Step 1: Tools and Materials
Page 1 of 1013
Materials: Formatted: Justified
For the sledge:
Formatted: Font: 10 pt
-Paris expedition sledge or
similar
-14 grommets (diameter of
Page 2 of 1013
inside hole about 1.2mm)
-about 5.3m of 8mm elastic rope (found at local shop called Kumipörssi that sells rubber, hoses and other
stuff)
-10 metal rings (2.5cm diameter) from local shoemaker. These are welded and a lot stronger than
keyrings
-5 hooks (see picture) found at shelby.fi. As you can see on the pictures I bent the little hook toward the
inside to allow for easier hooking/unhooking. The elastic rope provides enough tension to keep the hooks
from unhooking.
-3-4m of suitable rope to be used for pulling the sledge without the harness. Since I use my sledge also
as a winter wheelbarrow for pulling around firewood at home I find it very useful. Rarely used on tour but
also good as a backup in case something happens with the rods.
For the pulling system: Formatted: Font: 10 pt, Font color: Custom
-2 glassfiber rods/pipes about 180cm long and Color(RGB(85,85,85))
1.5cm diameter. I got these also from Kumipörssi
Formatted: Font: 10 pt
and have no idea what they are called or what
they are made for. In five years these rods have
seen a lot of twisting and bending and they work
just like on the first day.
-4 pieces of 6mm climbing accessory cord à 50cm
(these will become the connection between pulk
and rod/ rod and harness)
-transparent tape (to somehow prevent the rod
from breaking when drilling. No idea if that was
necessary)
-4 pieces of "rubber hose air-water 10 -
15x21mm". This is a slightly thicker hose that fits
snugly over the glassfiber rods and protects the
ropes and the rod ends from damage.
- some liquid soap to lubricate the pipe ends and
help sliding the hose pieces on the pipe ends.
-6 pieces of thin cord (about 1-2mm and 10-15cm
length). I use "planer board line" because it's a
very versatile string also for tarps and lanyards
but other string will do fine. These will be used to
help fiddling the connector ropes and also to
prevent loosing the two lynch pin rings
-2 lynchpin rings
-2x 20mm straps with metal lock about 100cm
long (cut to length later) to tie the rods together
and to attach them to the pulk.
-Belt: I use the German army webbing belt as it is
cheap, robust, wide and comes with holes and a
harness (most of the time I only use the belt without the harness). Previously I also used old seatbelt with
a 2nd hand 50mm backpack buckle and four grommets for the attachment. In this instructable you will
see both belts.
Tools:
-knife
-scissors
-fire / lighter
-6mm drill bit (to drill through the poles and the hose)
-drill
-step drill bit (to increase size of the holes in the pulk so that they match the grommets)
-tools for placing the grommets (I went to a place that makes covers for trucks and they allowed me using
theirs)
-measuring tape
-pipe cutter or fine saw if you need to cut your fibreglass rods to length
Page 3 of 1013
Page 4 of 1013
- widen the holes with the step drill bit to allow a good fit of the grommets Formatted: Font: 10 pt
- hit the grommets in hard. The material of the pulk is very forgiving and I had to bend it out a bit so that
Formatted: Justified
the big tools for the workshop fit between body and edge of pulk.
- taper/burn the tips of the elastic rope
Page 5 of 1013
- fold rope in half and thread both ends it from underneath upwards through the last two holes (pic)
- thread one of the ends through the first hook and thread both ropes from up in to the next grommet on
each side (pic)
- thread both ends on each side through a metal ring and then up through the same hole again (pic)
- repeat until you used the last hook
- thread elastic rope from up through last hole and tie rope to the last ring with a simple, tight overhand
knot (pic). You could also just make a big knot instead but I found that the ring helps opening the knot if
I ever have to (think repair with gloves at -20*C)
- adjust the elastic moving from front to back to ensure equal stretch of the rope. It should be petty loose.
- work on the sledge part is ready (pic) Formatted: Font: 10 pt, Font color: Custom
Color(RGB(85,85,85))
Step 3: Work on the Poles
Page 6 of 1013
- wrap the ends of each pole in a thin layer of transparent tape Formatted: Font: 10 pt, Font color: Custom
- drill a 6mm hole about 5cm from the end of the pole through each end of the poles (pic) Color(RGB(85,85,85))
- lay the hose pieces next to the poles so that the hose is about 1.5cm longer than the pipe (pic)
Formatted: Justified
- drill a 6mm hole through the hose parallel to the hole on the pole
- slide hose over pole and align the holes ( you might want to use some soap to make this step easier) Formatted: Font: 10 pt
It might be easier to drill through pole and hose at the same time, but I wanted to make sure that my
holes go through the middle.
Repeat for all four pipe ends.
- push a loop of the thin string into the pipe end past the drilled hole. This loop will help pulling the bigger
string out (pic).
- push 6mm rope through the holes of the pipe ends. it helps to melt/ harden the first few centimetres of
the rope with fire (pic)
- add stopper knots to each rope end and pull on the thin string until rope eme rges and tie a small piece
of string permanently to the loop (pic).
- repeat on all four pole ends
- attach the two lynch pin rings with a short piece of string to one end of each pole (pic)
- tie the two poles together at the middle using one of the 20mm straps (pic) to create a crossing point.
Page 7 of 1013
If you use seatbelt do like this (pic). Otherwise use the German army belt. Formatted: Font: 10 pt
Step 5: Assembly Formatted: Justified
Formatted: Font: 10 pt, Not Bold, Font color: Custom
Color(RGB(85,85,85)), Border: : (No border)
Page 8 of 1013
- on the pulk thread the rope loops (use the ends Formatted: Font: 10 pt
without the pin rings) from up through the same
Formatted: Justified
holes as the last bit of the elastic rope (pic)
- thread the rope loops up through the next (empty)
hole
- connect the two rope loops with the second strap.
It helps to put the poles "standing" on the pulk
when doing this to get the best tension (pic).
Formatted: Font: 10 pt
Page 9 of 1013
A future project will include a combination of my sled with a single wheel hiking trailer to facilitate a
modern hunter gatherer lifestyle in Finland.
Another idea is to build one ahkio out of two Paris pulks by cutting the ends off and make one long
"telescopic" pulk that could also be split in half and used by two people.
Page 10 of 1013