Abstract Estimation For The Proposed Building at Plot No: 142, Chennai 107, Building Materials List and The Cost With Clay Bricks

This document provides an estimate for building materials and their costs for a proposed building at plot No. 142 in Chennai 107. It lists various building materials like TMT steel, cement, sand, bricks, tiles, and their estimated quantities, unit rates, and total costs. The total estimated cost for foundation and superstructure is Rs. 1,49,41,400. The prices are for foundation and superstructure only and may change, and quantities depend on the actual design.

Uploaded by

joni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

Abstract Estimation For The Proposed Building at Plot No: 142, Chennai 107, Building Materials List and The Cost With Clay Bricks

This document provides an estimate for building materials and their costs for a proposed building at plot No. 142 in Chennai 107. It lists various building materials like TMT steel, cement, sand, bricks, tiles, and their estimated quantities, unit rates, and total costs. The total estimated cost for foundation and superstructure is Rs. 1,49,41,400. The prices are for foundation and superstructure only and may change, and quantities depend on the actual design.

Uploaded by

joni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

COMPANY NAME & ADDRESS OWNER NAME & ADDRESS

SUS CONSTRUCTION K.S. ARUN SABHAPATHY

GROUND FLOOR, SUS BUILDING, OLD NO: 21, NEW NO: 6,

PLACE ROAD, THUCKALAY V.G.P. NAGER, MOGAPPAIR,

PIN-629175 CHENNAI- 37
PROPRIOTER: UNNI SHANKER CELL:
CELL: +91-9994079078

Abstract Estimation for the proposed building at plot No: 142, Chennai 107,

Building Materials list and the cost with Clay Bricks

Materials Required Quantity Unit Unit prize Standard

TMT Steel 50 Tonnes 61000 Rs.30,50,000.00

Cement 4050 Bags 375 Rs.15,18,750.00

Wall & Plastering Sand 500 Tonnes 5000 Rs.25,000,00.00

For Wall Concrete M Sand 185 Tonnes 1500 Rs.2,77,500.00

40mm Jelly 800 Cft 40.00 Rs.32,000.00

20mm Jelly 8750 Cft 45.00 Rs.3,93,750.00

Clay Bricks (4") 62000 Nos. 8.00 Rs.4,96,000.00

Flooring work by tiles 9500 Sqft 150 Rs.14,25,000.00

Timber 425 Cft 2200 Rs.9,35,000.00

Sanitary Fittings L.S - - Rs.9,00,000.00

Electricals fittings L.S - - Rs.4,00,000.00


Materials Required Quantity Unit Unit prize Standard

Other special fittings like -


L.S - Rs.3,50,000.00
steel and glass

Labor charges 6900 Sqft 350 Rs.24,15,000.00

Other charges like -


L.S - Rs.2,48,400.00
Excavation and finishing

Total Cost of the Building is Rs.1,49,41,400.00

Above mentioned prices are for foundation & super structure only.

Above mentioned quantity is approximate and depends on actual design.

Prices are subjected to change. Rates last updated on 11st February 2019.