Institute of Technology
Faculty of Civil and Environmental Engineering
Department of Water supply & Environmental
Engineering (PG)
Waste Water Assignment
on
Sedimentation of Column settling test
By: Ashenafi Zinabie
ID no. GSR/1340/08
Procedure:
Procedure:
1. Suspension to be tested is placed in the column
Mixed completely to ensure uniform distribution of particles
3. At time=0, a portion of the sample is in order to determine the initial TSS
concentration
4. The suspension is allowed to settle
5. At periodic time intervals, samples are removed through the ports located in
different heights.
For each sample withdrawn at each depth and for each time,
TSS analysis must be performed in order to determine the fraction remaining in
suspension at each time interval
6. Percent removals Xij= mass fraction removed (at ith depth at jth time interval) =
(1- Cij/C0) x 100
References:
1. Environmental Engineering Unit Operations, by Assist. Prof. Bilge Alpaslan Kocamemi
Marmara University Department of Environmental Engineering Istanbul, Turkey
2. Design Manual for Onsite Wastewater Treatment Systems March 22, 2010 Edition,
Environmental and public health through leadership, partnership and science.
3. Water Supply and Environmental Engineering Department Wastewater Treatment
1. Systems Module.
4. Water supply and sanitary Engineering, by Gurcharan Singh
5. Water work engineering Planning, Design and Operation. Syed R. Qasim. Edward M.
Motley Guang Zhu.