Slide: Slope Stability Verification Manual
Slide: Slope Stability Verification Manual
Slope Stability
Verification Manual
Part I
PART ONE
INTRODUCTION 7
2
SLIDE VERIFICATION PROBLEM #29 101
Probabilistic analysis, linearly varying cohesion, underwater slope, reliability index
3
PART TWO
4
SLIDE VERIFICATION PROBLEM #54 167
Stabilizing piles, reinforced vs. unreinforced slope
5
SLIDE VERIFICATION PROBLEM #68 202
Three layered slope, undrained, given slip surface
REFERENCES 210
6
Introduction
This document contains a series of verification slope stability problems that have been analyzed
using SLIDE version 5.0. These verification tests come from:
• A set of 5 basic slope stability problems, together with 5 variants, was distributed in the
Australian Geomechanics profession and overseas as part of a survey sponsored by ACADS
(Association for Computer Aided Design), in 1988. The SLIDE verification problems #1 to
#10 are based on these ACADS example problems (Giam & Donald (1989)).
• Published examples found in reference material such as journal and conference proceedings.
For all examples, a short statement of the problem is given first, followed by a presentation of the
analysis results, using various limit equilibrium analysis methods. Full references cited in the
verification tests are found at the end of this document.
The SLIDE verification files can be found in the Examples > Verification folder in your SLIDE
installation folder. The file names are verification#1.sli, verification#2.sli etc, corresponding to
the verification problem numbers in this document.
All verification files run with the Slide Demo, so if you want details which are not presented in
this document, then download the demo to view all the input parameters and results.
7
SLIDE Verification Problem #1
1.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 1(a) problem.
A slip center search grid of 20 x 20 intervals was used, with 11 circles per gridpoint,
generating a total of 4851 circular slip surfaces. Grid is located at (22.8, 62.6), (22.8,42.3),
(43.7,62.6), (43.7,42.3). Tolerance is 0.0001.
(50,35) (70,35)
(20,25)
(30,25)
(20,20) (70,20)
Figure 1
8
1.4 Results
9
Figure 1.4.2 – Solution Using the Spencer Method
10
Figure 1.4.4 – Solution Using the Janbu Corrected Method
11
SLIDE Verification Problem #2
2.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 1(b) problem.
2c 1 − sin φ
Depth = , ka =
γ ka 1 + sin φ
In order to locate the critical slip surfaces, a slip center search grid of 20 x 20 intervals was
used, with 11 circles per gridpoint, generating a total of 4851 slip surfaces. Grid located at
(31,49), (47,49), (31,34), (47,34). Tolerance is 0.0001.
Figure 2
12
2.4 Results
13
Figure 2.4.2 – Solution Using the Spencer Method
14
Figure 2.4.4 – Solution Using the Janbu Corrected Method
15
SLIDE Verification Problem #3
3.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 1(c) problem.
A slip center search grid of 20 x 20 intervals was used, with 11 circles per gridpoint,
generating a total of 4851 slip surfaces.
(50,35) (70,35)
(50,29) soil #2
(20,25)
(40,27)
(30,25) (52,24) (70,24)
soil #3
(20,20) (70,20)
Figure 3
16
3.4 Results
17
Figure 3.4.2 – Solution Using the Spencer Method
18
Figure 3.4.4 – Solution Using the Janbu Corrected Method
19
SLIDE Verification Problem #4
4.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 1(d) problem.
(50,35) (70,35)
(50,29) soil #2
(20,25)
(40,27)
(30,25) (52,24) (70,24)
soil #3
(20,20) (70,20)
Figure 4
20
4.4 Results
21
Figure 4.4.2 – Solution Using the Spencer Method
22
Figure 4.4.4 – Solution Using the Janbu Corrected Method
23
SLIDE Verification Problem #5
5.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 2(a) problem.
2 3 4 5
21 24
16 18 20 23 26
Rockfill Core
7
6 9 Filter (very thin
seam)
8
Transitions
10 11
1 12 13
15 17 19 22 25 14
Figure 5
24
5.4 Results
NOTE: the minimum safety factor surfaces in this case, correspond to shallow, translational
slides parallel to the slope surface.
25
Figure 5.4.2 – Solution Using the Spencer Method
26
Figure 5.4.4 – Solution Using the Janbu Corrected Method
27
SLIDE Verification Problem #6
6.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 2(b) problem.
6.3 Geometry
Figure 6
28
6.4 Results
29
Figure 6.4.2 – Solution Using the Spencer Method
30
Figure 6.4.4 – Solution Using the Janbu Corrected Method
31
SLIDE Verification Problem #7
7.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 3(a) problem.
(67.5,40) (84,40)
Soil #2 (seam)
Soil #1
(20,20) (84,20)
Figure 7
32
7.4 Results
33
Figure 7.4.2 – Solution Using the GLE Method
34
SLIDE Verification Problem #8
8.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 3(b) problem.
(67.5,40) (84,40)
Soil #1
(20,20) (84,20)
Figure 8
X (m) Y (m)
41.85 27.75
44.00 26.50
63.50 27.00
73.31 40.00
35
8.4 Results
36
Figure 8.4.2 – Solution Using the GLE Method
37
SLIDE Verification Problem #9
9.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 4 problem.
A block search for the critical non-circular failure surface was carried out by defining a block
search polyline object within the weak layer, and variable projection angles from the weak
layer to the slope surface. A total of 5000 random surfaces were generated by the search. The
results are compared with optimization results.
38
Table 9.2: External Loadings
Figure 9
39
9.4 Results – no optimization
40
Figure 9.4.2 – Solution Using the GLE Method
41
9.5 Results – Block search with optimization
42
SLIDE Verification Problem #10
10.1 Introduction
In 1988 a set of 5 basic slope stability problems, together with 5 variants, was distributed
both in the Australian Geomechanics profession and overseas as part of a survey sponsored
by ACADS (Giam & Donald (1989)). This is the ACADS 5 problem.
Excavation
Grid used to draw waterline (which comes from Figure 10(b)) is identical to the data used in
tutorial 5 (tutorial5.sli). The data can be imported from tutorial5.sli or verification#10.sli.
43
Figure 10(b)
10.4 Results
44
Figure 10.4.2 – Solution Using the Spencer Method
45
Figure 10.4.4 – Solution Using the Janbu Corrected Method
46
SLIDE Verification Problem #11
11.1 Introduction
This problem is an analysis of the Saint-Alban embankment (in Quebec) which was built and
induced to failure for testing and research purposes in 1972 (Pilot et.al, 1982).
(0,12) (8,12)
Material Barrier (0,8), (14,8)
Embankment
Figure 11
47
11.4 Results
48
Figure 11.4.2 – Solution Using the Spencer Method
49
Figure 11.4.4 – Solution Using the Janbu Corrected Method
50
SLIDE Verification Problem #12
12.1 Introduction
This problem is an analysis of the Lanester embankment (in France) which was built and
induced to failure for testing and research purposes in 1969 (Pilot et.al, 1982).
Pt.# Xc (m) Yc (m) u (kPa) Pt.# Xc (m) Yc (m) U (kPa) Pt.# Xc (m) Yc (m) u (kPa)
1 26.5 9 20 9 16 8.5 60 17 31.5 3 80
2 31.5 8.5 20 10 21 8.2 60 18 10.5 6 100
3 10.5 9.3 40 11 26.5 6 60 19 16 5 100
4 16 9.3 40 12 31.5 5 60 20 21 4.5 100
5 21 9.3 40 13 10.5 7.5 80 21 26 2.5 100
6 26.5 7.5 40 14 16 7.5 80 22 31.5 1.3 100
7 31.5 6.8 40 15 21 5.6 80 23 - - -
8 10.5 8.5 60 16 26 4.2 80 24 - - -
Note: Tension crack depth (hatched region in diagram) is 4 m.
(0,14) (20,14)
Embankment
Sandy Clay 21 17
22
(0,1.3) (10,1) (26,1) (31.5,1.3) (40,1.3)
Figure 12.1 - Geometry
51
12.4 Results
52
Figure 12.4.2 – Solution Using the Spencer Method
53
Figure 12.4.4 – Solution Using the Janbu Corrected Method
54
SLIDE Verification Problem #13
13.1 Introduction
This problem is an analysis of the Cubzac-les-Ponts embankment (in France) which was built
and induced to failure for testing and research purposes in 1974 (Pilot et.al, 1982).
Pt.# Xc (m) Yc (m) u (kPa) Pt.# Xc (m) Yc (m) u (kPa) Pt.# Xc (m) Yc (m) u (kPa)
1 11.5 4.5 125 16 16 7.2 25 31 24.5 7.2 25
2 11.5 5.3 100 17 18 2.3 125 32 27 3.1 100
3 11.5 6.8 50 18 18 5.3 100 33 27 6.1 50
4 11.5 7.2 25 19 18 6.8 50 34 27 7.2 25
5 12.75 3.35 125 20 18 7.2 25 35 29.75 1.55 100
6 12.75 5.2 100 21 20 1.15 125 36 29.75 5.55 50
7 12.75 6.8 50 22 20 4.85 100 37 29.75 7.2 25
8 12.75 7.2 25 23 20 6.8 50 38 32.5 0 100
9 14 2.3 125 24 20 7.2 25 39 32.5 5 50
10 14 5.1 100 25 22 0 125 40 32.5 7.2 25
11 14 6.8 50 26 22 4.4 100 41 37.25 4.7 50
12 14 7.2 25 27 22 6.8 50 42 37.25 6.85 25
13 16 2.3 125 28 22 7.2 25 43 42 4.4 50
14 16 5.2 100 29 24.5 3.75 100 44 42 6.5 25
15 16 6.8 50 30 24.5 6.45 50 45 - - -
55
(0,13.5) (20,13.5)
Embankment
(0,9) (26.5,9) (44,9)
(0,8) 4 8 12 16 20 24 28 31 (44,8)
(0,6) Upper Clay 3 7 11 15 19 23 27 34 37 40 42 44
2 6 10 14 18 30 33 36 (44,6)
1 22 26 39 41 43
Lower Clay 5 29 32
9 13 17
21 25 35 38
Figure 13
13.4 Results
56
Figure 13.4.1 – Solution Using the Bishop Method
57
Figure 13.4.3 – Solution Using the GLE Method
58
SLIDE Verification Problem #14
14.1 Introduction
This model is taken from Arai and Tagyo (1985) example#1 and consists of a simple slope of
homogeneous soil with zero pore pressure.
59
14.4 Circular Results – using auto refine search
60
14.5 Noncircular Results – using Path search with Optimization
61
SLIDE Verification Problem #15
15.1 Introduction
This model is taken from Arai and Tagyo (1985) example#2 and consists of a layered slope
where a layer of low resistance is interposed between two layers of higher strength. A number
of other authors have also analyzed this problem, notably Kim et al. (2002), Malkawi et al.
(2001), and Greco (1996).
62
15.4 Circular Results – using auto refine search
63
15.5 Noncircular Results – using Random search with Optimization (1000 surfaces)
Figure 15.3 – Noncircular failure surface using Spencers method and random search
64
SLIDE Verification Problem #16
16.1 Introduction
This model is taken from Arai and Tagyo (1985) example#3 and consists of a simple slope of
homogeneous soil with pore pressure.
65
16.4 Circular Results – using auto refine search
66
16.5 Noncircular Results – using Random search with Monte-Carlo optimization
67
SLIDE Verification Problem #17
17.1 Introduction
This model is taken from Yamagami and Ueta (1988) and consists of a simple slope of
homogeneous soil with zero pore pressure. Greco (1996) has also analyzed this slope.
68
17.4 Circular Results – using auto refine search
69
17.5 Noncircular Results – using Random search with Monte-Carlo optimization
70
SLIDE Verification Problem #18
18.1 Introduction
This model is taken from Baker (1980) and was originally published by Spencer (1969). It
consists of a simple slope of homogeneous soil with pore pressure.
71
18.4 Noncircular Results – using Random search with Monte-Carlo optimization
72
SLIDE Verification Problem #19
19.1 Introduction
This model is taken from Greco (1996) example #4 and was originally published by
Yamagami and Ueta (1988). It consists of a layered slope without pore pressure.
73
19.4 Noncircular Results – using Random search with Monte-Carlo optimization, convex
surfaces only.
74
SLIDE Verification Problem #20
20.1 Introduction
This model is taken from Greco (1996) example #5 and was originally published by Chen and
Shao (1988). It consists of a layered slope with pore pressure and a weak seam.
75
20.4 Circular Results – using grid search and a focus object at the toe (40x40 grid)
Greco (1996) Spencer factor of safety for nearly circular local critical surface = 1.08
76
20.5 Noncircular Results – using Block search polyline in the weak seam and Monte-Carlo
optimization
Figure 20.4 – Noncircular failure surface using spencer method and block search
77
SLIDE Verification Problem #21
21.1 Introduction
This model is taken from Fredlund and Krahn (1977). It consists of a homogeneous slope
with three separate water conditions, 1) dry, 2) Ru defined pore pressure, 3) pore pressures
defined using a water table. The model is done in imperial units to be consistent with the
original paper. Quite a few other authors, such as Baker (1980), Greco (1996), and Malkawi
(2001) have also analyzed this slope.
78
SLIDE Verification Problem #22
22.1 Introduction
This model is taken from Fredlund and Krahn (1977). It consists of a slope with a weak layer
and three separate water conditions, 1) dry, 2) Ru defined pore pressure, 3) pore pressures
defined using a water table. The model is done in imperial units to be consistent with the
original paper. Quite a few other authors, such as Kim and Salgado (2002), Baker (1980), and
Zhu, Lee, and Jiang (2003) have also analyzed this slope. Unfortunately, the location of the
weak layer is slightly different in all the above references. Since the results are quite sensitive
to this location, results routinely vary in the second decimal place.
79
22.3 Composite Circular Results - SLIDE
Method Case 1: Case 2: Case 3:
Dry Ru WT
Ordinary 1.300 1.039 1.174
Bishop Simplified 1.382 1.124 1.243
Spencer 1.382 1.124 1.244
GLE/Morgenstern-Price 1.372 1.114 1.237
80
SLIDE Verification Problem #23
23.1 Introduction
This model is taken from Low (1989). It consists of a slope overlaying two soil layers.
81
22.3 Circular Results – Auto refine search
Method Factor of Safety Low (1989) Ordinary Factor of Safety=1.36
Ordinary 1.370 Low (1989) Bishop Factor of Safety=1.14
Bishop 1.192 Kim (2002) Factor of Safety=1.17
82
SLIDE Verification Problem #24
24.1 Introduction
This model is taken from Low (1989). It consists of a slope with three layers with different
undrained shear strengths.
83
24.3 Circular Results – auto refine search
84
SLIDE Verification Problem #25
25.1 Introduction
This model is taken from Chen and Shao (1988). It analyses the classical problem in the
theory of plasticity of a weightless, frictionless slope subjected to a vertical load. This
problem was first solved by Prandtl (1921)
x F(x)
0 1
0.3 1
0.6 0
1.0 0
85
25.2 – Geometry modeled using Slide
25.4 Results
86
SLIDE Verification Problem #26
26.1 Introduction
This verification test models the well-known Prandtl solution of bearing capacity:
qc=2C(1+π/2)
26.4 Results
87
SLIDE Verification Problem #27
27.1 Introduction
This model was taken from Malkawi, Hassan and Sarma (2001) who took it from the
XSTABL version 5 reference manual (Sharma 1996). It consists of a 2 material slope
overlaying undulating bedrock. There is a water table and moist and saturated unit weights
for one of the materials. The other material has zero strength. The model is done with
imperial units (feet,psf,pcf) to be consistent with the original XSTABL analysis.
27.1 – Geometry
88
27.4 Analysis 1 Circular Results – single center @ xc=59.52,yc=219.21,radius=157.68
Method SLIDE
Bishop 1.376
Janbu Corrected 1.345
Corp. Engineers 1 1.394
Corp. Engineers 2 1.396
Lowe & Karafiath 1.392
Spencer 1.382
GLE/M-P (half-sine) 1.378
Malkawi, Hassan and Sarma (2001), in comparing with XSTABL, quote a minimum Janbu factor of safety
of 1.255 with the center and radius equal to x,y,r=62.63,160.96,101.02. However it is questionable whether
this is the corrected Janbu or the uncorrected. It is also questionable whether they used the correct pore
pressure distribution. If in Slide, you use a static pore pressure distribution and uncorrected simplified
Janbu, you get a factor of safety of 1.254 (x,y,r=62.53,161.79,101.78) which is almost exactly what
Malkawi, Hassan and Sarma calculated.
A 11 foot tension crack is added to the analysis, replacing soil 2. The tension crack is dry. The
Spencer results are shown in figure 27.2.
89
27.2 – Analysis 3 results for Spencers method
The 11 foot tension crack added in analysis 3 is now partially filled with 6 feet of water.
90
SLIDE Verification Problem #28
28.1 Introduction
The set of models in this verification problem were taken from Chowdhury and Xu (1995).
The geometry for the first four examples comes from the well-known Congress St. Cut
model, first analyzed by Ireland (1954). All the examples in this verification evaluate the
probability of failure of slopes given the means and standard deviations of some specified
input parameters.
91
Sand
Clay 1
Clay 2
Clay 3
28.4 Example 1
Input Data
(The three clay layers are assumed frictionless.)
Soil Layer
Clay 1 Clay 2 Clay 3
c1 c2 c3
Mean (kPa) 55 43 56
Stdv. (kPa) 20.4 8.2 13.2
∗
γ (kN/m )
3
21 22 22
*The unit weight γ was not stated in the paper so we selected values that give us deterministic factors of
safety close to those in the paper.
92
Results (Maximum iterations: 100)
Chowdhury & Xu Slide
Failure Mode Factor of Probability of Factor of Probability of
(Layer) Safety Failure Safety Failure
(Bishop (Bishop
simplified) simplified)
Sand
Clay 1
Clay 2
Clay 3
Figure 28.3 – Critical slip circle tangential to lower boundary of clay layer 2
93
Sand
Clay 1
Clay 2
Clay 3
Figure 28.4 – Critical slip circle tangential to lower boundary of clay layer 3
28.5 Example 2
Input Data
(The three clay layers are assumed frictionless.)
Soil Layer
Clay 1 Clay 2 Clay 3
c1 c2 c3
Mean (kPa) 68.1 39.3 50.8
Stdv. (kPa) 6.6 1.4 1.5
∗
γ (kN/m )
3
21 22 22
*The unit weight γ was not stated in the paper so we selected values that give us deterministic factors of
safety close to those in the paper.
Results
Chowdhury & Xu Slide
Failure Mode Factor of Probability of Factor of Probability of
(Layer) Safety Failure Safety Failure
(Bishop (Bishop
simplified) simplified)
94
Sand
Clay 1
Clay 2
Clay 3
Figure 28.5 – Critical slip circle tangential to lower boundary of clay layer 2
Sand
Clay 1
Clay 2
Clay 3
Figure 28.6 – Critical slip circle tangential to lower boundary of clay layer 3
95
28.5 Example 3
Input Data
(The three clay layers are assumed frictionless.)
Soil Layer
Clay 1 Clay 2 Clay 3
c1 c2 c3
Mean (kPa) 136 80 102
Stdv. (kPa) 50 15 24
γ∗ (kN/m ) 21 22 22
3
*The unit weight γ was not stated in the paper so we selected values that give us deterministic factors of
safety close to those in the paper.
Results
Chowdhury & Xu Slide
Failure Mode Factor of Probability of Factor of Probability of
(Layer) Safety Failure Safety Failure
(Bishop (Bishop
simplified) simplified)
Sand
Clay 1
Clay 2
Clay 3
Figure 28.7 – Critical slip circle tangential to lower boundary of clay layer 2
96
Sand
Clay 1
Clay 2
Clay 3
Figure 28.8 – Critical slip circle tangential to lower boundary of clay layer 3
28.6 Example 4
Input Data
Soil Layer
Clay 1 Clay 2 Clay 3
c1(kPa) φ1(o) c2 (kPa) φ2 (o) c3 (kPa) φ3 (o)
Mean 55 5 43 7 56 8
Stdv. 20.4 1 8.7 1.5 13.2 1.7
γ* (kN/m3) 17 22 22
*The unit weight γ was not stated in the paper so we selected values that give us deterministic factors of
safety close to those in the paper.
Results
Chowdhury & Xu Slide
Failure Mode Factor of Probability of Factor of Probability of
(Layer) Safety Failure Safety Failure
(Bishop (Bishop
simplified) simplified)
97
Sand
Clay 1
Clay 2
Clay 3
Sand
Clay 1
Clay 2
Clay 3
Figure 28.10 – Critical slip circle tangential to lower boundary of clay layer 3
98
28.7 Example 5
Input Data
Soil Layer
Layer 1 Layer 2
c1 (kPa) φ1 ( )
o
c2(kPa) φ2 (o)
Mean 10 12 40 0
Stdv. 2 3 8 0
γ (kN/m3) 20 18
Results
Chowdhury & Xu Slide
Failure Mode Factor of Probability of Factor of Probability of
(Layer) Safety Failure Safety Failure
(Bishop (Bishop
simplified) simplified)
Layer 1
(Embankment)
Figure 28.11 – Critical slip circle tangential to interface of embankment and foundation
99
Layer 1
(Embankment)
Figure 28.12 – Critical slip circle tangential to lower boundary of soft foundation layer
100
SLIDE Verification Problem #29
29.1 Introduction
This model is taken from Duncan (2000). It looks at the failure of the 100 ft high underwater
slope at the Lighter Aboard Ship (LASH) terminal at the Port of San Francisco.
101
29.4 Results
Duncan (2000) quotes a deterministic factor of safety of 1.17 and a probability of failure of 18%.
The probability of failure is calculated using the Taylor series technique.
Figure 29.2
102
SLIDE Verification Problem #30
30.1 Introduction
This model is taken from Borges and Cardoso (2002), their case 1 example. It looks at the
stability of a geosynthetic-reinforced embankment on soft soil.
Cu top Cu bottom γ
(kN/m2) (kN/m2) (kN/m3)
Upper Clay 8.49 8.49 17
Middle Clay 8.49 4.725 17
Lower Clay 4.725 13.125 17
103
30.4 Results
Note: Both circle A and B have reverse curvature. Since Slide automatically creates a tension crack in the
portion of the circle with reverse curvature, the shear strength contribution in this region is removed. This is
most likely the reason for the smaller factors of safety in Slide.
104
SLIDE Verification Problem #31
31.1 Introduction
This model is taken from Borges and Cardoso (2002), their case 2 example. It looks at the
stability of a geosynthetic-reinforced embankment on soft soil.
Cu top Cu bottom γ
(kN/m2) (kN/m2) (kN/m3)
Clay1 33 33 17
Clay2 16 16 17
Clay3 16 18.375 17
Clay4 18.375 55.125 17
Figure 31.1
105
31.4 Results
106
SLIDE Verification Problem #32
32.1 Introduction
This model is taken from Borges and Cardoso (2002), their case 3 example. It looks at the
stability of a geosynthetic-reinforced embankment on soft soil.
Cu (kN/m2) γ
(kN/m3)
Clay1 43 18
Clay2 31 16.6
Clay3 30 13.5
Clay4 32 17
Clay5 32 17.5
107
Figure 32.1 – Case 1 – Embankment height = 7m
108
32.4 Results – Case 1 – Embankment height = 7m
109
SLIDE Verification Problem #33
33.1 Introduction
Verification #33 comes from El-Ramly et al (2003). It looks at the assessment of the
probability of unsatisfactory performance (probability of failure) of a Syncrude tailings dyke
in Canada. This example does not consider the spatial variation of soil properties and is
described in the paper as the simplified probabilistic analysis.
Figure 33.1
110
33.3 Geometry and Properties
Phreatic surface in TS
Figure 33.2a
33.4 Results
Factor of Probability of
Safety Failure
Slide 1.305 1.54 x 10-3
El-Ramly et al 1.31 1.6 x 10-3
111
SLIDE Verification Problem #34
34.1 Introduction
This model is taken from Wolff and Harr (1987). It is a model of the Clarence Cannon Dam
in northeastern Missouri, USA. This verification compares probabilistic results from Slide to
those determined by Wolff and Harr for a non-circular critical surface.
Figure 34.1
112
34.3 Geometry and Properties
Sand drain
Critical failure surface
Phase II fill
Phase I fill
Figure 34.2
34.4 Results
Deterministic Probability of
Factor of Safety Failure
Slide (GLE method) 2.333 3.55x 10-3
Slide (Spencer method) 2.383 3.55x 10-3
Wolff and Harr 2.36 4.55 x 10-2
113
SLIDE Verification Problem #35
35.1 Introduction
This model is taken from Hassan and Wolff (1999). It is a model of the Clarence Cannon
Dam in Missouri, USA. This verification problem looks at duplicating reliability index results
for several circular failure surfaces specified in the Hassan and Wolff paper.
114
Figure 35.2. Figures 7 and 8 from the Hassan and Wolff (1999) paper.
Sand drain
Spoil fill
Figure 35.3
Sand filter
Spoil fill
Figure 35.4
115
Table 35.1: Material Properties*
35.4 Results
116
SLIDE Verification Problem #36
36.1 Introduction
This model is taken from Li and Lumb (1987) and Hassan and Wolff (1999). It analyzes
reliability indices of a simple homogeneous slope. This verification looks at comparing the
reliability index of the deterministic global circular failure surface and the minimum
reliability index value obtained from analysis of several failure surfaces.
Material 1
Figure 36.1
117
Table 36.1: Material Properties
36.4 Results
118
SLIDE Verification Problem #37
37.1 Introduction
Verification #37 models a slope reinforcement example described in the Reference Manual of
the slope stability program XSTABL (1999). It illustrates the use of back analysis to
determine the amount of reinforcement required to stabilize a slope to a specified factor of
safety level.
Figure 37.1 describes the slope model. The solution in XSTABL examines failure surfaces
that pass through the toe of the slope. To duplicate that in Slide, we placed a search focus
point at the toe. In addition, to eliminate very small shallow failure surfaces of the slope face
(slip circles that do not intersect the crest), only failure surfaces with a minimum depth of 2m
were considered. Since the XSTABL solution considers a triangularly distributed
reinforcement load along the slope height, the Slide model applies a concentrated force at a
point above the toe that is a third of the slope height.
Next we remodelled the slope, but this time included a reinforced zone with a higher friction
angle calculated from the formula (XSTABL Reference Manual (1999))
φ re inf = tan −1 [ Fr tan (φ )]
Fmin
where Fr = .
Fcrit
We varied the length of the reinforced zone manually until we obtain a factor of safety value
very close to 1.5. Again we required all failure surfaces analyzed to pass through the toe and
included a minimum slope depth to eliminate shallow, face failures.
All our results are provided in Table 37.1
119
37.3 Geometry and Properties
φ = 36o
γ = 20 kN/m3
Figure 37.1
37.4 Results
Figure 37.2
120
Reinforced zone
Length of
reinforced zone
Figure 37.3
121
SLIDE Verification Problem #38
38.1 Introduction
Verification #38 models a typical steep cut slope in Hong Kong. The example is taken from
Ng and Shi (1998). It illustrates the use of finite element groundwater analysis and
conventional limit equilibrium slope stability in the assessment of the stability of the cut.
Steady-state groundwater analysis is conducted using the finite element module in Slide.
Initial conditions of constant total head are applied to both sides of the slope. Three different
initial hydraulic boundary conditions (H=61m, H=62m, H=63m) for the right side of the
slope are considered for the analyses in this section, Figure 38.1. Constant hydraulic
boundary head of 6m is applied on the left side of the slope. A mesh of 1621 six-noded
triangular elements was used to model the problem. Figure 37.3 shows the soil permeability
function used to model the hydraulic conductivity of the soil, Ng (1998).
122
Figure 38.2 Hydraulic conductivity function
The negative pore water pressure, which is commonly refereed to as the matric suction of
soil, above the water table influences the soil shear strength and hence the factor of safety. Ng
and Shi used the modified Mohr-Coulomb failure criterion for the unsaturated soils, which
can be written as
τ = c ' + (σ n − u a ) tan ϕ ' + (u a − u w ) tan ϕ b
where σ n is the normal stress, ϕ b is an angle defining the increase in shear strength for an
increase in matric suction of the soil. Table 38.1 shows the material properties for the soil.
*The raw data for Figure 38.2 can be found in verification#38.sli.
Both positive and negative pore water pressures predicted from groundwater analysis engine
were used in the stability analysis. The Bishop simplified method is used in this analysis.
123
38.3 Results (tolerance = 0.0001)
Critical slip
surface
Pressure head
contours
Figure 38.3 Slide groundwater and slope stability results for H=63m
124
SLIDE Verification Problem #39
39.1 Introduction
This model is taken from Tandjiria (2002), their problem 1 example. It looks at the stability
of a geosynthetic-reinforced embankment on soft soil. The problem looks at the stability of
the embankment if it consists of either a sand fill or an undrained clayey fill. Both are
analyzed.
125
Figure 39.2 - Sand Fill Embankment
126
39.8 Circular Results – Clay embankment with reinforcement
127