Time Categorisation and Activity For PCS: Table 1 Schedule Hours Stand by Delay

Table 1 categorizes the time and activities for PCS equipment on a mining site. It divides hours into operational hours, standby hours, maintenance hours, and available hours. Operational hours are when the equipment is actively mining. Standby hours are when the equipment is on site but not operating. Maintenance hours include both planned and unplanned maintenance. Available hours are the total scheduled hours in a day minus any delays. The table also defines key performance metrics like productivity, reliability, mean time between failures, and mean time to repair.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Time Categorisation and Activity For PCS: Table 1 Schedule Hours Stand by Delay

Table 1 categorizes the time and activities for PCS equipment on a mining site. It divides hours into operational hours, standby hours, maintenance hours, and available hours. Operational hours are when the equipment is actively mining. Standby hours are when the equipment is on site but not operating. Maintenance hours include both planned and unplanned maintenance. Available hours are the total scheduled hours in a day minus any delays. The table also defines key performance metrics like productivity, reliability, mean time between failures, and mean time to repair.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

TABLE 1

TIME CATEGORISATION AND ACTIVITY FOR PCS


SCHEDULE HOURS (SCH)
AVAILABLE HOURS (A) MAINTENANCE (M)
OPEARTION HOURS (OPT) STAND BY (SBY) UNPLAN PLAN
READY HOURS (R) DELAY (D)
DEFINITION / REASON CODEDEFINITION / REASON CODE DEFINITION / REASON CODE DEFINITION / REASON CODEDEFINITION / REASONCODE
1RNT - RENTAL 100 BLASTING (<0.1 SMU sto 200 BERKABUT 300 ELECTRIC 400 MODIF. MAINT 500
2CGT - COAL GETTING 101 GENERAL SUPPORT W 201 BLASTING (>0.1 SMU stop) 301 ENGINE 401 MODIF.OPR 501
2CHL - COAL HAULING 102 OTHER 202 DEMONSTRASI/INDUSTRIAL 302 GET 402 OTHER PM 502
2OBR - OVERBURDEN 103 REFUELING 203 GANTI SHIFT 303 HYDRAULIC SYSTEM 403 OVERHAUL/PCR 503
2PPS - PLANT PROCESS 104 TOILET STOP 204 HUJAN 304 OTHER UM 404 SERVICE PM 504
2RCL - RECLAMATION 105 TRAVEL TIME 205 ISTIRAHAT MAKAN 305 TRANSMISSION/DRIVE TRA 405 TA/INSPEKSI 505
2RDC - ROAD CONSTRUC106 WAITING ON OTHER EQ 206 JALAN LICIN 306 TYRE 406 TYRE 506
2RDM - ROAD MAINTENA 107 CLEANUP 207 OTHER 307 UNDER CARRIAGE 407
OTHER 108 LUBE & GREASE 208 P2H/PRESTART CEK 308 ACCIDENT DAMAGE 408
SAFETY MEETING 309 MENUNGGU MEKANIK 409
SEMBAHYANG 310 MENUNGGU PART/CONSM/ 410
STOP FROM CLIENT 311 SPION 411
TIDAK ADA OPERATOR 312 LAMPU 412
TUNGGU PERINTAH 313 KLAKSON 413
AVAILABLE NOT REQUIRED 314 GREASE SYSTEM 414
REFUELING 315 TEST ALAT 415
LUBE & GREASE 316 AC 416
DOWN DUE TO SAFETY 417

SCH = 24 jam PRODUCTIVITY (BCM,TONS or meter /OPT hrs) BCM or TON or M /


PHY. AVAILABILITY (PA) A/SCH OPT
NET PRODUCTIVITY (BCM,TON, or meter /WK hrs) BCM or TON or M /
OPT
USE OF AVAILABILITY (UoA) OPT/A RELIABILITY Ready Hrs/(Ready Hrs+UNPLAN.MAINT)
MEAN TIME BETWEEN FAILURE (MTBF) = Ready Hrs/
UTILSATION (UT) OPT/SCH or PA x UoA No. Of. Break downs
MEAN TIME TO REPAIR (MTTR) UNPLAN. Maint/
note : SBY = SMU NOT RUNNING, DELAYED = SMU RUNNING No. Of Break downs