0% found this document useful (0 votes)
39 views1 page

Duration of Activity Research

This document provides information about a term paper for a civil engineering student named Kamran Ullah Khan. The topic of the term paper is project planning. The objective is to understand the percentage of consultants that create project schedules and the reasons consultants may not create schedules. It will also examine various methods for calculating activity durations, which are important inputs for determining total project duration, resource needs, and costs. The student plans to distribute a simple questionnaire locally in Quetta, Balochistan to consultants and construction professionals to gather information.

Uploaded by

kkhan_451062
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

Duration of Activity Research

This document provides information about a term paper for a civil engineering student named Kamran Ullah Khan. The topic of the term paper is project planning. The objective is to understand the percentage of consultants that create project schedules and the reasons consultants may not create schedules. It will also examine various methods for calculating activity durations, which are important inputs for determining total project duration, resource needs, and costs. The student plans to distribute a simple questionnaire locally in Quetta, Balochistan to consultants and construction professionals to gather information.

Uploaded by

kkhan_451062
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Name : Kamran Ullah Khan Roll number: CE-075/2018-19

Term paper Topic: Project planning

Synopsis: The objective of my Term paper will to get know the percent
of consultants which are making schedule and The Reason why the
consultant is not making schedule .
Also to get know the Various methods for Calculating the
Activity Duration as this is input for calculating the Total project
duration, Resources Calculation and Cost of project etc.
The questionnaire language will be simple to get response from local
industry of Quetta ,Balochistan .Being the resident of Quetta it will be
easier for me to distribute the Questionnaire to the Consultant located
in Quetta, Balochistan.The Questionnaire may be also distributed to the
site engineer/Supervisor or construction manager of construction firm .