 1,536 0,239 0,181 - -

K0MULATIF RENCANA 0,00 0,06 0,16 0,74 1,41 2,09 2,82 3,59 4,43 5,29 6,18 7,25 8,53 9,84 11,23 14,09 16,97 19,95 22,96 26,45 30,05 33,68 37,36 41,19 45,09 49,07 53,13 56,39 59,62 62,91 66,23 69,54 72,90 76,31 79,77 83,29 86,91 90,58 94,27 96,52 98,04 99,58 99,82 100,0 100,0 100,0

0,10 0,58 0,67 0,68 0,73 0,77 0,83 0,86 0,89 1,07 1,27 1,31 1,39 2,86 2,87 2,98 3,02 3,49 3,60 3,62 3,68 3,83 3,91 3,98 4,06 3,26 3,23 3,29 3,32 3,31 3,37 3,41 3,46 3,52 3,62 3,67 3,69 2,25 1,52 1,54 0,24 0,18 0,00 0,00
Makassar, 30 Oktober 2018
Dibuat Oleh :
PT. MARI BANGUN PERSADA SPESIALIS

Abdul Gaffar, SE
Direktur